3
The catchment which discharges to the existing pit in the pre-development case is shown in
Figure 2.
SITE
Existing gully pit
Figure 2 – Existing Gully Pit Catchment (sourced from Noosa Council Mapping)
The following parameters were used to calculated the stormwater discharge from the
catchment:
Total catchment discharge to existing pit in Picture Point Crescent pre-development
parameters:
Area: 3767m2
Fraction impervious: 50%
Average Slope: 8%
Total catchment discharge to existing pit in Picture Point Crescent post-development
parameters:
Area: 4278m2 (includes 511m2 of future roof area)
Fraction impervious: 55%
Average Slope: 8%
Using the above parameters, the stormwater discharge in the pre-development and post-
development scenarios to Picture Point Crescent were calculated using the rational method as
shown in Appendix B and summarised in Table 1.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Reporting.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.