                                                                        Department    of State Development,     Infrastructure   and Planning     _




  IDAS form 1-Application details
  (Sustainable   Planning Act 2009 version 4.1 effective 4 July 2014)


  This form must be used for ALL development applications.


  You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
  form.

  For all development applications, you must:
  •        complete this form (IDAS form 1-Application              details)
  •        complete any other forms relevant to your application
  •        provide any mandatory supporting information identified on the forms as being required to accompa~y your
           application.
  Attach extra pages if there is insufficient space on this form.

  All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
  Planning Regulation 2009.

  This form and any other IDAS form relevant to your application must be used for development applications reiating to
  strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
  Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
  use plan for the strategic port land, Brisbane core port land or airport land.

  PLEASE NOTE: This form is not required to accompany requests for compliance assessment.

  This form can also be completed               online using MyDAS at www.dsdip.gld.gov.au/MyDAS


I Mandatory requirements
  Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
  of the land. The applicant is responsible for ensuring the information provided on alilDAS application forms is correct.
  Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
  to the applicant.)

  Namels (individual or company name in full)                     I Edward P Cheetham
  For companies, contact name

                                                                    803 Cooroy-Noosa       Road

      DeVe/Opm<:lnt
               •• C' Ounter
                       . -
      ,.
                                                                    Suburb           Coo roy
                    1 4 APR 2015
  ,
  "                                                                 State            OLD                        I Postcode       14563

                 Tewantin                                           Country          AUS

  Contact phone number                                            I 07 5442 6506
  Mobile number (non-mandatory              requirement)          I 0438541711
  Fax number (non-mandatory             requirement)




                                                                                                      , It ••


Great state. Great opportunity.
                                                                                                                                     Queensland
                                                                                                                                     Government   _
Full text of the other 25 pages

Page 2

Email address (non-mandatory      requirement)        I [email protected]

Applicant's reference number (non-mandatory
requirement)

1.       What is the nature of the development      proposed      and what type of approval   is being sought?

Table A-Aspect      1 of the application (If there are additional aspects to the application please list in Table B-Aspect   2.)

a)   What is the nature of the development?      (Please only tick one box.)

     D Material change of use         D Reconfiguring a lot             D Building work            !8lOperational work
b)   What is the approval type? (Please only tick one box.)

     D Preliminary approval           D Preliminary approval            D Development permit
            under s241 of SPA               under s241 and s242
                                            of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

     Filling to the extent specified to allow future development of a residence and an adjacent machinery shed on a
            13ha property currently used for cattle grazing. All future work will be subject to Engineering design and
            Development Approval. The approval is sought now to bring fill on site that is currently available that will
            make future proposed use possible. The overall plan is to build a lifestyle property to incorporate existing
            wildlife and establish an environment for local Koalas with a specific tree planting. The enclosed Letter of
            Intent details current operational work proposed.



d)   What is the level of assessment?     (Please only tick one box.)

     ~     Impact assessment          ~     Code assessment


Table B-Aspect    2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)

a)   What is the nature of development? (Please only tick one box.)

     D Material change of use         D Reconfiguring a lot             D Building work            D Operational work
b)   What is the approval type? (Please only tick one box.)

     D Preliminary approval           D Preliminary approval            D Development
            under s241 of SPA               under s241 and s242              permit
                                            of SPA
c)   Provide a brief description of the proposal, including use definition and number of buildings or structures where
     applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)




d)   What is the level of assessment?

     D Impact assessment              D Code assessment


                                                                                                 IDAS form 1-Application details
                                                                                                        Version 4.1-4 July 2014

Page 3

Table C-Additional   aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)

     o Refer attached schedule       ~    Not required




                                                                                                IDAS form 1-Application details
                                                                                                       Version 4.1-4 July 2014

Page 4

 2.         Location     of the premises    (Complete Table D and/or Table E as applicable.              Identify each lot in a separate row.)

 Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
 adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
 (Attach a separate schedule if there is insufficient space in this table.)

        0      Street address and lot on plan (All lots must be listed.)

        0      Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
               development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)

 Street address                                                                   Lot on plan                    Local government       area
          B<:::>'3 <-eu- f'-cY-             1'\0<><;''''-    F«>N7                description                    (e.g. Logan, Cairns)

 Lot         Unit        Street    Street name and official            Post-      Lot no.       Plan type
             no.         no.       suburb/locality name                code                     and plan no.

 i)         ldt''7                 ~1f)t4A-          lMlt-                          1"'7        a" J              NO<> <;A-
 ii)                      €.03     Ceo t4f'7 - ~,oo ~            P.,) 4~'~                      v.evc;e,s'l
 iii)                                                                                           ~8'88'&"
 Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
 separate row in the below table. Non-mandatory)
 Lot         Applicable zone / precinct                     Applicable local plan / precinct             Applicable overlay/s

 i)

 ii)

 iii)

 Table E-Premises      coordinates (Appropriate for development in remote areas, over part of a lot or in water not
 adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
 space in this table.)

 Coordinates                                                                        Zone            Datum              Local government
 (Note: place each set of coordinates in a separate row)                            reference                          area (if applicable)

 Easting               Northing           Latitude              Longitude

                                                                                                       0 GDA94
                                                                                                       0 WGS84
                                                                                                       0 other
 3. Total area of the premises         on which the development                is proposed     (indicate square metres)

113051 square meters

 4. Current      use/s of the premises        (e.g. vacant land, house, apartment building, cane farm etc.)


I Cattle grazing to vacant land




                                                                                                                 IDAS fOIm I-Application details
                                                                                                                        Version 4.1-4 July 2014

Page 5

1-'--
  5.     Are there any current approvals            (e.g. a preliminary    approval)   associated   with this application?   (Non-
         mandatory requirement)

  ~      No         o Yes-provide details below
  List of approval reference/s                             Date approved (dd/mm/yy)                  Date approval lapses (dd/mm/yy)



  6.     Is owner's     consent   required    for this application?       (Refer to notes at the end of this form for more information.)


  ~      No

  o      Yes-complete      either Table F, Table G or Table H as applicable


  Table F

  Name of ownerls of the land

  INJe, the above-mentioned       ownerls of the land, consent to the making of this application.

