IDAS form 1-Application details
(Sustainable Planning Act 2009 version 4.1 effective 4 July 2014)
This form must be used for ALL development applications.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete this form (IDAS form 1-Application details)
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompa~y your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications reiating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on alilDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Namels (individual or company name in full) I Edward P Cheetham
For companies, contact name
803 Cooroy-Noosa Road
DeVe/Opm<:lnt
•• C' Ounter
. -
,.
Suburb Coo roy
1 4 APR 2015
,
" State OLD I Postcode 14563
Tewantin Country AUS
Contact phone number I 07 5442 6506
Mobile number (non-mandatory requirement) I 0438541711
Fax number (non-mandatory requirement)
, It ••
Great state. Great opportunity.
Queensland
Government _
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 25 pages
Page 2
Email address (non-mandatory requirement) I [email protected]
Applicant's reference number (non-mandatory
requirement)
1. What is the nature of the development proposed and what type of approval is being sought?
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work !8lOperational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval D Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
Filling to the extent specified to allow future development of a residence and an adjacent machinery shed on a
13ha property currently used for cattle grazing. All future work will be subject to Engineering design and
Development Approval. The approval is sought now to bring fill on site that is currently available that will
make future proposed use possible. The overall plan is to build a lifestyle property to incorporate existing
wildlife and establish an environment for local Koalas with a specific tree planting. The enclosed Letter of
Intent details current operational work proposed.
d) What is the level of assessment? (Please only tick one box.)
~ Impact assessment ~ Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
D Material change of use D Reconfiguring a lot D Building work D Operational work
b) What is the approval type? (Please only tick one box.)
D Preliminary approval D Preliminary approval D Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
D Impact assessment D Code assessment
IDAS form 1-Application details
Version 4.1-4 July 2014
Page 3
Table C-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule ~ Not required
IDAS form 1-Application details
Version 4.1-4 July 2014
Page 4
2. Location of the premises (Complete Table D and/or Table E as applicable. Identify each lot in a separate row.)
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
0 Street address and lot on plan (All lots must be listed.)
0 Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
B<:::>'3 <-eu- f'-cY- 1'\0<><;''''- F«>N7 description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/locality name code and plan no.
i) ldt''7 ~1f)t4A- lMlt- 1"'7 a" J NO<> <;A-
ii) €.03 Ceo t4f'7 - ~,oo ~ P.,) 4~'~ v.evc;e,s'l
iii) ~8'88'&"
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
0 GDA94
0 WGS84
0 other
3. Total area of the premises on which the development is proposed (indicate square metres)
113051 square meters
4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)
I Cattle grazing to vacant land
IDAS fOIm I-Application details
Version 4.1-4 July 2014
Page 5
1-'--
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement)
~ No o Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner's consent required for this application? (Refer to notes at the end of this form for more information.)
~ No
o Yes-complete either Table F, Table G or Table H as applicable
Table F
Name of ownerls of the land
INJe, the above-mentioned ownerls of the land, consent to the making of this application.
Signature of ownerls of the land
Date
Table G
Name of ownerls of the land I
o The owner's written consent is attached or will be provided separately to the assessment manager.
Table H
Name of ownerls of the land I
o By making this application, I, the applican~ declare that the owner has given written oonsentto the making of the application.
7. Identify if any of the following apply to the premises (Tick applicable box/es.)
Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete Table I
~
o On strategic port land under the Transport Infrastructure Act 1994-complete Table J
o In a tidal water area-complete Table K
o On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
o Listed on either the Contaminated Land Register (CLR) or the Environmental
the Environmental Protection Act 1994 (no table requires completion)
Management Register (EMR) under
Table I
Name of water body, watercourse or aquifer
Six Mile Creek, within the Noosa Water Catchment Areas
IDAS fonn I-Application details
Version 4.1-4 July 2014
Page 6
Table J
Lot on plan description for strategic port land Port authority for the lot
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water etc)
D No ~ Yes-ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal include new building work or operational work on the premises? (Including any
services)
D No ~ Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)
~ No-go to question 12 DYes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of this fonm for more
information.)
