            Personnel                  Base Architecture are responsible for:
            responsible
                                           •   Ensuring the engaged FSC possesses all required qualifications.
                                           •   Ensuring that clearing works cease immediately if dictated by the FSC, e.g. if
                                               a Koala is identified within 100m of works, or if injured fauna requires
                                               immediate transportation to a veterinarian/carer.
                                       The Clearing Contractor is responsible for:
                                           •   Communicating clearly with the FSC by use of radio, hand signals or other
                                               agreed upon methods.
                                           •   Ceasing clearing and/or dewatering while the FSC is assessing fauna,
                                               inspecting habitat features, transporting or relocating fauna, or is otherwise
                                               engaged.
                                       The FSC is responsible for:
                                           •   Managing all fauna during works.
                                           •   Maintaining detailed records of all fauna interactions and habitat features and
                                               preparing reports.

            Reporting and              The FSC / Ecologist is responsible for:
            auditing
                                           •   Providing Base Architecture with information pertaining to fauna
                                               management during works, as part of the Post-Clearance Report.
                                           •   Maintaining a fauna register and submitting applicable returns to DES as per
                                               permit requirements.

            Corrective action          In the event that practices are inconsistent with the strategies outlined in this FMP,
                                       the Contractor should take the corrective steps and report non-compliance to the
                                       relevant personnel.

            Timing                     The duration of the clearing period.




           FAUNA MANAGEMENT PLAN | Summit Road, Pomona
                                                                                                                                 23


Document Set ID: 22570982
Version: 1, Version Date: 05/09/2023
Log in to download the original file

Approved Plan - OPW230084.pdf · 9.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.