  Signature of ownerls of the land


  Date

  Table G

  Name of ownerls of the land                 I
  o The owner's written consent is attached or will be provided separately to the assessment manager.
  Table H

  Name of ownerls of the land                 I
  o By making this application, I, the applican~ declare that the owner has given written oonsentto the making of the application.
  7.     Identify   if any of the following       apply to the premises      (Tick applicable box/es.)

         Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete              Table I
  ~
  o On strategic port land under the Transport Infrastructure Act 1994-complete Table J
  o In a tidal water area-complete Table K
  o On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
  o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
  o      Listed on either the Contaminated Land Register (CLR) or the Environmental
         the Environmental Protection Act 1994 (no table requires completion)
                                                                                                    Management Register (EMR) under



  Table I

  Name of water body, watercourse or aquifer

  Six Mile Creek, within the Noosa Water Catchment Areas




                                                                                                           IDAS fonn I-Application details
                                                                                                                  Version 4.1-4 July 2014

Page 6

Table J

Lot on plan description for strategic port land                         Port authority for the lot




Table K

Name of local government for the tidal area (if applicable)             Port authority for the tidal area (if applicable)




8.    Are there any existing       easements    on the premises?    (e.g. for vehicular access, electricity, overland flow,
      water etc)

D     No      ~       Yes-ensure   the type, location and dimension of each easement is included in the plans submitted


9.    Does the proposal       include    new building   work or operational   work on the premises?        (Including any
      services)

D     No      ~       Yes-ensure   the nature, location and dimension of proposed works are included in plans submitted


10.   Is the payment of a portable long service          leave levy applicable     to this application?   (Refer to notes at the
      end of this form for more information.)

~     No-go       to question 12        DYes

11.   Has the portable      long service    leave levy been paid? (Refer to notes at the end of this fonm for more
      information.)

D No
D Yes-complete   Table L and submit with this application the yellow local government/private certifier's copy of the
  receipted QLeave form

Table L

Amount paid                                                          Date paid          QLeave project number (6 digit number
                                                                     (dd/mm/yy)         starting with A, S, E, L or P)




12.   Has the local government agreed to apply a superseded              planning     scheme to this application     under
      section 96 of the Sustainable Planning Act 2009?

~     No

D     Yes-please       provide details below


Name of local government                            Date of written notice given      Reference number of written notice given
                                                    by local government               by local government (if applicable)
                                                    (dd/mm/yy)




                                                                                                      IDAS form 1-Application details
                                                                                                             Version 4.1-4 July 2014

Page 7

    13.     List below all of the forms and supporting information that accompany this application (Include alilDAS
            forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
            this question does not apply for applications made online using MyDAS)

    Description     of attachment   or title of attachment                                             Method of lodgement to
                                                                                                       assessment manager

    IDAS form 1                                                                                        In person

    IDAS form 6                                                                                        In person

    Schedule 3 Check list 4 Assessable Development (Operational Work)                                  In person

    Site Plan 1 :2000 A3 size (6 copies)                                                               In person

    Noosa Plan Biodiversity Overlay A4 and Survey Map                                                  In person

114.        Applicant's   declaration


    ~ By making this application, I declare that all information in this application is true and correct (Note: it is unlawful to
    provide false or misleading information)

Notes for completing         this form

•     Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly.m2':'", 2;:,::,1;~:,,~;,:,~.
      Note, the assessment manager has discretion to accept an application as properly made despite any non.
      compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
      Sustainable Planning Act 2009

Applicant details
• Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.

Question        1
          : .::. ~.:: : .: ::-.: :::::"::':':~,':~:GPlanning Regulation 2009 identifies assessable development and the type of
          2~~",~~~en!.  Where schedule 3 identifies assessable development as "various aspects of development" the
          applicant must identify each aspect of the development on Tables A, Band C respectively and as required.

Question 6
• Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required Iv;
  an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
        , .. : _ :..        •. :':.: :::. ::'.:.~ .:~ .'~~:::::tion must contain, or be accompanied by, the written consent of the
  -:,..•noe', 0), il',,~lu,i~ '3 ri~c;laration by the applicant that the owner has given written consent to the making of the
  application. If a development application relates to a state resource, the application is not required to be supported
  t')' ~'.'!~c:!'!':~                                    =
                       C'f~!"!=!!0,==t!0~ 0!"2!'!t!t!eme!'!t to st3te resource. HC'Never, where the state is the owner of the
  subject land, the written consent of the state, as landowner, may be re4u~i"e~.                 ';i:v"'Q~;Vll VI ~II~;~:""'"~"~
                                                                                                                             ~v ~i,,,,~~c.I~C
  resource is a separate process and will need to be obtained before development commences.

Question 7
•   If the premises is listed on either the Contaminated Land Register (CLR) or the Environmental
    Management Register (EMR) under the Environmental Protection Act 1994 it may be necessary to
          seek compliance assessment. Schedule 18 of the Sustainable rlarlll;'-I~~c~u;a;';uil
                                                                                           LVUO;wclli;;-;c;:)
          where compliance assessment is required.

Question 11
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
  service leave levy is payable.
• Th~ r0ri"bl~ long s~rvice leave levy amount and other prescrib~d percentages and rates for calculating the levy
  are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.




                                                                                                             tDAS form I-Application details
                                                                                                                    Version 4.1-4 July 2014

Page 8

   Question 12
   • The portable long service leave levy need not be paid when the application is made, but the Building and
      Construction tndustry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
     permit is issued.
   • Building and construction industry notification and payment forms are available from any Queensland post office or
     agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au.        For
     further information contact QLeave on 1800803481 or visit www.qleave.qld.gov.au.


   Privacy-The    information collected in this form will be used by the Department of State Development, Infrastructure
   and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
   processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
   the IDAS process or the provisions about public access to planning and development information in the Sustainable
   Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
   Parliament. This information may be stored in relevant databases. The information collected will be retained as
   required by the Public Records Act 2002.



