Skip to the record
Accept no substitutions.

Original source · versioned page text

RFI - App B - Updated Engineering - 11 Robert St

of 28

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 7, section 4. The text section number identifies this passage in the reader.

E
                                                                                                                                                                                                                                                                                                                                                                                                STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.                                                                                           DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                                                                     LEAST 3m WIDE.
 NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                                                           5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.
Log in to download the original file

RFI - App B - Updated Engineering - 11 Robert St.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.