Original source · versioned page text
OPW14/0197 Approved Plans Part 3 (N13078)
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn NOTE:
REFER TO N13078-200 FOR
SEWERAGE RETICULATION lEGEND.
SEWER L1VEWORKS TABLE
5EW HH/M5 COVER LOT
NO, DESCRIPTION HH No. F.S.l. E.5.1. I.t. OEPTH
D1A TYPE TYPE No.
/ 71 70 UNITYWATER TO BREAK INTO EXISTING MH EX.V1 AND
/
1IA) CONSTRUCT 1601Zl STUB I(APPEOl PRIOR TO 51 ART OF 160 EX,V1 F - - 8.652 8.652 6.900 1,752
- CONSTRUCTION.
/
/ a.SOm FROM STUB END CAP, CONTRACTOR TO lAY ALL
N
/
\ 1(6) RETICULA nON SEWERS. AFTER CLEANSING, TESTING AND
INSPECTION. NOTIFY UNtTYWATER.
I UNITYWATER TO REMOVE TEMPORARY END CAP IN HH EX.V1 AND
lfCi HAKE LIVE CONNECTION AFTER SUCCESSFUL 'ON MAINTENANCE'
", INSPECTION.
UNITYWATER TO BREAK INTO EXISTING NH EX.1I2 AND
21'1 CONSTRUCT 160!Zl STUB ((APPEDI PRIOR TO Sf ART OF 160 EX,1I2 F - - 10.76 10,76 8.75 2.010
CONSTRUCTION.
EXISTING 2(BI
O.SOm FROM STUB ENO CAP, CONTRACTOR TO lAY LINES 14 AND
1S. AFTER CLEANSING, TESTING AND INSPECTION, NOTIFY
STAGE B UNITYWATER,
UNlTYWATER TO REMOVE TEMPORARY END CAP IN MH EX.1I2
/ "'i~118 117 2(0 AND MAKE LIVE CONNECTION AFTER SUCCESSFUL 'ON
/' MAINTENANCE' INSPECTION.
SEWER RETICULATION NOTES
EXISTING'lS0~~PVC
I. ALL WORK AtID HATERIALS SHALL BE IN ACCORDANCEWITH fOLLOWING CURRENT SPECIFICATIONS AND STANDAROS liN
-SEWER"MAi~
OROfR OF PRIORITY!:
- SOUTH EAST UEENSLAND SEWERAGE CODE ISf -SP'sl
- SEWERAGE CODE OF AUSTRALIA WSA02-2002 V2. .
2. UNLESS SPECIFfD OTHERWISE. All WORK ANO MATERIAlS SHALL COMPLY WITH THE RfLEVANT AUSTRALIAN STANDARDS.
3. THE CONSTRUCTIONOF THE SEWERAGE WORK SHOWN ON THIS DRAWING MUST HAVE CONTRACT ADI1lNISTRATION
UNDERTAKEN BY AN ENGINEERWHO HAS RF'E REGISTRATION. WORK NOT COMPlY~G WITH THIS RE UIREMENT••••U NOT
r BE PERMITTED TO CONNECTTO THE RETIC JLATlON SYSTEM.
4. ALL ••••ORK ASSOCIATED TH LIVE SEWERS OR MAlHTENANCE HOLES HALL BE CARRIED OUT BY THE SE SERVKE
PROVIDER AT THE DEVELOPERS COST.
5. ALL PIPES AND HATERIAlS SHALL COMPLY ••••ITH THE RE UIREMENTSOF THE 'ACCEPTED PRODUCTS AND MATERIALS' LIST.
6. EACH AllOTMENT SHAll Bf SERVED BY A CNno PE lOR CN100 uPVCI PROPERTY CONNECTION.fOR ALLOTMENTS OTHER
THAN SINGLE RESIDENTIAL. A DN160 PE lOR DN1SOuPVCI PROPERTY CONNECTIONSMALL BE PROVIDED.
I 7, PROPERTY CONNfCTIONS SHALL BE LOCATED WITHIN THE PROPERTY AS SHOWN IN THE DRAWINGS.