   OFFICE USE ONLY

     Date received       ~                                      ~I      Reference numbers

   NOTIFICATION         OF ENGAGEMENT            OF A PRIVATE CERTIFIER

    To                                                                  Council. I have been engaged as the private certifier for the

             ----------------                                       I   building work referred to in this application

                                                                                      BSA Certification license          Building
     Date of engagement            Name
                                                                                      number                             classification/s




   QLEAVE NOTIFICATION             AND PAYMENT (For completion                 by assessment     manager or private certifier     if
   applicable.)

                                                                                                       Date receipted
                                                                                                                           Name of officer
                                          QLeave project            Amount paid                        form sighted by
     Description of the work                                                              Date paid                        who sighted the
                                          number                    ($)                                assessment
                                                                                                                           form
                                                                                                       manaoer




   The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
   Planning. This form and all other required application materials should be sent to your assessment manager and any
   referral agency.




Department of State Development,    Infrastructure   and Planning
PO Box 15009 City East Old 4002
10113 oGOV (13 74 68)
[email protected]                                                                                          IDAS form 1-Application delails
                                                                                                                      Version 4.1-4 July 2014
www.dsdip.qld.gov.au

Page 9

                                                                         Department   of State Development,            Infrastructure       and Planning




  IDAS form 6-Building     or operational work assessable
  against a planning scheme
  (Sustainable    Planning Act 2009 version 3.0 effective 1 July 2013)


  This form must be used for development applications for building work or operational work assessable against a
  planning scheme.

  You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
  form.

  For all development applications, you must:
  •         complete IDAS form 1-Application            details
  •         complete any other forms relevant to your application
  •         provide any mandatory supporting information identified on the forms as being required to accompany your
            application.
  Attach extra pages if there is insufficient space on this form.

  All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
  Planning Regulation 2009.

  This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
  under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
  2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
  take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.

  This form can also be completed                online using MyDAS at www.dsdip.gld.gov.auIMyDAS


I Mandatory requirements
  1.         What is the nature of the work that requires                assessment    against   a planning           scheme?   (Tick all applicable
             boxes.)


          D        Building work-complete         Table A                [8J Operational work-complete                Table B


  Table A
  a)        What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
            building)?



      I                                                                                                                                                      I
  b)        Are there any current approvals associated with this application? (e.g. material change of use.)

           D       No         D       Yes-    provide details below


          List of approval referencels                             Date approved (ddlmmlyy)               Date approval lapses (dd/mm/yy)




                                                                    Development Gounter
                                                                          ,




Great state. Great opportunity.
--                   --,                             --
                                                                   I'. ,


                                                                              ---,
                                                                                  1 4 APR 2015

                                                                                Tewantin
                                                                                                   '.
                                                                                                            .:th'..
                                                                                                          :,~r;;
                                                                                                        'I /f:
                                                                                                                 I


                                                                                                                 I




                                                                                                                        ,__             _
                                                                                                                                               e-
                                                                                                                                                Queensland
                                                                                                                                                Government

Page 10

 Table B
 a)    What is the nature of the operational work? (Tick all applicable boxes.)
       o Road works            0 Stormwater 0 Water infrastructure
       o Drainage works        ~ Earthworks 0 Sewerage infrastructure
       o Landscaping           0 Signage    0 Clearing vegetation under the planning scheme
       o Other-provide details
 b)    Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
                                                                               ----------------
      ~      No    0 Yes-specify the number of lots being created          1                                                 _



 c)    Are there any current approvals associated with this application? (E.g. material change of use.)
      ~      No    0 Yes-provide details below
      List of approval reference/s                   Date approved (dd/mm/yy)              Date approval lapses (dd/mm/yy)




 2.       What is the dollar value of the proposed building work?                                        $0
          (Inc GST, materials and labour.)

 3.       What is the dollar value of the proposed operational work?                                     $ 5,000
          (Inc GST, materials and labour.)

I Mandatory supporting information
 4.       Confirm that the following mandatory supporting information accompanies this application

 Mandatory supporting information                                                      Confirmation of        Method of
                                                                                       lodgement              lodgement

 All applications involving building work or operational work
 A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are                  ~     Confirmed
 recommended scales) which shows the following:
 • the location and site area of the land to which the application relates
      (relevant land)
 • the north point
 • the boundaries of the relevant land
 • the allotment layout showing existing lots, any proposed lots (including the
      dimensions of those lots), existing or proposed road reserves, building
      envelopes and existing or proposed open space (note: numbering is
      required for all lots)
 •    any existing or proposed easements on the relevant land and their
      function
 •    any access limitation strips
 •    all existing and proposed roads and access points on the relevant land.


                                                                               IDAS form 6-Building or operational work assessable
                                                                                                        against a planning scheme
                                                                                                          Version 3.0-1 July 2013

Page 11

A statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant
                                                                                         o Confirmed
to the application.

A statement addressing the relevant part(s) of the State Development                     D Confirmed
Assessment Provisions (SOAP).                                                            o Not applicable
Applications   for building   work (including   extensions     and demolition      that is assessable   development)

Floor plans drawn to an appropriate scale (1:50,1:100        or 1:200 are                D Confirmed
recommended scales) which show the following:                                            o Not applicable
•   the north point
•   the intended use of each area on the floor plan (for commercial, industrial
    or mixed use developments only)
•   the room layout (for residential development only) with all rooms clearly
    labelled
•   the existing and the proposed built form (for extensions only)
•   the gross floor area of each proposed floor area .

Elevations drawn to an appropriate scale (1:100,1:200 or 1:500 are                       D Confirmed
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation).
                                                                                          o Not applicable
Plans showing the size, location, proposed site cover, proposed maximum                   D Confirmed
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.
                                                                                          o Not applicable
Plans showing the extent of any demolition that is assessable development.                D Confirmed
                                                                                          o Not applicable
Applications   for operational   work involving   earthworks      (filling   and excavating)

Drawings showing:                                                                         o Confirmed
•   existing and proposed contours                                                        D Not applicable
•   areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works
•   the location of any proposed retaining walls on the relevant land and their
    height
•   the defined flood level (if applicable)
•   the fill level (if applicable) .
Applications   for operational   work involving    roadworks

Drawings showing:                                                                         D Confirmed
• existing and proposed contours                                                          o Not applicable
• the centreline or construction line showing chainages, bearings, offsets if
    the construction line is not the centreline of the road and all intersection
    points
•   information for each curve including tangent point chainages and offsets,
    curve radii, arc length, tangent length, superelevation (if applicable) and
    curve widening (if applicable)
•   kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
•   edge of pavement where kerb is not constructed
•   position and extent of channelisation
•   location and details of all traffic signs, guideposts, guardrail and other
    street furniture
•   pavement markinQs includino details on raised pavement markers

                                                                                 IDAS form 6-Building or operational work assessable
                                                                                                          against a planning scheme
                                                                                                            Version 3.0-1 July 2013

Page 12

• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
•   changes in surfacing material.

