 The catchment which discharges to the existing pit in the pre-development case is shown in
 Figure 2.




             SITE




Existing gully pit




      Figure 2 – Existing Gully Pit Catchment (sourced from Noosa Council Mapping)

 The following parameters were used to calculated the stormwater discharge from the
 catchment:

 Total catchment discharge to existing pit in Picture Point Crescent pre-development
 parameters:

 Area: 3767m2
 Fraction impervious: 50%
 Average Slope: 8%

 Total catchment discharge to existing pit in Picture Point Crescent post-development
 parameters:

 Area: 4278m2 (includes 511m2 of future roof area)
 Fraction impervious: 55%
 Average Slope: 8%

 Using the above parameters, the stormwater discharge in the pre-development and post-
 development scenarios to Picture Point Crescent were calculated using the rational method as
 shown in Appendix B and summarised in Table 1.

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Reporting.pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.