Original source · versioned page text
TPC 1673 Decision (May 1984)
Letter T.P.C. 1673 Cont'd - page 3 - 12. 13. 14, 15. 16. 17. 18. 19. To ensure compliance with any and all conditions of this approval, Council will require that you enter into a Bank Bond to guarantee performance. The value of such bond would be determined and would need to be lodged prior to issue of a building permit and any costs incidental thereto will be the applicant's responsibility. The conditions of this permit are to be completed prior to occupancy of the building and if this is not done, Council reserves the right to call on bond moneys lodged to carry out the works involved. Provision shall be made for the storage and removal of refuse in accordance with the Council's policies and to the requirements of the Council's Health Surveyor. The location of points for mail delivery (Letterboxes) shall be to the requiranents of Australia Post, generally in accordance with its policy on the matter. The electricity supply facilities to the site shall be upgraded to the requirements of the S.F.Q.E.B. The development should be carried out in accordance with minimum floor levels and filling levels to the requirements of the Council's Shire Engineer. The offer to contribute to water supply augmentation in the amount of $5,400 is accepted. Such contribution shall be made prior to the issue of a building permit. The development shall be carried out so as not to interfere with the existing circumstances or stability of a concrete canal revetment wall and associated works on the boundary of the site adjoining the canal. Yours faithfully, 2 D.J. Philpot, SHTRE CLERK,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.