Applications   for operational   work involving   stormwater     drainage

Drawings showing:                                                                     D Confirmed
•   existing and proposed contours                                                    ~   Not applicable
•   drainage locations, diameters and class of pipe, open drains and
    easements
•   manhole location, chainage and offset or coordinates and inlet and outlet
    invert levels
•   inlet pit locations, chainage and offset or coordinates and invert and kerb
    levels.

Applications   for operational   work involving   water reticulation

Drawings showing:                                                                     D Confirmed
•   kerb lines or edge of pavement where kerb is not constructed                      ~   Not applicable
•   location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
•   location of house connections (if applicable)
•   location of bench marks and reference pegs .
Applications   for operational   work involving   sewerage     reticulation

Drawings showing:                                                                     D Confirmed
• location of all existing and proposed services                                      ~   Not applicable
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable) .
Applications   for operational   work involving   street lighting

Drawings showing:                                                                     D Confirmed
• location of all light poles and service conduits                                    ~   Not applicable
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of anv variations to normal alianment
                                                                              IDAS form 6-Building or operational work assessable
                                                                                                       against a planning scheme
                                                                                                         Version 3.0-1 July 2013

Page 13

    • details of lighting levels .                                                                                       I
    Applications        for operational   work involving        public utility services

    Drawings showing:                                                                              o Confirmed
    • any existing light poles and power poles                                                     [2J Not applicable
    • any existing underground services
    • details of proposed services
    • alteration to existing services .
    Applications        for operational    work involving       landscaping   works

    Drawings showing:                                                                              o Confirmed
    • the location of proposed plant species                                                       [2J Not applicable
    • a plant schedule indicating common and botanical names, pot sizes and
        numbers of plants
    •   planting bed preparation details including topsoil depth, subgrade
        preparation, mulch type and depth, type of turf, pebble, paving and garden
        edge
    •   the location and type of any existing trees to be retained
    •   construction details of planter boxes, retaining walls and fences
    •   the proposed maintenance period
    •   irrigation system details .

   Privacy-Please     refer to your assessment manager, referral agency andlor building certifier for further details on the
   use of information recorded in this form.



   OFFICE USE ONLY

     Date received          ___________
                                   ~I                                 Reference numbers



   The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
   Planning. This form and all other required application materials should be sent to your assessment manager and any
   referral agency.




Department of State Development,     Infrastructure   and Planning
PO Box 1S009 City East Old 4002
tol13 OGOV (13 74 68)                                                                     IDAS fonn f>-Building   or operational worl< assessable
[email protected]                                                                                                 against a ptanning scheme
                                                                                                                        Version 3.0-1 July 2013
www.dsdip.qld.gov.au

Page 14

                                                                     Department of State Development. Infrastructure and Planning



  Schedule 3 Assessable Development
  Checklist 4-0perational work
  (Sustainable   Planning Act 2009 version 4.1 effective 1 October 2014)


  This checklist only applies when the development application seeks approval for operational work. Before completing
  this checklist, please complete Checklist 1-Various aspects of development.

  You may complete this checklist as part of your development application. The checklist will:
  •     help you identify whether you need to make a development application for the proposed development
  •     help you identify the relevant Integrated Development Assessment System (IDAS) form you need to complete as
        part of your application
  •     assist in identifying the assessment manager or referral agency for development that is assessable development
        under schedule 3 of the Sustainable Planning Regulation 2009.

  If your development involves reconfiguring a lot, buiiding work or material change of use, it is recommended you
  complete Checklist 2-Material change of use, Checklist 3-Reconfiguring       a lot, or checklist 5-Buifding work, where
  relevan!.
  If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of State
  Development, Infrastructure and Planning's website at www.dsdip.gld.gov.au.

  All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
  Planning Regulation 2009.

I Part 1-General questions
  1.1      Is the operational work clearing native vegetation on:
           •     freehold land
           •     indigenous land
           •     any of the following under the Land Act 1994:
                     land subject to a lease
                     a road
                     trust land, other than indigenous land
                     land subject to a licence or permit?

  ~     No          •     Continue to question 1.2

  D                 •     Complete part 2 of this checklist

  1.2      Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration                is
           also assessable development?

  ~      No         •     Continue to question 1.3

  D                 •     Complete part 3 of this checklist



                                                                             Development :;ounter
                                                                                         1 4 APR 2015
                                                                                       Tewantin

Great state. Great opportunity.
                                                                                                                        Queensland
                                                                                                                        Gov~fIlment

Page 15

    1.3     Does any of the proposed       operational   work involve taking or interfering   with:
            °   water from a watercourse,        lake or spring, or from a dam constructed     on a watercourse     or lake
            °   artesian water as defined under the Water Act 2000, schedule 4
            °   overland flow water
            °   subartesian     water


    ~      No             Continue to question 1.4
                   °
    0              °      Complele part 4 of this checklist

    1.4     Is the operational work the construction of a dam, or carried out in relation to a dam, and, because of the
            works, the dam must be failure impact assessed?


    ~      No             Continue 10question 1.5
                   °
    0              °      Complele part 5 of Ihis checklisl


    1.5     Is any of the proposed operational       work tidal works?


    ~      No      •      Conlinue to question 1.6

    0              °      Complete part 6 of this checklist

    1.6     Is any of the operational     work proposed to be carried out completely      or partly within a coastal
            management district?


    ~      No             Continue to question 1.7
                   °
    0              °      Complete part 7 of this checklist

    1.7     Is any of the proposed operational       work for constructing   or raising waterway barrier works as defined
            under the Fisheries Act 1994?