D No
D Yes-complete Table L and submit with this application the yellow local government/private certifier's copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, S, E, L or P)
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
~ No
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1-Application details
Version 4.1-4 July 2014
Page 7
13. List below all of the forms and supporting information that accompany this application (Include alilDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
IDAS form 1 In person
IDAS form 6 In person
Schedule 3 Check list 4 Assessable Development (Operational Work) In person
Site Plan 1 :2000 A3 size (6 copies) In person
Noosa Plan Biodiversity Overlay A4 and Survey Map In person
114. Applicant's declaration
~ By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information)
Notes for completing this form
• Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly.m2':'", 2;:,::,1;~:,,~;,:,~.
Note, the assessment manager has discretion to accept an application as properly made despite any non.
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009
Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
: .::. ~.:: : .: ::-.: :::::"::':':~,':~:GPlanning Regulation 2009 identifies assessable development and the type of
2~~",~~~en!. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required Iv;
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
, .. : _ :.. •. :':.: :::. ::'.:.~ .:~ .'~~:::::tion must contain, or be accompanied by, the written consent of the
-:,..•noe', 0), il',,~lu,i~ '3 ri~c;laration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
t')' ~'.'!~c:!'!':~ =
C'f~!"!=!!0,==t!0~ 0!"2!'!t!t!eme!'!t to st3te resource. HC'Never, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be re4u~i"e~. ';i:v"'Q~;Vll VI ~II~;~:""'"~"~
~v ~i,,,,~~c.I~C
resource is a separate process and will need to be obtained before development commences.
Question 7
• If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental
Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
seek compliance assessment. Schedule 18 of the Sustainable rlarlll;'-I~~c~u;a;';uil
LVUO;wclli;;-;c;:)
where compliance assessment is required.
Question 11
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• Th~ r0ri"bl~ long s~rvice leave levy amount and other prescrib~d percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
tDAS form I-Application details
Version 4.1-4 July 2014
Page 8
Question 12
• The portable long service leave levy need not be paid when the application is made, but the Building and
Construction tndustry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
• Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800803481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received ~ ~I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the
---------------- I building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
QLeave project Amount paid form sighted by
Description of the work Date paid who sighted the
number ($) assessment
form
manaoer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
10113 oGOV (13 74 68)
[email protected] IDAS form 1-Application delails
Version 4.1-4 July 2014
www.dsdip.qld.gov.au
Page 9
Department of State Development, Infrastructure and Planning
IDAS form 6-Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
• complete IDAS form 1-Application details
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.auIMyDAS
I Mandatory requirements
1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
boxes.)
D Building work-complete Table A [8J Operational work-complete Table B
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
I I
b) Are there any current approvals associated with this application? (e.g. material change of use.)
D No D Yes- provide details below
List of approval referencels Date approved (ddlmmlyy) Date approval lapses (dd/mm/yy)
Development Gounter
,
Great state. Great opportunity.
-- --, --
I'. ,
---,
1 4 APR 2015
Tewantin
'.
.:th'..
:,~r;;
'I /f:
I
I
,__ _
e-
Queensland
Government
Page 10
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
o Road works 0 Stormwater 0 Water infrastructure
o Drainage works ~ Earthworks 0 Sewerage infrastructure
o Landscaping 0 Signage 0 Clearing vegetation under the planning scheme
o Other-provide details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
----------------
~ No 0 Yes-specify the number of lots being created 1 _
c) Are there any current approvals associated with this application? (E.g. material change of use.)
~ No 0 Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
2. What is the dollar value of the proposed building work? $0
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? $ 5,000
(Inc GST, materials and labour.)
I Mandatory supporting information
4. Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are ~ Confirmed
recommended scales) which shows the following:
• the location and site area of the land to which the application relates
(relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
• any existing or proposed easements on the relevant land and their
function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land.
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 11
A statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant
o Confirmed
to the application.
A statement addressing the relevant part(s) of the State Development D Confirmed
Assessment Provisions (SOAP). o Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1:50,1:100 or 1:200 are D Confirmed
recommended scales) which show the following: o Not applicable
• the north point
• the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
• the room layout (for residential development only) with all rooms clearly
labelled
• the existing and the proposed built form (for extensions only)
• the gross floor area of each proposed floor area .