8. PROPERTY CONNECTIONBRANCHES SHALL EXTEND INTO THE PROPERTY A I'1lNII'1UMOF SOO nmIUNITYWATERI AND A
/ HAXIMUH OF 750m,".
9. WHERE PIPES ARE LAID IN flLL. THE fILLING SHALL & CARRIED OUT IN LAYERS NOT EXCEEDING300mm ILOOSEI IN DEPTH
---- AND SHALL BE COHPACTEO UNTR. THE COMPACTIONIS NOT LESS THAN 95 OF THE MATERIAL'S MAXIMl.tl COMPACTION
WHEN TESTED IN ACCORDANCEWITH A.S. 12U (MOOIFlEOCOMPACTION). TESTING SHALL BE CARRIED OUT AFTER EACH
ALTERNATE LAYER. IN ALL SUCH CASES, APPROVAL OF CONSTRUCTEDSEWERS WLl NOT BE ISSUED BY SE SERVICE
PROVIDER UNLESS CERTIFICATES ARE PROCUCEOCERTIFYING THAT THE RE UIRfO COMPACTIONHAS BEEN ACHIEVED.
/
, 10. WHERE SEWERS HAVE A GRADE OF I IN 20 OR STEEPER. Bll.I<HEADS SHALL BE CONSTRUCTEDIN ACCORDANCEWITH THE
, It
SE -SP's.
THE CONTRACTORSHALL VERIFY THE lOCATION AND OfPTH OF EXISTING SERVICES WITH RELEVANT AUTHOOITIES BEFORE
/ COHMENC~G WOOKS.
I 12.
1.
14.
SE••••ER SHALL BE DlSUSED/ABAhOONED IN ACCORDANCE'WITH PROCEDURESSET OUT IN THE SE -SP's.
BENCHMARK AND LEVEL TO AHD.
EXISTING ALL TMfNTS RE UIRINGA PROPERTY CONNECTIONFROH EXISTING SEWERS SHALL BE PROVIDED BY THE SE
SERVICE PROVlOER AT THE DEVElOPERS COST.
-
NOTE: NOOSA COUNCIL
NOTWITHSTANDING THAT EXISTING SERVICES MAY OR HAY NOT BE SHOWN ON THE JOB DRAWINGS,
NO RESPONSIBILITY IS TAKEN BY THE SUPERINTENDENT OR THE PRINCIPLE FOR THIS INFORM A TlON APPROVED PLANS
WHICH HAS BEEN SUPPLIED BY OTHERS. THE OEl AILS ARE PROVIOED FOR INFORM A TlON ONLY.
THE CONTRACTOR SHALL ASCERTAIN THE POSITION OF ANY UNDERGROUND SERVICES IN THIS AREA OPW14/0197 3 OCT 2014
AND SHAll BE RESPONSIBLE FOR MAKING GOOO ANY DAMAGE THERETO.
-- _
~.,
-~ ""'"
I-..-=..
.c ••••.•I "Toa I lIIIC_UOlle. OII"_flfU
""" e.tI.Q.lIIo_ •••11
SURVEYOR: RPS
BROWN
••• II J,
OM PROPERTIES SEWER RETICULATION
, ""'"'"".,"""
IUl10
1 INNOVATION PARKWAY, BIRTINYA
A lIT .l lLN.l~ fl.Sf~~TS AlUD TOsa (1f P!I IiflTH1If1J:IlS.
Ph 107) S436 7888 Fall: 1071 5493 6630 "or# LAYOUT PLAN
"
-
1500 10
SHEET 3 OF 3
--I/"~
C N "
c:.u..•••• <H:Clt \1000 H 8IOWIICn;1lrC «lDl PIl lid
"
5l!llJI",oom~'.l.m
LAKE DOONELLA NOOSA
,
D
N13078
1\111(\11&1aft: 11501
!IIlIlT lIOlIS llPf~ 11011
STAGE Cl • C6
Smart Consulting
--- . .....
~J, 11•••••
T•••••
""",,
'J1 suo t'l~
~ QlDAorii WS
FaNI 07sm 9262 ., 011"_..-0
N13078.202 A
~ II)j!llPl.llJ Of 8Ralo~ (OIoSU.TJICiICl.OI",y lTll
.'"
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.