Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

OPW15/0056 - IDAS Forms Part 1 of 2

of 26

Text shows just the words. Original shows the document exactly as it was published.

 4.9       Is the work for other work for taking or interfering         with water?


 [8] No          •    End of part 4 of this checklist

 D     Yes       •    A development permit is required and this application will be assessed by the chief executive of
                      DSDI P as assessment manager or concurrence against the Sustainable management of water
                      resources state code in the SDAP
                 •    You must complete IDAS form 21-0ther              work in a watercourse

                 •     End of part 4 of this checklist

I Part 5-For     particular   dams

 5.1       Is the proposed    operational     work for the following?

 The construction of a dam more than 10 metres in height and having a storage capacity of               D   Yes     [8] No
 more than 1500 megalitres
 The construction of a dam more than 10 metres in height and having a storage capacity of               D   Yes     [8] No
 more than 750 megalitres and a catchment area that is more than three times its maximum
 surface area at full supply level
 Work carried out in relation to an existing non-referable dam that will result in the dam being        D   Yes     [8] No
 more than 10 metres in height and having a storage capacity of more than 1500 megalitres

 Work to an existing non-referable dam that will result in the dam being more than 10 metres in         D   Yes     [8] No
 height and having a storage capacity of more than 750 megalitres and a catchment area that
 is more than three times its maximum surface area at full supply level
 Works that involve the increase of capacity of a non-referable dam by more than 10 per cent if         DYes        [8] No
 the dam is:
 •     more than 10 metres in height and having a storage capacity of more than 1500
       megalitres, or
 •     more than 10 metres in height and having a storage capacity of more than 750
       megalitres and a catchment area that is more than three times its maximum surface area
       at full supply level
 Works carried out in relation to a referable dam if, because of the works, the storage capacity        D   Yes     [8] No
 of the dam will increase by more than 10% after the works are carried out.
 Constructing a dam for which the chief executive under the Water Supply (Safety and                    D   Yes     [8] No
 Reliability) Act 2008 has given a notice to have the dam failure impact assessed.

 •     If no to all of the above, the proposed operational work is not required to be failure impact assessed and is
       therefore not assessable development. This is the end of part 5 of this checklist
 •     If yes to any of the above, this application requires assessment by the chief executive of DSDIP as assessment
       manager or concurrence agency against the Particular dams state code in the SDAP.
       -    You must complete IDAS form 16-Particulardams
       -    End of part 5 of this checklist

I Part 6- Tidal work                                                                            NA

 6.1       Is the proposed    tidal work any of the following:

 Excluded work                                                                                          D   Yes     D    No

 Work that is self-assessable development under schedule 3, part 2, table 4, item 8 of the              D   Yes     D    No
 Sustainable Planning Regulation 2009

 Work carried out in a priority development area                                                        D   Yes     D    No



                                                                                                     Checklist 4-0perational work
                                                                                                      Version 4.1-1 October 2014

Used in these records

About this file

File size
9.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW15_0056 - IDAS Forms Part 1 of 2.pdf · 9.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.