Council archive · source document
OPW15/0056 - IDAS Forms Part 1 of 2
ft'
The construction or placement of structures, including for example, safety signs, swimming DYes D No
enclosures and aids to navigation, if:
• the impact on the area is minor
• the structures are constructed in compliance with all the requirements, under any Act
relating to a structure of that type.
Public benefit works, including, for example, the construction of runnels for mosquito control, DYes D No
the removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is
minor
• If yes to any of the above, a permit is not required for this aspect of development but the proposed work must
comply with any applicable self-assessable codes. End of part 9 of this checklist.
• If no to all of the above:
A development permit is required and this application requires assessment by the chief executive of DSDIP
as assessment manager or concurrence agency, against the Developmenf in or adjacent to a declared fish
habitat area state code in the SDAP
You must complete IDAS form 27-Waterway barrier works
End of part 9 of this checklist
Section reference:
• Sustainabie Planning Regulation 2009, schedule 3, part 1, table 4, item 7
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 26
Part 1D--Removal, destruction or damage of a marine plant NA
10.1 Is the proposed operational work any ofthe following?
For reconfiguring a lot that is assessable development under table 3, item 1, if there is a D Yes D No
development permit in effect for the reconfiguration
For a material change of use that Is assessable development, if there is a deveiopment permit D Yes D No
in effect tor the change of use
Self-assessable development under schedule 3, part 2 of the Sustainable Planning Regulation D Yes D No
2009
Carried out in a priority development area D Yes D No
Carried out on premises to which structure plan arrangements apply D Yes D No
• If yes to any of the above, this aspect of development is not assessable development and no development permit
is required. End of part 10 of this checklist.
• If no to all of the above, continue to question 10.2
10.2 Is the proposed operational work any of the following? NA
Specified works in the area D Yes D No
Operational work that is a necessary and unavoidable part of installing or maintaining works or D Yes D No
infrastructure required to support other development for which a development permit or
compliance permit is not required or, if a development application or a request for compliance
assessment is required, the permit is held or has been applied for.
Checklist 4-0perational work
Version 4.1-1 October 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0056 - IDAS Forms Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 9.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.