Council archive · source document
OPW15/0056 - IDAS Forms Part 1 of 2
DYes • This aspect of the development is assessable development and you will need a development permit
• The local government will be the assessment manager for the application and the distributor-retailer
(or SARA) will be a concurrence agency for the application.
• End of part 3 of this checklist
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 47
I Part 4-Taking or interfering with water
4,1 Is the proposed operational work to be carried out in a priority development area or on premises to
which structure plan arrangements apply?
~ No • Continue to question 4.2
D Yes • This aspect of development is not assessable development and does not require a development
permit
• End of part 4 of this checklist
4,2 Does any of the proposed operational work involve taking or interfering with water from a watercourse,
lake or spring or from a dam constructed on a watercourse or lake?
~ No • End of part 4 of lhis checklist
D Yes • Continue to question 4.3
4,3 Are the proposed works for any of the following purposes?
Taking water from a watercourse, lake or spring in an emergency situation for a public D Yes ~ No
purpose or fighling a fire destroying, or threatening 10 destroy, a dwelling house
Taking waler from a watercourse, lake or spring if: D Yes ~ No
• the waler is laken by lhe owner of land adjoining lhe watercourse, lake or spring
• the waler is laken for domeslic purposes or stock purposes
Taking waler from a watercourse, lake or spring for camping purposes or for watering D Yes ~ No
travelling slock
Usin9 a water lruck 10 pump water D Yes ~ No
• If no to all of the above, conlinue to question 4.4
• If yes 10 any of the above, this aspect of development does not require a development permit.
If this is the only aspecl of taking or interfering with water proposed then lhal is the end of part 4 of this
checklist
If there are other aspects of taking or interfering with water proposed, continue to question 4.4
4.4 Are the proposed works self-assessable development under schedule 3, part 2, table 4, item 1 of the
Sustainable Planning Regulation 2009?
I~ No I. Go to question 4.5
Its ~~I~
Checklist 4-0perational work
Version 4.1-1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0056 - IDAS Forms Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.