Council archive · source document
OPW15/0056 - IDAS Forms Part 1 of 2
4.9 Is the work for other work for taking or interfering with water?
[8] No • End of part 4 of this checklist
D Yes • A development permit is required and this application will be assessed by the chief executive of
DSDI P as assessment manager or concurrence against the Sustainable management of water
resources state code in the SDAP
• You must complete IDAS form 21-0ther work in a watercourse
• End of part 4 of this checklist
I Part 5-For particular dams
5.1 Is the proposed operational work for the following?
The construction of a dam more than 10 metres in height and having a storage capacity of D Yes [8] No
more than 1500 megalitres
The construction of a dam more than 10 metres in height and having a storage capacity of D Yes [8] No
more than 750 megalitres and a catchment area that is more than three times its maximum
surface area at full supply level
Work carried out in relation to an existing non-referable dam that will result in the dam being D Yes [8] No
more than 10 metres in height and having a storage capacity of more than 1500 megalitres
Work to an existing non-referable dam that will result in the dam being more than 10 metres in D Yes [8] No
height and having a storage capacity of more than 750 megalitres and a catchment area that
is more than three times its maximum surface area at full supply level
Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if DYes [8] No
the dam is:
• more than 10 metres in height and having a storage capacity of more than 1500
megalitres, or
• more than 10 metres in height and having a storage capacity of more than 750
megalitres and a catchment area that is more than three times its maximum surface area
at full supply level
Works carried out in relation to a referable dam if, because of the works, the storage capacity D Yes [8] No
of the dam will increase by more than 10% after the works are carried out.
Constructing a dam for which the chief executive under the Water Supply (Safety and D Yes [8] No
Reliability) Act 2008 has given a notice to have the dam failure impact assessed.
• If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
therefore not assessable development. This is the end of part 5 of this checklist
• If yes to any of the above, this application requires assessment by the chief executive of DSDIP as assessment
manager or concurrence agency against the Particular dams state code in the SDAP.
- You must complete IDAS form 16-Particulardams
- End of part 5 of this checklist
I Part 6- Tidal work NA
6.1 Is the proposed tidal work any of the following:
Excluded work D Yes D No
Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the D Yes D No
Sustainable Planning Regulation 2009
Work carried out in a priority development area D Yes D No
Checklist 4-0perational work
Version 4.1-1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0056 - IDAS Forms Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.