Skip to the record
Noosa’s premier civic archive.

Council archive · source document

OPW15/0056 - IDAS Forms Part 1 of 2

of 26

Text shows just the words. Original shows the document exactly as it was published.

 DYes          •    This aspect of the development is assessable development and you will need a development permit
               •    The local government will be the assessment manager for the application and the distributor-retailer
                    (or SARA) will be a concurrence agency for the application.
               •    End of part 3 of this checklist

 Section reference:
 •    Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
 •     Sustainable Planning Regulation 2009, schedule 7, table 2, item 47

I Part 4-Taking or interfering with water
 4,1    Is the proposed operational work to be carried out in a priority development area or on premises to
        which structure plan arrangements apply?

 ~     No      •    Continue to question 4.2

 D     Yes     •    This aspect of development is not assessable development and does not require a development
                    permit
               •    End of part 4 of this checklist

 4,2    Does any of the proposed operational work involve taking or interfering with water from a watercourse,
        lake or spring or from a dam constructed on a watercourse or lake?

 ~     No      •    End of part 4 of lhis checklist

 D     Yes     •    Continue to question 4.3

 4,3    Are the proposed works for any of the following purposes?

 Taking water from a watercourse, lake or spring in an emergency situation for a public                   D   Yes      ~    No
 purpose or fighling a fire destroying, or threatening 10 destroy, a dwelling house
 Taking waler from a watercourse, lake or spring if:                                                      D   Yes      ~    No
 •     the waler is laken by lhe owner of land adjoining lhe watercourse, lake or spring
 •     the waler is laken for domeslic purposes or stock purposes
 Taking waler from a watercourse, lake or spring for camping purposes or for watering                     D   Yes      ~ No
 travelling slock
 Usin9 a water lruck 10 pump water                                                                        D   Yes      ~    No

 •     If no to all of the above, conlinue to question 4.4
 •     If yes 10 any of the above, this aspect of development does not require a development permit.
           If this is the only aspecl of taking or interfering with water proposed then lhal is the end of part 4 of this
              checklist
           If there are other aspects of taking or interfering with water proposed, continue to question 4.4

 4.4    Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
        Sustainable Planning Regulation 2009?

I~     No     I.    Go to question 4.5

              Its   ~~I~




                                                                                                      Checklist 4-0perational work
                                                                                                       Version 4.1-1 October 2014

Used in these records

About this file

File size
9.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0056 - IDAS Forms Part 1 of 2.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.