    ~      No             Continue 10question 1.8
                   °
    0              °      Complete part 8 of this checklisl

    1.8    Is any of the proposed operational work to be carried out completely           or partly within a declared fish
    habitat area as defined under the Fisheries Act 1994?


    ~      No      •      Continue to question 1.9

    0              •      Complele part 9 of this checklist

    1.9     Is any ofthe proposed operational        work removing,   destroying   or damaging    marine plants as defined
            under the Fisheries Act 1994?


    ~      No      •      Continue 10question 1.10

    0              •      Complete part 10 of this checklist


    1.10    Does the proposal involve operational        works that are high impact earthworks        in the Great Barrier Reef
            Wetland Protection Area?


~          No    l'-o__   C_o_n_t_in_u_e_I_0_q_U_e_S_li_on_1_.1_1                                                                 _


                                                                                                         Checklist 4-Qperational work
                                                                                                          Version 4.1-1 October 2014

Page 16

[Q]             I.   Complete part 11 of this checklist

 1.11    Does the proposal    involve   operational   works that are the construction   or modification    of a levee?


 [8J No         •    End of checklist

 0              •    Complete part 12 of this checklist


I Part 2-Clearing native vegetation
I 2.1 Do any of the following apply?
 The clearing is on premises to which structure plan arrangements       apply.                            0         [8J No
 The clearing is clearing, or for another activity or malter, mentioned in schedule 24, part 1 of         0          [8J No
 the Sustainable Planning Regulation 2009.
 The clearing is mentioned in schedule 24, part 2 of the Sustainable Planning Regulation 2009,            0          [8J No
 as clearing for the particular land.

 •      If you answered yes to any of the above, this aspect of your operational work is not assessable development
 •      If you answered no to ALL of the above, continue to question 2.2

 2.2     Is the proposed vegetation clearing for a relevant       purpose   under the Vegetation Management Act 1999,
         section 22A for one or more of the following?

 A project declared to be a coordinated project under the State Development       and Public Works        0 Yes     [8J No
 Organisation Act 1971, section 26

 Necessary to control non-native plants or declared pests                                                 0 Yes      [8J No
 To ensure public safety                                                                                  0 Yes      [8J No
 For relevant infrastructure and the clearing cannot reasonably be avoided or minimised                   0 Yes      [8J No
 A natural and ordinary consequence of other assessable development for which a                           0 Yes      [8J No
 development approval was given under the repealed Integrated Planning Act 1997, or a
 development application was made under that Act, before 16 May 2003 and is outside an area
 declared to be a declared area part 2, division 4, subdivision 2 of the Vegetation Management
 Act 1999.
 For fodder harvesting outside an area declared to be a declared area part 2, division 4,                 0 Yes      [8J No
 subdivision 2 of the Vegetation Management Act 1999:

 For thinning                                                                                             0 Yes      [8J No
 For clearing of encroachment                                                                             0 Yes      [8J No
 For an extractive industry outside an area declared to be a declared area part 2, division 4,            0 Yes      [8J No
 subdivision 2 of the Vegetation Management Act 1999

 For necessary environmental     clearing                                                                 0 Yes      [8J No
 For high value agriculture clearing                                                                      0 Yes      [8J No
 For irrigated high value agriculture clearing                                                            0 Yes      [8J No
 The Minister responsible for administering the Vegetation Management Act 1999 is satisfied               0 Yes      [8J No
 the development applied for is a for special indigenous purpose under the Cape York
 Peninsula Heritage Act 2007 outside an area declared to be a declared area part 2, division 4,
 subdivision 2 of the Vegetation Management Act 1999


                                                                                                     Checklist 4-0perational work
                                                                                                      Version 4.1-1 October 2014

Page 17

•     If you answered no to ALL of the above, then the clearing is not for a relevant purpose and this aspect of the
      development is prohibited development. If this is the only aspect of vegetation clearing then that is the end of part
      2 of this checklist, otherwise continue to question 2.3
•     If yes to any of the above, continue to question 2.3

2.3    Is the proposed vegetation clearing associated with a material change of use or reconfiguring     a lot for
       which referral is required in relation to clearing vegetation under schedule 7, table 3, item 10 and table 2,
       item 4 of the Sustainable Planning Regulation 2009?


0 No          •      The proposed operational work for clearing native vegetation is assessable development and a
                     development permit is required
              •      This application requires assessment by the chief executive of DSDIP as assessment manager or
                     concurrence agency against the Queensland vegetation management state code in the State
                     Development Assessment Provisions (SDAP)
              •      You must complete IDAS Form 11-Clearing            native vegetation
              •      End of part 2 of this checklist

0 Yes         •      This aspect of development        is assessable development
              •      The chief executive of DSDIP may be a concurrence agency for the application (see schedule 7,
                     table 2, item 4 and table 3, item 10 of the Sustainable Planning Regulation 2009) and will assess the
                     application against the Queensland vegetation management state code in the SDAP

              •      If DSDIP is a concurrence agency for the application, you must refer a copy of your application to
                     DSDIP
              •      End of part 2 of this checklist

Section reference:
•     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 1
•     Sustainable Planning Regulation 2009, schedule 7, table 2, item 4 and schedule 7, table 3, item 10
•     Vegetation Management Act 1999, section 22A

Part 3-0perational       work for reconfiguring        a lot

3.1    Is any part of the operational       work for reconfiguring     a lot in a priority   development     area?


~     No      •      Continue to question 3.2

0 Yes         •      This aspect of the development        is not assessable development

              •      End of part 3 of this checklist

3.2    Do all of the following     apply:
       •    the land is in the area of a local government that, under the South East Queensland                      Water
            (Distribution     and Retail Restructuring) Act 2009, is a participating local government                for a
            distributor-retailer
       •    the participating    local government        is the assessment    manager
       •    the development       application   is made before 1 March 2014


[Z] No        •      This aspect of the development        is assessable development and you will need a development         permit
              •      The local government will be the assessment manager for the application
              •      End of part 3 of this checklist




                                                                                                           Checklist 4-0perational work
                                                                                                            Version 4.1-1 October 2014

Page 18

 DYes          •    This aspect of the development is assessable development and you will need a development permit
               •    The local government will be the assessment manager for the application and the distributor-retailer
                    (or SARA) will be a concurrence agency for the application.
               •    End of part 3 of this checklist

 Section reference:
 •    Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
 •     Sustainable Planning Regulation 2009, schedule 7, table 2, item 47

I Part 4-Taking or interfering with water
 4,1    Is the proposed operational work to be carried out in a priority development area or on premises to
        which structure plan arrangements apply?