Elevations drawn to an appropriate scale (1:100,1:200 or 1:500 are D Confirmed
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation).
o Not applicable
Plans showing the size, location, proposed site cover, proposed maximum D Confirmed
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.
o Not applicable
Plans showing the extent of any demolition that is assessable development. D Confirmed
o Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: o Confirmed
• existing and proposed contours D Not applicable
• areas to be cut and filled
• the location and level of any permanent survey marks or reference
stations used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood level (if applicable)
• the fill level (if applicable) .
Applications for operational work involving roadworks
Drawings showing: D Confirmed
• existing and proposed contours o Not applicable
• the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
street furniture
• pavement markinQs includino details on raised pavement markers
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 12
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing: D Confirmed
• existing and proposed contours ~ Not applicable
• drainage locations, diameters and class of pipe, open drains and
easements
• manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: D Confirmed
• kerb lines or edge of pavement where kerb is not constructed ~ Not applicable
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs .
Applications for operational work involving sewerage reticulation
Drawings showing: D Confirmed
• location of all existing and proposed services ~ Not applicable
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable) .
Applications for operational work involving street lighting
Drawings showing: D Confirmed
• location of all light poles and service conduits ~ Not applicable
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of anv variations to normal alianment
IDAS form 6-Building or operational work assessable
against a planning scheme
Version 3.0-1 July 2013
Page 13
• details of lighting levels . I
Applications for operational work involving public utility services
Drawings showing: o Confirmed
• any existing light poles and power poles [2J Not applicable
• any existing underground services
• details of proposed services
• alteration to existing services .
Applications for operational work involving landscaping works
Drawings showing: o Confirmed
• the location of proposed plant species [2J Not applicable
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details .
Privacy-Please refer to your assessment manager, referral agency andlor building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received ___________
~I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 1S009 City East Old 4002
tol13 OGOV (13 74 68) IDAS fonn f>-Building or operational worl< assessable
[email protected] against a ptanning scheme
Version 3.0-1 July 2013
www.dsdip.qld.gov.au
Page 14
Department of State Development. Infrastructure and Planning
Schedule 3 Assessable Development
Checklist 4-0perational work
(Sustainable Planning Act 2009 version 4.1 effective 1 October 2014)
This checklist only applies when the development application seeks approval for operational work. Before completing
this checklist, please complete Checklist 1-Various aspects of development.
You may complete this checklist as part of your development application. The checklist will:
• help you identify whether you need to make a development application for the proposed development
• help you identify the relevant Integrated Development Assessment System (IDAS) form you need to complete as
part of your application
• assist in identifying the assessment manager or referral agency for development that is assessable development
under schedule 3 of the Sustainable Planning Regulation 2009.
If your development involves reconfiguring a lot, buiiding work or material change of use, it is recommended you
complete Checklist 2-Material change of use, Checklist 3-Reconfiguring a lot, or checklist 5-Buifding work, where
relevan!.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of State
Development, Infrastructure and Planning's website at www.dsdip.gld.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
I Part 1-General questions
1.1 Is the operational work clearing native vegetation on:
• freehold land
• indigenous land
• any of the following under the Land Act 1994:
land subject to a lease
a road
trust land, other than indigenous land
land subject to a licence or permit?
~ No • Continue to question 1.2
D • Complete part 2 of this checklist
1.2 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is
also assessable development?
~ No • Continue to question 1.3
D • Complete part 3 of this checklist
Development :;ounter
1 4 APR 2015
Tewantin
Great state. Great opportunity.
Queensland
Gov~fIlment
Page 15
1.3 Does any of the proposed operational work involve taking or interfering with:
° water from a watercourse, lake or spring, or from a dam constructed on a watercourse or lake
° artesian water as defined under the Water Act 2000, schedule 4
° overland flow water
° subartesian water
~ No Continue to question 1.4
°
0 ° Complele part 4 of this checklist
1.4 Is the operational work the construction of a dam, or carried out in relation to a dam, and, because of the
works, the dam must be failure impact assessed?
