Attachment F - Effluent disposal report
Attached to the e-mail MCU14/0039 Response to information request Traffic, Effluent& Waste reports email 3 of 3.
The loading rate that applies to the irrigation of a land application area with effluent of a secondary quality. It is expressed in L/m2/day or mm/week. If a spray irrigation system is used, the secondary effluent is subject to continuous disinfection. Durable Aggregate An aggregate with the grading requirements specified in AS 2758.1 for single-size course aggregate for nominal sizes from 20mm - 40mm. Dry Vault Commonly known as “composting toilets”, a chamber that receives and treats human and domestic organic waste using a biological degradation or dehydrating process. The only water used is for cleaning or assisting the biological degradation process. Geotextile Any permeable durable synthetic textile material used with foundations, soil, rock, earth or other geotechnical engineering related material. Land Application Area The designated area of land and reticulation system used for the disposal of the treated effluent. LTAR The long term average rate an effluent can be adsorbed into the soil of a disposal system, expressed in litres per square meter per day. LTAR is dependant on effluent quality, permeability and organic loading. Permeability The rate clean water is transmitted through a soil, expressed in meters per day. Terrace Where the trenches are in an area where the slope exceeds 15% (approximately 1 in 7) they must be terraced. Water Reduction Fixtures Fixtures include 11/5.5 litre water closets, shower flow restrictors, aerator taps and water conserving washing machines. Nutrient Buffer Zone An area planted with suitable plants required to take up any excess nutrients produced within the area. Plant selection should include native and indigenous species. This would include grasses shrubs and trees. Report Limitations: The log sections in this report should be representative of the soil conditions over this site, however, soil conditions can change dramatically over short distances. The person responsible for installing the system must observe the soil profile and ensure it matches the soil profiles recorded in this report. If soil conditions differ from those recorded by us, we must be immediately notified so that further investigation can be carried out and the system design modified if necessary. This work may involve additional fees and costs. This company will not accept any responsibility for additional costs to any party as a result of soil variations. In writing this report, we have also considered all the information supplied to us by our client. Should the client or his agent have omitted to supply us with relevant information, our report may be irrelevant and/or inappropriate. We do not take responsibility for the consequences in such cases and we will make an additional charge if as a result, more testing or rewriting of this report is necessary. AUSTRALIAN SOIL INVESTIGATIONS ASI Ref: 150105(A)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.