 ~     No      •    Continue to question 4.2

 D     Yes     •    This aspect of development is not assessable development and does not require a development
                    permit
               •    End of part 4 of this checklist

 4,2    Does any of the proposed operational work involve taking or interfering with water from a watercourse,
        lake or spring or from a dam constructed on a watercourse or lake?

 ~     No      •    End of part 4 of lhis checklist

 D     Yes     •    Continue to question 4.3

 4,3    Are the proposed works for any of the following purposes?

 Taking water from a watercourse, lake or spring in an emergency situation for a public                   D   Yes      ~    No
 purpose or fighling a fire destroying, or threatening 10 destroy, a dwelling house
 Taking waler from a watercourse, lake or spring if:                                                      D   Yes      ~    No
 •     the waler is laken by lhe owner of land adjoining lhe watercourse, lake or spring
 •     the waler is laken for domeslic purposes or stock purposes
 Taking waler from a watercourse, lake or spring for camping purposes or for watering                     D   Yes      ~ No
 travelling slock
 Usin9 a water lruck 10 pump water                                                                        D   Yes      ~    No

 •     If no to all of the above, conlinue to question 4.4
 •     If yes 10 any of the above, this aspect of development does not require a development permit.
           If this is the only aspecl of taking or interfering with water proposed then lhal is the end of part 4 of this
              checklist
           If there are other aspects of taking or interfering with water proposed, continue to question 4.4

 4.4    Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
        Sustainable Planning Regulation 2009?

I~     No     I.    Go to question 4.5

              Its   ~~I~




                                                                                                      Checklist 4-0perational work
                                                                                                       Version 4.1-1 October 2014

Page 19

 -                 -

 [8] Yes      •    This aspect of development is self-assessable     development and must comply with any relevant self.
                   assessable code
              •    If the proposal involves more than one aspect of operational work for taking or interfering with water,
                   and the other aspect is not self-assessable development, then continue to question 4.5

14,5      Is the work for a water pump?


 [8] No       •    Continue to question 4.6

 0 Yes        •    A development permit is required and this application will be assessed by the chief executive of
                   OSOIP as assessment manager or concurrence agency against the Sustainable management of
                   water resources state code in the SOAP
              •    You must complete IDAS form 13-Watercourse           pump
              •    If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
                   this checklist
              •    If there are other aspects of taking or interfering with water proposed, then continue to question 4.6

 4.6   Is the work for water storage     (other than for a dam requiring      failure impact assessment)?


 [8] No       •    Continue to question 4.7

 0 Yes        •    A development permit is required and this application will be assessed by the chief executive of
                   OSOIP as assessment manager or concurrence agency against the Sustainable management of
                   water resources state code in the SOAP
              •    You must complete IDAS form 14-Water         storage

              •    If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
                   this checklist
              •    If there are other aspects of taking or interfering with water proposed, then continue to question 4.7

 4.7   Is the work for gravity   diversion   from a watercourse?


 [8] No       •    Continue to question 4.8

 0 Yes        •    A development permit is required and this application will be assessed by the chief executive of
                   OSOIP as assessment manager or concurrence agency against the Sustainable management of
                   water resources state code in the SOAP

              •    You must complete IDAS form 15-Gravity          diversion from a watercourse

              •    If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
                   this checklist
              •    If there are other aspects of taking or interfering with water proposed, then continue to question 4.8

 4.8   Is the work for a watercourse     diversion?


 [8J No       •    Continue to question 4.9

 0 Yes        •    A development permit is required and this application will be assessed by the chief executive of
                   OSOIP as assessment manager or concurrence agency against the Sustainable management of
                   water resources state code in the SOAP

              •    You must complete IDAS form 17-Watercourse             diversion

              •    If this is the only aspect of taking or interfering with water proposed, then that is the end of part 4 of
                   this checklist
               •   If there are other aspects of taking or interfering with water proposed, then continue to question 4.9

Page 20

 4.9       Is the work for other work for taking or interfering         with water?


 [8] No          •    End of part 4 of this checklist

 D     Yes       •    A development permit is required and this application will be assessed by the chief executive of
                      DSDI P as assessment manager or concurrence against the Sustainable management of water
                      resources state code in the SDAP
                 •    You must complete IDAS form 21-0ther              work in a watercourse

                 •     End of part 4 of this checklist

I Part 5-For     particular   dams

 5.1       Is the proposed    operational     work for the following?

 The construction of a dam more than 10 metres in height and having a storage capacity of               D   Yes     [8] No
 more than 1500 megalitres
 The construction of a dam more than 10 metres in height and having a storage capacity of               D   Yes     [8] No
 more than 750 megalitres and a catchment area that is more than three times its maximum
 surface area at full supply level
 Work carried out in relation to an existing non-referable dam that will result in the dam being        D   Yes     [8] No
 more than 10 metres in height and having a storage capacity of more than 1500 megalitres

 Work to an existing non-referable dam that will result in the dam being more than 10 metres in         D   Yes     [8] No
 height and having a storage capacity of more than 750 megalitres and a catchment area that
 is more than three times its maximum surface area at full supply level
 Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if         DYes        [8] No
 the dam is:
 •     more than 10 metres in height and having a storage capacity of more than 1500
       megalitres, or
 •     more than 10 metres in height and having a storage capacity of more than 750
       megalitres and a catchment area that is more than three times its maximum surface area
       at full supply level
 Works carried out in relation to a referable dam if, because of the works, the storage capacity        D   Yes     [8] No
 of the dam will increase by more than 10% after the works are carried out.
 Constructing a dam for which the chief executive under the Water Supply (Safety and                    D   Yes     [8] No
 Reliability) Act 2008 has given a notice to have the dam failure impact assessed.

