Minor Change Existing Approval MCU22 0087 01 & OPW22 0140 01 (As Published) · MCU22/0087.01
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 21 July 2027, unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. Tree protection fencing must be installed under the supervision of the Project Arborist. (Refer
to Retention of Existing Trees Conditions).
4. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
5. A condition report of the Council drainage system in Berrima Row in the frontage of the site
and extending to the next upstream pit must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing pipe between
the pits.
6. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
7. Deleted.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
9. A Construction Management Plan must be submitted to Council at least 5 business days
prior to the prestart meeting. The plan must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction
ii. maintenance of safe vehicle and pedestrian access for the areas affected by the
works during and after daily construction has ceased
iii. proposed fencing to the site during the construction phase of the development
iv. provision for worker car parking
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues.
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.
Page 8 of 20
Document Set ID: 24309867
Version: 5, Version Date: 20/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval MCU22 0087 01 & OPW22 0140 01 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval MCU22 0087 01 & OPW22 0140 01 (As Published).pdfRelated documentApplication case desk ↗
001 ECM_24309867_v5_Minor Change Existing Approval MCU22 0087 01 & OPW22 0140 01.pdfRelated documentApplication case desk ↗