~ No Continue 10question 1.5
°
0 ° Complele part 5 of Ihis checklisl
1.5 Is any of the proposed operational work tidal works?
~ No • Conlinue to question 1.6
0 ° Complete part 6 of this checklist
1.6 Is any of the operational work proposed to be carried out completely or partly within a coastal
management district?
~ No Continue to question 1.7
°
0 ° Complete part 7 of this checklist
1.7 Is any of the proposed operational work for constructing or raising waterway barrier works as defined
under the Fisheries Act 1994?
~ No Continue 10question 1.8
°
0 ° Complete part 8 of this checklisl
1.8 Is any of the proposed operational work to be carried out completely or partly within a declared fish
habitat area as defined under the Fisheries Act 1994?
~ No • Continue to question 1.9
0 • Complele part 9 of this checklist
1.9 Is any ofthe proposed operational work removing, destroying or damaging marine plants as defined
under the Fisheries Act 1994?
~ No • Continue 10question 1.10
0 • Complete part 10 of this checklist
1.10 Does the proposal involve operational works that are high impact earthworks in the Great Barrier Reef
Wetland Protection Area?
~ No l'-o__ C_o_n_t_in_u_e_I_0_q_U_e_S_li_on_1_.1_1 _
Checklist 4-Qperational work
Version 4.1-1 October 2014
Page 16
[Q] I. Complete part 11 of this checklist
1.11 Does the proposal involve operational works that are the construction or modification of a levee?
[8J No • End of checklist
0 • Complete part 12 of this checklist
I Part 2-Clearing native vegetation
I 2.1 Do any of the following apply?
The clearing is on premises to which structure plan arrangements apply. 0 [8J No
The clearing is clearing, or for another activity or malter, mentioned in schedule 24, part 1 of 0 [8J No
the Sustainable Planning Regulation 2009.
The clearing is mentioned in schedule 24, part 2 of the Sustainable Planning Regulation 2009, 0 [8J No
as clearing for the particular land.
• If you answered yes to any of the above, this aspect of your operational work is not assessable development
• If you answered no to ALL of the above, continue to question 2.2
2.2 Is the proposed vegetation clearing for a relevant purpose under the Vegetation Management Act 1999,
section 22A for one or more of the following?
A project declared to be a coordinated project under the State Development and Public Works 0 Yes [8J No
Organisation Act 1971, section 26
Necessary to control non-native plants or declared pests 0 Yes [8J No
To ensure public safety 0 Yes [8J No
For relevant infrastructure and the clearing cannot reasonably be avoided or minimised 0 Yes [8J No
A natural and ordinary consequence of other assessable development for which a 0 Yes [8J No
development approval was given under the repealed Integrated Planning Act 1997, or a
development application was made under that Act, before 16 May 2003 and is outside an area
declared to be a declared area part 2, division 4, subdivision 2 of the Vegetation Management
Act 1999.
For fodder harvesting outside an area declared to be a declared area part 2, division 4, 0 Yes [8J No
subdivision 2 of the Vegetation Management Act 1999:
For thinning 0 Yes [8J No
For clearing of encroachment 0 Yes [8J No
For an extractive industry outside an area declared to be a declared area part 2, division 4, 0 Yes [8J No
subdivision 2 of the Vegetation Management Act 1999
For necessary environmental clearing 0 Yes [8J No
For high value agriculture clearing 0 Yes [8J No
For irrigated high value agriculture clearing 0 Yes [8J No
The Minister responsible for administering the Vegetation Management Act 1999 is satisfied 0 Yes [8J No
the development applied for is a for special indigenous purpose under the Cape York
Peninsula Heritage Act 2007 outside an area declared to be a declared area part 2, division 4,
subdivision 2 of the Vegetation Management Act 1999
Checklist 4-0perational work
Version 4.1-1 October 2014
Page 17
• If you answered no to ALL of the above, then the clearing is not for a relevant purpose and this aspect of the
development is prohibited development. If this is the only aspect of vegetation clearing then that is the end of part
2 of this checklist, otherwise continue to question 2.3
• If yes to any of the above, continue to question 2.3
2.3 Is the proposed vegetation clearing associated with a material change of use or reconfiguring a lot for
which referral is required in relation to clearing vegetation under schedule 7, table 3, item 10 and table 2,
item 4 of the Sustainable Planning Regulation 2009?