 •     If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
       therefore not assessable development. This is the end of part 5 of this checklist
 •     If yes to any of the above, this application requires assessment by the chief executive of DSDIP as assessment
       manager or concurrence agency against the Particular dams state code in the SDAP.
       -    You must complete IDAS form 16-Particulardams
       -    End of part 5 of this checklist

I Part 6- Tidal work                                                                            NA

 6.1       Is the proposed    tidal work any of the following:

 Excluded work                                                                                          D   Yes     D    No

 Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the              D   Yes     D    No
 Sustainable Planning Regulation 2009

 Work carried out in a priority development area                                                        D   Yes     D    No



                                                                                                     Checklist 4-0perational work
                                                                                                      Version 4.1-1 October 2014

Page 21

 Work carried out on premises to which structure plan arrangements apply                            DYes        D     No

 •     If no to all of the above, continue to question 6.2.
 •     If yes to any of the above, this aspect of development is not assessable development and a development       permit is
       not required.

 6.2    Is any of the proposed      tidal work prescribed     tidal work?                      NA

 D     No      •      This application requires assessment by the chief executive of DSDIP as assessment manager or
                      concurrence against the Tidal works, or development in a coastal management district state code in
                      the SOAP
               •      You must complete IDAS form 23- Tidal works and development within coastal management          districts
               •      End of part 6 of this checklist

 D     Yes     •      You must complete IDAS form 23- Tidal works and development within coastal management          districts
               •      This application requires assessment by the local government as assessment manager and the chief
                      executive of DSDIP will be a concurrence agency for the application; you must refer a copy of the
                      application to DSDIP
               •      End of part 6 of this checklist

 Section reference:
 •     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
 •     Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18

I Part 7-Coastal    management                                                         NA

 7.1    Is the proposed     operational   work any olthe      following:

 Excluded works                                                                                     D   Yes     D     No

 Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the          D   Yes     D     No
 Sustainable Planning Regulation 2009

 Work carried out in a priority development area                                                    D   Yes     D     No
 Work carried out on premises to which structure plan arrangements             apply                D   Yes     D     No

 •     If no to all of the above, continue to question 7.2
 •     If yes to any of the above, this aspect of development is not assessable development and a development permit is
       not required. End of part 7 of this checklist.

 7.2    Is the proposed     operational   work for any olthe      following?                  NA

 Interfering with quarry material as defined under the Coastal Protection and Management Act        D   Yes     D     No
 1995 on state coastal land above high-water mark

 Disposing of dredge spoil or other solid waste material in tidal water                             D   Yes     D     No

 Constructing an artificial waterway                                                                D   Yes     D     No

 Removing or interfering with coastal dunes on land, other than State coastal land, that is in an   D   Yes     D     No
 erosion prone area as defined in the Coastal Protection and Management Act 1995 and above
 high-water mark




                                                                                                Checklist 4-Operational work
                                                                                                 Version 4.1-1 October 2014

Page 22

ft'




       •     If you answered no to all of the above, a development permit is not required for this aspect of development and
             that is the end of part 7 of this checklist
       •     If you answered yes to any of the above,
                  This application may require assessment by the chief executive of OSOIP as assessment manager or
                  concurrence agency against the Tidal works, or development in a coastal management district state code in
                  the SOAP
                  You must complete IDAS form 23- Tidal works and development within coastal management districts
                  End of part 7 of this checklist

       Section reference:
       •     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 5
       •     Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 to 18

      I Part a-Waterway      barrier works                                                       NA

       8.1    Is the proposed      operational   work any of the following:

       Work that is self-assessable
       Planning Regulation 2009
                                          development under schedule 3, part 2 of the Sustainable          0 Yes        0 No
       Work carried out on premises to which structure plan arrangements         apply                     0 Yes        0 No
       •     If no to all of the above,
              A development permit is required for this aspect of development. This application requires assessment by the
                chief executive of OSOIP as assessment manager or concurrence agency against the Constructing or raising
                waterway barrier works in fish habitats state code in the SOAP
              You must complete IDAS form 27-Waterway            barrier works
              End of part 8 of this checklist
       •     If yes to any of the above, this aspect of development is not assessable development and a development      permit is
             not required. End of part 8 of this checklist.

       Section reference:
       •     Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 6
       •     Sustainable Planning Regulation 2009, schedule 3, part 2
       •     Sustainable Planning Regulation 2009, schedule 7, table 2, item 29


      I Part 9-0eclared     fish habitat area                                        NA

       9.1    Is the operational    work reasonably      necessary   for any of the following?

       The maintenance of existing structures, including for example the following structures, if the
       structures were constructed in compliance with all the requirements under any Act relating to
                                                                                                           DYes        o No
       a structure of that type:
       •     boat ramps, boardwalks, drains, fences, jellies, roads, safety signs, swimming
             enclosures and weirs
       •     powerlines or associated powerline infrastructure .

       Educational or research purposes relating to the declared fish habitat area                         0 Yes       0 No
       Monitoring the impact of development on the declared fish habitat area                              0 Yes       0 No



                                                                                                        Checklist 4-Operalional work
                                                                                                         Version 4.1-1 October 2014

Page 23

ft'




      The construction or placement of structures, including for example, safety signs, swimming                  DYes        D    No
      enclosures and aids to navigation, if:
      •      the impact on the area is minor
      •      the structures are constructed in compliance with all the requirements,    under any Act
             relating to a structure of that type.

      Public benefit works, including, for example, the construction of runnels for mosquito control,             DYes        D   No
      the removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is
      minor

      •      If yes to any of the above, a permit is not required for this aspect of development but the proposed work must
             comply with any applicable self-assessable codes. End of part 9 of this checklist.
      •      If no to all of the above:
                  A development permit is required and this application requires assessment by the chief executive of DSDIP
                  as assessment manager or concurrence agency, against the Developmenf in or adjacent to a declared fish
                  habitat area state code in the SDAP
                  You must complete IDAS form 27-Waterway           barrier works
                  End of part 9 of this checklist

      Section reference:
      •      Sustainabie Planning Regulation 2009, schedule 3, part 1, table 4, item 7
      •      Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
      •      Sustainable Planning Regulation 2009, schedule 7, table 2, item 26

      Part 1D--Removal,       destruction   or damage of a marine plant                                    NA

