Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Attachment F - Effluent disposal report

Attached to the e-mail MCU14/0039 Response to information request Traffic, Effluent& Waste reports email 3 of 3.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

 

 

 

Depth of seasonal watertable:....... cece ees eeseseeecseeereeateses

Need for cut off drains/diversions banks: ...

Needifor suntace watemecllecton/ Gut iofidlralis; 2x. -skexxccwsmvsensgraebenedanster tun cnqeranswapravenvyrernencruencesconessenuess

Treatment plant lid shall be above Q100 flood prone afea:... oo... cece eee eee een eee teeter nents setae ee

Availability of reserve/setback areas (show details on sketch plan)

Reserve area available for extensions: 2.0007... ccccceeceeeereeeee % of design area:....100%. ....... eee

Photographs attached: YES L] NO K] (specify details):.0...0..0 cocci cce cee ceteeteeeeernreeteeeenserueeaneens

SOIL INVESTIGATION

Soil Profile Determination: Mark on site plan scaled or dimensioned: ...............00000. cents
Test Pit! [1 Borehole: @theh: Wl _. Rl6aseSPECify JE... s.sesecez.:0s den eigen es LA

Reporting: (Attach Bore Logs):............ccsceccceeeceeneeere eee aee ees

  
 
   

Estimated Soil Category: .....0...00..0 cece cece ener te eee cnttteeereneas

 

 

 

 

 

 

 

 

 

 

 

 

 

SUMMARYS? tay oes eaten cnn) Rane eter te ercem lees Sone Permeability:........0.00...0. m/day DLR/ DIR
Site Test 1 2 3 4 5 6 ite

Soil

Category 6 6 6

GENERAL COMMENTS

REMaiRiMGEMAttens OMCOMCEIMANS? 6. .....c cc accece enn sievecie ses cesses ensleneee se ssgjeceans Hesse pas eglyedeessselieensne es s.ana\selchlileeeee

Type of land application system considered best suited to site and why?
ASTS & Surface Irrigation - Site & Soil Assessment

Overall evaluation of minimum land application area for the site (comprising, absorption area, space between
and surrounding the absorption area elements, setbacks and the reserve area): ..........00 000s ecee eee e ences

 

  

Other Comments eg special precautions which may be needed:

 

 

 

      

TY PEKOMSYVSCOM 5 erated cet aneis ae acted ow aginaiuntbdacnionntlnedaypeas «oe «do-« BS palaepiearenng Nama CetEM ne Ree wma ee elt Mal banenenerse eas

TYP@roOMBsposalt Ana Wer ee) ..cis... ceccnned end neh beg cece Bebb ceeeadueceseetscntercaeeersteleGhhee ite oesdieseutlcer tenet, deals
LE OF FAR WOK ce ce) a neir as cep canenscennnneenemetpaseneaianenenernnntaneeereqinscnenesmhennsesenenysene nnenharenagensiaceanesenenseneenaces
Emiiters spacings.. ... Spray spacings.. ‘i

Me HPOWAS eos. es nnt sealant ee es es ania Flush out valves..............cc cece eeeees Air relief valves.....0...... ee
Slope at Disposal Area............ cee eeee neces % Surface Irrigation fixed sprinklers only (max 20 % slope

Movable sprinklers spray area must cover minimum 50% of LAA, Surface Irrigation area to be mulched and
planted to ensure effluent is contained within designated area

 

ize of retention moun

Soil modifications ripped /import soil /mulched / planted (Please circle best description)

Total Load of all system on the property over 20 EP (Please tick box) YES LI NO (

Holding Tank position and size on site plan including pump out line position (Please tick box) YES 0D NO 0

 

 

 
Log in to download the original file

Attachment F - Effluent disposal report.pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.