0 No • The proposed operational work for clearing native vegetation is assessable development and a
development permit is required
• This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence agency against the Queensland vegetation management state code in the State
Development Assessment Provisions (SDAP)
• You must complete IDAS Form 11-Clearing native vegetation
• End of part 2 of this checklist
0 Yes • This aspect of development is assessable development
• The chief executive of DSDIP may be a concurrence agency for the application (see schedule 7,
table 2, item 4 and table 3, item 10 of the Sustainable Planning Regulation 2009) and will assess the
application against the Queensland vegetation management state code in the SDAP
• If DSDIP is a concurrence agency for the application, you must refer a copy of your application to
DSDIP
• End of part 2 of this checklist
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 4 and schedule 7, table 3, item 10
• Vegetation Management Act 1999, section 22A
Part 3-0perational work for reconfiguring a lot
3.1 Is any part of the operational work for reconfiguring a lot in a priority development area?
~ No • Continue to question 3.2
0 Yes • This aspect of the development is not assessable development
• End of part 3 of this checklist
3.2 Do all of the following apply:
• the land is in the area of a local government that, under the South East Queensland Water
(Distribution and Retail Restructuring) Act 2009, is a participating local government for a
distributor-retailer
• the participating local government is the assessment manager
• the development application is made before 1 March 2014
[Z] No • This aspect of the development is assessable development and you will need a development permit
• The local government will be the assessment manager for the application
• End of part 3 of this checklist
Checklist 4-0perational work
Version 4.1-1 October 2014
Page 18
DYes • This aspect of the development is assessable development and you will need a development permit
• The local government will be the assessment manager for the application and the distributor-retailer
(or SARA) will be a concurrence agency for the application.
• End of part 3 of this checklist
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 47
I Part 4-Taking or interfering with water
4,1 Is the proposed operational work to be carried out in a priority development area or on premises to
which structure plan arrangements apply?
~ No • Continue to question 4.2
D Yes • This aspect of development is not assessable development and does not require a development
permit
• End of part 4 of this checklist
4,2 Does any of the proposed operational work involve taking or interfering with water from a watercourse,
lake or spring or from a dam constructed on a watercourse or lake?
~ No • End of part 4 of lhis checklist
D Yes • Continue to question 4.3
4,3 Are the proposed works for any of the following purposes?
Taking water from a watercourse, lake or spring in an emergency situation for a public D Yes ~ No
purpose or fighling a fire destroying, or threatening 10 destroy, a dwelling house
Taking waler from a watercourse, lake or spring if: D Yes ~ No
• the waler is laken by lhe owner of land adjoining lhe watercourse, lake or spring
• the waler is laken for domeslic purposes or stock purposes
Taking waler from a watercourse, lake or spring for camping purposes or for watering D Yes ~ No
travelling slock
Usin9 a water lruck 10 pump water D Yes ~ No
• If no to all of the above, conlinue to question 4.4
• If yes 10 any of the above, this aspect of development does not require a development permit.
If this is the only aspecl of taking or interfering with water proposed then lhal is the end of part 4 of this
checklist
If there are other aspects of taking or interfering with water proposed, continue to question 4.4
4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
Sustainable Planning Regulation 2009?
I~ No I. Go to question 4.5
Its ~~I~
Checklist 4-0perational work
Version 4.1-1 October 2014
Page 19
- -
[8] Yes • This aspect of development is self-assessable development and must comply with any relevant self.
assessable code
• If the proposal involves more than one aspect of operational work for taking or interfering with water,
and the other aspect is not self-assessable development, then continue to question 4.5
14,5 Is the work for a water pump?