      10.1    Is the proposed     operational   work any ofthe   following?

      For reconfiguring a lot that is assessable development under table 3, item 1, if there is a                 D   Yes     D   No
      development permit in effect for the reconfiguration

      For a material change of use that Is assessable development,        if there is a deveiopment   permit      D   Yes     D   No
      in effect tor the change of use

      Self-assessable     development under schedule 3, part 2 of the Sustainable Planning Regulation             D   Yes     D   No
      2009

      Carried out in a priority development area                                                                  D   Yes     D   No

      Carried out on premises to which structure plan arrangements        apply                                   D   Yes     D   No

      •      If yes to any of the above, this aspect of development is not assessable development and no development permit
             is required. End of part 10 of this checklist.
      •      If no to all of the above, continue to question 10.2

      10.2    Is the proposed     operational   work any of the following?                            NA

      Specified works in the area                                                                                 D   Yes     D   No

      Operational work that is a necessary and unavoidable part of installing or maintaining works or             D   Yes     D   No
      infrastructure required to support other development for which a development permit or
      compliance permit is not required or, if a development application or a request for compliance
      assessment is required, the permit is held or has been applied for.




                                                                                                            Checklist 4-0perational     work
                                                                                                                Version 4.1-1 October 2014

Page 24

•      If no to all of the above, this aspect of development is prohibited development and a development application
       cannot be made. End of part 10 of this checklist.
•      If yes to any of the above:
            A development permit is required and this application requires assessment by the chief executive of DSDIP
            as assessment manager or concurrence agency against the Removal, destruction or damage of marine
            plants state code in the SDAP
            You must complete IDAS form 26-Marine                plants and declared fish habitat areas
            End of part 10 of this checklist.

Section reference:
•      Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 8
•      Sustainable Planning Regulation 2009, schedule 3, part 2
•      Sustainable Planning Regulation 2009, schedule 7, table 2, item 30

Part 11-Great       Barrier   Reef Wetland      Protection     Areas                                       NA

11,1    Is the proposed       operational     work for a domestic      housing   activity   only?


0 No           •     Continue to question 11.2

0 Yes          •     A development      permit is not required for this aspect of development and this is the end of the
                     checklist

11.2    Is the proposed operational work the natural and ordinary consequence of a material change of use or
        reconfiguring  a lot for which the state was a concurrence agency under schedule 7, table 3, item 21 A or
        table 2, item 43A of the Sustainable Planning Regulation 2009?


0 No            •    Continue to question 11.3

0 Yes           •    A development permit is not required for this aspect of development and this is the end of the
                     checklist

11.3    Is the proposed operational           work associated     with government       supported     transport       infrastructure       or
        electricity infrastructure?


0 No            •    A development permit is required and this application requires assessment by the chief executive of
                     DSDIP as assessment manager or concurrence agency against the Wetland protection area state
                     code in the SDAP.
                •    You must complete IDAS form 33-Great               Barrier Reef Wetland protection area
                •    End of part 11 of this checklist

0 Yes           •    A permit is not required for this aspect of development but the proposed work must comply with any
                     applicable self assessable code
                •    End of part 11 of this checklist

Part 12-Construction          or modification     of a levee

12.1    Will the proposed       operational     work result in any of the following         off-property        impacts:

A change to the flow path of overland flow water where it enters or exits the property                                 0 Yes           ~ No
An increase in the velocity of flood flow beyond the boundaries of the property                                        0 Yes           ~        No

An increase in flooded area beyond the boundaries of the property                                                      0 Yes           ~ No
An increase in flood height beyond the boundaries of the property                                                      0 Yes           ~ No

                                                                                                                   Checklist 4-Operational work
                                                                                                                    Version 4.1-1 October 2014

Page 25

•      If no to all of the above this development is categorised as a Category 1 levee and must comply
       with any applicable self-assessable code - end of this checklist
•      If yes to any of the above continue to question 13.2

12.2       Will the proposed    operational   work result in any of the following   impacts:

An increase in flood height above the floorboards in an occupied building that results in 3 or
more people being affected
                                                                                                        0 Yes       ~ No

An increase in flood velocity above the floorboards in an occupied building that results in 3 or
more people being affected
                                                                                                        0 Yes       ~ No


•      If no to all of the above:
       -    This is categorised as a Category 2 levee and is subject to code assessment
       -    A development permit is required and this application requires assessment by the local
            government as assessment manager against the applicable code for the construction or
            modification of a levee
       -    You must complete IDAS form 2D-lnterfering        with overland flow water and construction or
            modification of a levee.
       -     End of this checklist.
•      If yes to any of the above:
       -    This is categorised as a Category 3 levee and is subject to impact assessment
       -    A development permit is required and this application requires assessment by the local
            government as assessment manager against the applicable code for the construction or
            modification of a levee
       -    This application will require assessment by the chief executive of DSDI P as concurrence agency
            against the Construction or modification of levees state code in the SOAP
             You must complete IDAS form 2D-lnterfering       with overland flow water and construction or
             modification of a levee.
             End of this checklist.


Section references:
•      Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 11
•      Sustainable Planning Regulation 2009, schedule 7, table 2, item 48.

Privacy-please         refer to your assessment     manager for further   details on the use of information   recorded   in
this form


Disclaimer:
While the Department of State Development, Infrastructure and Planning (DSDIP) believes that the information
contained on this checklist and provided as part of this process will be of assistance to you, it is provided on the basis
that you will not rely on the information. It is your responsibility to make your own enquiries regarding the interpretation
and application of the applicable legislation to your circumstances.


To the full extent permitted by law, DSDIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or other
consequence which may arise from your reliance on this process and the information contained on this checklist.




OFFICE USE ONLY




                                                                                                    Checklist 4-Operational work
                                                                                                     Version 4.1-1 October 2014

Page 26

    Date received      1                                           1 Reference   numbers



    The Sustainable Planning Act 2009 is administered by DSDlP. This checklist and all other required application
    materials should be sent to your assessment manager and any reterral agency.




Department of State Development.   Infrastructure   and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (13 74 68)
[email protected]                                                                            Checklist 4-0perational work
                                                                                                  Version 4.1-1 October 2014
www.dsdip.qld.gov.au

Used in these records

About this file

File size
9.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0056 - IDAS Forms Part 1 of 2.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.