Original source · versioned page text
RFI - App B - Updated Engineering - 11 Robert St
Original PDF page 13, section 2. The text section number identifies this passage in the reader.
1.6
ew
1
1.34
1.48
1.6
8.13
6.67
1.63
ew
1.68 1.61 1.54
SURVEY DATUM
2.00 B99
1.50
)
TBM2 Nail in Kerb
NZ
5 1
1.9 1.9 2.03 1.97 5
1.8
1
1.5
U_
ew
STANDARDS 2004 (AU_NZ) .
(c) 2025 Transoft Solutions, Inc. All rights reserved.
S
0 2.04 1.92
1.96
2.1
(A
S
0 3
1.93
2
2.1 1.8
2.1 2.00
S
S 99
1.93
1 1 7
04
1.9 1.9 1.6
B99
1 81
S
1.92
1.8 1.
2.10
20
W ew
RD B
S
Meter
NEW
ASSOCIATED CONSULTANTS
2.58
5
Not Located
5
2.1 STANDARDS 2004 (AU_NZ)
Sewer M/H
4 (c) 2025 Transoft Solutions, Inc. All rights reserved.
1
S
RL 1.458
2.1 9 9 1.7
1.7
1.6 1.6
1.67
2
1.31
2.1 8
1.8
DA
1.45
Found
No Mk
5
1.81.85 40.234
Telstra
5 6
ew
1.85
5
Power Pole
AN
1.7 5 1.6
1.70
1.6 1.60
1.7
1.99
#95302
.77
1.62
1.92
2.07 1.83
ST
2.13
1.49
1.91 1 1.74 1.67 2
1.5
Found
2.28
No Mk
2.57 2.48 2.53 2.70 2.71
1.48
2.53 269°57' 2.52
1.46
1.32
Timber Fence on Existing Block Retaining Wall
1.47
1.49
5.95 6.48 6.46 6.45 6.46
7.46 7.61 7.63 7.63 7.63
Stormwater M/H
SL 1.48, IL
Turning circles may extend over kerbs
less than 150 mm high in accordance
with AS 2890.1
REVISION LIST
A ORIGINAL ISSUE 5/10/24
B REVISED 29/10/24
C REVISED 24/2/25
D REVISED 11/8/25
E REVISED FOLLOWING RFI 16/10/25
Computer File
240771OPW.DWG
DRAWING NUMBER SHEET REV.
24-0771-OPW13 13 E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.