[8] No • Continue to question 4.6
0 Yes • A development permit is required and this application will be assessed by the chief executive of
OSOIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SOAP
• You must complete IDAS form 13-Watercourse pump
• If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
• If there are other aspects of taking or interfering with water proposed, then continue to question 4.6
4.6 Is the work for water storage (other than for a dam requiring failure impact assessment)?
[8] No • Continue to question 4.7
0 Yes • A development permit is required and this application will be assessed by the chief executive of
OSOIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SOAP
• You must complete IDAS form 14-Water storage
• If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
• If there are other aspects of taking or interfering with water proposed, then continue to question 4.7
4.7 Is the work for gravity diversion from a watercourse?
[8] No • Continue to question 4.8
0 Yes • A development permit is required and this application will be assessed by the chief executive of
OSOIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SOAP
• You must complete IDAS form 15-Gravity diversion from a watercourse
• If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
• If there are other aspects of taking or interfering with water proposed, then continue to question 4.8
4.8 Is the work for a watercourse diversion?
[8J No • Continue to question 4.9
0 Yes • A development permit is required and this application will be assessed by the chief executive of
OSOIP as assessment manager or concurrence agency against the Sustainable management of
water resources state code in the SOAP
• You must complete IDAS form 17-Watercourse diversion
• If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
this checklist
• If there are other aspects of taking or interfering with water proposed, then continue to question 4.9
Page 20
4.9 Is the work for other work for taking or interfering with water?
[8] No • End of part 4 of this checklist
D Yes • A development permit is required and this application will be assessed by the chief executive of
DSDI P as assessment manager or concurrence against the Sustainable management of water
resources state code in the SDAP
• You must complete IDAS form 21-0ther work in a watercourse
• End of part 4 of this checklist
I Part 5-For particular dams
5.1 Is the proposed operational work for the following?
The construction of a dam more than 10 metres in height and having a storage capacity of D Yes [8] No
more than 1500 megalitres
The construction of a dam more than 10 metres in height and having a storage capacity of D Yes [8] No
more than 750 megalitres and a catchment area that is more than three times its maximum
surface area at full supply level
Work carried out in relation to an existing non-referable dam that will result in the dam being D Yes [8] No
more than 10 metres in height and having a storage capacity of more than 1500 megalitres
Work to an existing non-referable dam that will result in the dam being more than 10 metres in D Yes [8] No
height and having a storage capacity of more than 750 megalitres and a catchment area that
is more than three times its maximum surface area at full supply level
Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if DYes [8] No
the dam is:
• more than 10 metres in height and having a storage capacity of more than 1500
megalitres, or
• more than 10 metres in height and having a storage capacity of more than 750
megalitres and a catchment area that is more than three times its maximum surface area
at full supply level
Works carried out in relation to a referable dam if, because of the works, the storage capacity D Yes [8] No
of the dam will increase by more than 10% after the works are carried out.
Constructing a dam for which the chief executive under the Water Supply (Safety and D Yes [8] No
Reliability) Act 2008 has given a notice to have the dam failure impact assessed.
• If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
therefore not assessable development. This is the end of part 5 of this checklist
• If yes to any of the above, this application requires assessment by the chief executive of DSDIP as assessment
manager or concurrence agency against the Particular dams state code in the SDAP.
- You must complete IDAS form 16-Particulardams
- End of part 5 of this checklist
I Part 6- Tidal work NA
6.1 Is the proposed tidal work any of the following:
Excluded work D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Checklist 4-0perational work
Version 4.1-1 October 2014
Page 21
Work carried out on premises to which structure plan arrangements apply DYes D No
• If no to all of the above, continue to question 6.2.
• If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required.
6.2 Is any of the proposed tidal work prescribed tidal work? NA
D No • This application requires assessment by the chief executive of DSDIP as assessment manager or
concurrence against the Tidal works, or development in a coastal management district state code in
the SOAP
• You must complete IDAS form 23- Tidal works and development within coastal management districts
• End of part 6 of this checklist
D Yes • You must complete IDAS form 23- Tidal works and development within coastal management districts
• This application requires assessment by the local government as assessment manager and the chief
executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the
application to DSDIP
• End of part 6 of this checklist
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
I Part 7-Coastal management NA
7.1 Is the proposed operational work any olthe following:
Excluded works D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Work carried out on premises to which structure plan arrangements apply D Yes D No
• If no to all of the above, continue to question 7.2
• If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 7 of this checklist.
