    1.3     Does any of the proposed       operational   work involve taking or interfering   with:
            °   water from a watercourse,        lake or spring, or from a dam constructed     on a watercourse     or lake
            °   artesian water as defined under the Water Act 2000, schedule 4
            °   overland flow water
            °   subartesian     water


    ~      No             Continue to question 1.4
                   °
    0              °      Complele part 4 of this checklist

    1.4     Is the operational work the construction of a dam, or carried out in relation to a dam, and, because of the
            works, the dam must be failure impact assessed?


    ~      No             Continue 10question 1.5
                   °
    0              °      Complele part 5 of Ihis checklisl


    1.5     Is any of the proposed operational       work tidal works?


    ~      No      •      Conlinue to question 1.6

    0              °      Complete part 6 of this checklist

    1.6     Is any of the operational     work proposed to be carried out completely      or partly within a coastal
            management district?


    ~      No             Continue to question 1.7
                   °
    0              °      Complete part 7 of this checklist

    1.7     Is any of the proposed operational       work for constructing   or raising waterway barrier works as defined
            under the Fisheries Act 1994?


    ~      No             Continue 10question 1.8
                   °
    0              °      Complete part 8 of this checklisl

    1.8    Is any of the proposed operational work to be carried out completely           or partly within a declared fish
    habitat area as defined under the Fisheries Act 1994?


    ~      No      •      Continue to question 1.9

    0              •      Complele part 9 of this checklist

    1.9     Is any ofthe proposed operational        work removing,   destroying   or damaging    marine plants as defined
            under the Fisheries Act 1994?


    ~      No      •      Continue 10question 1.10

    0              •      Complete part 10 of this checklist


    1.10    Does the proposal involve operational        works that are high impact earthworks        in the Great Barrier Reef
            Wetland Protection Area?


~          No    l'-o__   C_o_n_t_in_u_e_I_0_q_U_e_S_li_on_1_.1_1                                                                 _


                                                                                                         Checklist 4-Qperational work
                                                                                                          Version 4.1-1 October 2014

Used in these records

About this file

File size
9.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0056 - IDAS Forms Part 1 of 2.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.