Original source · versioned page text
Approved Plan - OPW230084
Plans and drawings: the text below has words only, no drawings.
The following estimate of tube stock is for tendering purposes only and is not an accurate
representation of the quantity required. On Site ground-truthing after weed control works occur is
necessary to provide an accurate quantity. Final density required for rehabilitation areas is set out in
the criteria. Figure 7 below displays the viable planting area at the site, with the western side
highlighted in green and the eastern side highlighted in blue.
Figure 7. Rehabilitation area with viable planting areas highlighted.
Western side: Approximately 1000m2 Eastern side: Approximately 300m2
Estimated current plant coverage: 40% Estimated current plant coverage: 40%
Ground covers & grasses: over 20% of area Ground covers & grasses: over 60% of area
1 per 1m2 1 per 1m2
= 200 tube stock = 180 tube stock
Small trees: over 20% of area
1 per 3m2
= 66 tube stock
Medium trees: over 20% of area
1 per 5m2
= 40 tube stock
REHABILITATION MANAGEMENT PLAN | 43 – 45 Summit Rd, Pomona 11
Document Set ID: 22570983
Version: 1, Version Date: 05/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.