7.2 Is the proposed operational work for any olthe following? NA
Interfering with quarry material as defined under the Coastal Protection and Management Act D Yes D No
1995 on state coastal land above high-water mark
Disposing of dredge spoil or other solid waste material in tidal water D Yes D No
Constructing an artificial waterway D Yes D No
Removing or interfering with coastal dunes on land, other than State coastal land, that is in an D Yes D No
erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
high-water mark
Checklist 4-Operational work
Version 4.1-1 October 2014
Page 22
ft'
• If you answered no to all of the above, a development permit is not required for this aspect of development and
that is the end of part 7 of this checklist
• If you answered yes to any of the above,
This application may require assessment by the chief executive of OSOIP as assessment manager or
concurrence agency against the Tidal works, or development in a coastal management district state code in
the SOAP
You must complete IDAS form 23- Tidal works and development within coastal management districts
End of part 7 of this checklist
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18
I Part a-Waterway barrier works NA
8.1 Is the proposed operational work any of the following:
Work that is self-assessable
Planning Regulation 2009
development under schedule 3, part 2 of the Sustainable 0 Yes 0 No
Work carried out on premises to which structure plan arrangements apply 0 Yes 0 No
• If no to all of the above,
A development permit is required for this aspect of development. This application requires assessment by the
chief executive of OSOIP as assessment manager or concurrence agency against the Constructing or raising
waterway barrier works in fish habitats state code in the SOAP
You must complete IDAS form 27-Waterway barrier works
End of part 8 of this checklist
• If yes to any of the above, this aspect of development is not assessable development and a development permit is
not required. End of part 8 of this checklist.
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 6
• Sustainable Planning Regulation 2009, schedule 3, part 2
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 29
I Part 9-0eclared fish habitat area NA
9.1 Is the operational work reasonably necessary for any of the following?
The maintenance of existing structures, including for example the following structures, if the
structures were constructed in compliance with all the requirements under any Act relating to
DYes o No
a structure of that type:
• boat ramps, boardwalks, drains, fences, jellies, roads, safety signs, swimming
enclosures and weirs
• powerlines or associated powerline infrastructure .
Educational or research purposes relating to the declared fish habitat area 0 Yes 0 No
Monitoring the impact of development on the declared fish habitat area 0 Yes 0 No
Checklist 4-Operalional work
Version 4.1-1 October 2014
Page 23
ft'
The construction or placement of structures, including for example, safety signs, swimming DYes D No
enclosures and aids to navigation, if:
• the impact on the area is minor
• the structures are constructed in compliance with all the requirements, under any Act
relating to a structure of that type.
Public benefit works, including, for example, the construction of runnels for mosquito control, DYes D No
the removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is
minor
• If yes to any of the above, a permit is not required for this aspect of development but the proposed work must
comply with any applicable self-assessable codes. End of part 9 of this checklist.
• If no to all of the above:
A development permit is required and this application requires assessment by the chief executive of DSDIP
as assessment manager or concurrence agency, against the Developmenf in or adjacent to a declared fish
habitat area state code in the SDAP
You must complete IDAS form 27-Waterway barrier works
End of part 9 of this checklist
Section reference:
• Sustainabie Planning Regulation 2009, schedule 3, part 1, table 4, item 7
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 26
Part 1D--Removal, destruction or damage of a marine plant NA
10.1 Is the proposed operational work any ofthe following?
For reconfiguring a lot that is assessable development under table 3, item 1, if there is a D Yes D No
development permit in effect for the reconfiguration
For a material change of use that Is assessable development, if there is a deveiopment permit D Yes D No
in effect tor the change of use
Self-assessable development under schedule 3, part 2 of the Sustainable Planning Regulation D Yes D No
2009
Carried out in a priority development area D Yes D No
Carried out on premises to which structure plan arrangements apply D Yes D No
• If yes to any of the above, this aspect of development is not assessable development and no development permit
is required. End of part 10 of this checklist.
• If no to all of the above, continue to question 10.2
10.2 Is the proposed operational work any of the following? NA
Specified works in the area D Yes D No
Operational work that is a necessary and unavoidable part of installing or maintaining works or D Yes D No
infrastructure required to support other development for which a development permit or
compliance permit is not required or, if a development application or a request for compliance
assessment is required, the permit is held or has been applied for.
Checklist 4-0perational work
Version 4.1-1 October 2014
Page 24
• If no to all of the above, this aspect of development is prohibited development and a development application
cannot be made. End of part 10 of this checklist.
• If yes to any of the above:
A development permit is required and this application requires assessment by the chief executive of DSDIP
as assessment manager or concurrence agency against the Removal, destruction or damage of marine
plants state code in the SDAP
You must complete IDAS form 26-Marine plants and declared fish habitat areas
End of part 10 of this checklist.
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 3, part 2
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 30
Part 11-Great Barrier Reef Wetland Protection Areas NA
11,1 Is the proposed operational work for a domestic housing activity only?
0 No • Continue to question 11.2
0 Yes • A development permit is not required for this aspect of development and this is the end of the
checklist
11.2 Is the proposed operational work the natural and ordinary consequence of a material change of use or
reconfiguring a lot for which the state was a concurrence agency under schedule 7, table 3, item 21 A or
table 2, item 43A of the Sustainable Planning Regulation 2009?
0 No • Continue to question 11.3
0 Yes • A development permit is not required for this aspect of development and this is the end of the
checklist
11.3 Is the proposed operational work associated with government supported transport infrastructure or
electricity infrastructure?
0 No • A development permit is required and this application requires assessment by the chief executive of
DSDIP as assessment manager or concurrence agency against the Wetland protection area state
code in the SDAP.
• You must complete IDAS form 33-Great Barrier Reef Wetland protection area
• End of part 11 of this checklist
0 Yes • A permit is not required for this aspect of development but the proposed work must comply with any
applicable self assessable code
• End of part 11 of this checklist
Part 12-Construction or modification of a levee
12.1 Will the proposed operational work result in any of the following off-property impacts:
A change to the flow path of overland flow water where it enters or exits the property 0 Yes ~ No
An increase in the velocity of flood flow beyond the boundaries of the property 0 Yes ~ No
An increase in flooded area beyond the boundaries of the property 0 Yes ~ No
An increase in flood height beyond the boundaries of the property 0 Yes ~ No
Checklist 4-Operational work
Version 4.1-1 October 2014
Page 25
• If no to all of the above this development is categorised as a Category 1 levee and must comply
with any applicable self-assessable code - end of this checklist
• If yes to any of the above continue to question 13.2
12.2 Will the proposed operational work result in any of the following impacts:
An increase in flood height above the floorboards in an occupied building that results in 3 or
more people being affected
0 Yes ~ No
An increase in flood velocity above the floorboards in an occupied building that results in 3 or
more people being affected
0 Yes ~ No
• If no to all of the above:
- This is categorised as a Category 2 levee and is subject to code assessment
- A development permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee
- You must complete IDAS form 2D-lnterfering with overland flow water and construction or
modification of a levee.
- End of this checklist.
• If yes to any of the above:
- This is categorised as a Category 3 levee and is subject to impact assessment
- A development permit is required and this application requires assessment by the local
government as assessment manager against the applicable code for the construction or
modification of a levee
- This application will require assessment by the chief executive of DSDI P as concurrence agency
against the Construction or modification of levees state code in the SOAP
You must complete IDAS form 2D-lnterfering with overland flow water and construction or
modification of a levee.
End of this checklist.
Section references:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 11
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 48.
Privacy-please refer to your assessment manager for further details on the use of information recorded in
this form
Disclaimer:
While the Department of State Development, Infrastructure and Planning (DSDIP) believes that the information
contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis
that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation
and application of the applicable legislation to your circumstances.
To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this checklist.
OFFICE USE ONLY
Checklist 4-Operational work
Version 4.1-1 October 2014
Page 26
Date received 1 1 Reference numbers
The Sustainable Planning Act 2009 is administered by DSDlP. This checklist and all other required application
materials should be sent to your assessment manager and any reterral agency.
Department of State Development. Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (13 74 68)
[email protected] Checklist 4-0perational work
Version 4.1-1 October 2014
www.dsdip.qld.gov.au
Used in these records
OPW15/0056 - IDAS Forms Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.