10/0760 - Operational Works - Jetty [As Published] · 142010.760
GREE Gackt Asscssaat Sys iem Application Details - IDAS form 1 (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) You MUST complete ALL questions unless the form indicates otterIOMSIORARAI beh all necessary information and documentation will result in your appliation not being a properly made application. For all development applications, you must: - : 2 bMAY 2010 ¢ complete this form (Application details - IDAS form 1) & \ * complete any other forms relevant to your application * ’ Tewantin ae ¢ — provide any mandatory supporting information identified on the-forms-as being required to accompany your application. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. Applicant details (note: the applicant is the person responsible for making the application and need not be the @ owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any development permit or preliminary approval that may be issued as a consequence of this application will 4 |be issued to the applicant.) a Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another applicant" button below. Name?s (individual or company name in full) [Noosa Jetty Builders: For companies, contact name Danny Reed Postal address PO Box 299 Noosaville Contact phone number 0408137526 Mobile number (non-mandatory) Fax number (non-mandatory) 154743480 e-mail address (non-mandatory) inoosajetty [email protected] 1 1. What is the nature of development proposed? (tick all applicable boxes) (J material change of use of premises building work (1) operational work (J reconfiguring a lot Department of Infrastructure and Planning : Gp
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
OO
2. What type of approval is being sought?
development permit
CO pretiminary approval
(1) both - provide details below
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
KI No - , : SO {
(]_ Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/tot for the premises or street address/ot on plan for the land adjoining or adjacent to the
premises
Street Address Lot on plan
description
Local government area
Unit | Street Street name and official Post Lot No.| Plan type: (e.g. Logan, Cairns)
No. | No. suburb/locality name code *} and plan no.
1 13 |Waterside Court 4566 |891 | rpg06963 Sunshine coast regional
(Street address / tot on plan
x Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone Local government
reference Datum area (If applicable)
Easting Northing | Latitude { Longitude : P
‘ (] GDA94
1 C) wese4
LJ other
5. Total area of the premises on which the development is proposed (indicate hectares or m?)
764m2 ‘
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 |house
7. Provide a brief description of the Proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Timber jetty
Application Details - 1DAS form 1
Version 1.0 18 December 2009
Page 3
OOO
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
( No
{] Yes - complete either table D, table € or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land Dec & yt ge om —T a. L e.
We, the above-mentioned owner/s of the lang landy€onsent to the making of this application.
Signature of owner/s of the a 4 Vhege—
Date
Table E
Name of owner/s of the land
(J The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
Oo By making this application, |, the applicant, declare that the owner has given written consent to the making of
the application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
No [J Yes - complete table G
10. Identify if any of the following apply to the premises (tick applicable box/es)
ix adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
ol . on strategic port land under the Transport Infrastructure Act 1994 - complete table !
(J __ ina tida! water area - complete table J
Table H Name of water body, watercourse or aquifer
1 {Noosa Waters
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.)
PXJNo [_] Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - iDAS form 1
Version 1.0 18 December 2009
Page 4
LILO
12. Does the proposal inciude new building work or operational work on the premises? (including any
* Services)
LJNo [Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
13. Is the payment of a portable tong service leave levy applicable to this application? (refer to the notes at the
‘end of this form for more information)
XJ No - Go to question 15 CO Yes .
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
XX No
(Yes - provide details below
16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)
Method of lodgement to
Description of attachment or title of attachment assessment manager
4° -|form 6 over the counter
2 {check list
17. Applicant's deciaration
X By making this application, | declare that all information in this application is true and correct (note: it is
untawful to provide false or misleading information).
Application Details - IDAS form 4
Version 1.0 18 December 2009
Page 5
LILI
Notes for completing this form
Question.8: .
e Section 263.of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.
* Owner's consent is not required for a mobile and temporary-ERA. .
Question 9:
« Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation.
Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
required to be given, and the evidence required, to support the application.
Question 13:
* The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
long service leave levy is payable. -
* The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14: .
« The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
* Building and Construction Industry Notification and Payment Forms are available from any Queensland post
office or agency, on request from QLeave, or can be completed on the QLeave website at
www.gleave.qid.gov. au. For further information contact QLeave on 1800 803 481 or www.qleave.qid.gov.au.
Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
’ 2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers lo | Veo
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To: Council. | have been engaged as the private certifier for the
’ building work referred to in this application.
Date of , BSA Certification {Building
Name . : ‘ wey
engagement license number classification/s
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 6
CID »
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
age QLeave Project |Amount _4 |form sighted by|Name of officer who
Description of the work Number paid ($) Date paid assessment {sighted the form
manager
The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and ail other required application materials should be sent to your assessment manager and any réferral
agencies.
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 7
a
integrated| DevelopmentAssessment|System| form]
Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Inc lete forms or forms without al
necessary information and documentation will result in your application n bene lap neersteGeiem ter
_For all development applications, you must:
« complete Applicant details - IDAS form 1 re ~ 26 MAY 2010
¢ complete any other forms relevant to your application ? . : ‘
¢ provide any mandatory supporting information identified on the forms as being reqUr AM aRIIRany you an
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic portland under the Trensport Infrastructure Act 1994.
1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
[X] building work - complete table A {J operational work - complete table B
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
jetty
What type of approval is being sought? (if you have indicated multiple works in the above question, please generate
another Table A to detail each approval request)
XX] development permit |; {] preliminary approval
Are there any current approvals Sssociated with this application? (e.g. material change of use)
i] No LJYes - provide detaiis below
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 14,500
Department of Infrastructure and Planning ‘ Gp
Page 8
ocr
se
3. Confirm the following mandatory supporting information accompanies this application
Confirmation
of lodgement Method of lodgement
All applications for operational works
site plans drawn to scale which show the following:
eo
the location and site area of the land to which the application relates
(relevant land) .
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including
the dimensions of those lots), existing or proposed road reserves,
building envelopes and existing or proposed open space (note:
numbering is required for alt lots)
any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points on the relevant land
({_]confirmed | over the counter
a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents
relevant to the application
{_]confirmed over the counter
Applications for operational works involving earthworks (filling and excavating)
* Idrawings showing:
existirig and proposed contours
areas to be cut and filled
the location and level of any permanent survey marks or reference
stations used as datum for the works
the location of any proposed retaining walls on the relevant land and
their height
the defined flood level (if applicable)
the defined fill level (if applicable)
(|confirmed |electronic
Applications for operational works involving roadworks
drawings showing:
existing and proposed contours
the centreline or construction line showing chainages, bearings, offsets
if the construction line is not the centreline of the road and alt
intersection points
information for each curve including tangent point chainages and
offsets, curve radii, arc tength, tangent length, superetevation (if
applicable) and curve widening (if applicable)
kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
edge of pavement where kerb is not constructed
position and extent of channelisation
location and details of ail traffic signs, guideposts, guardrail and other
street furniture
pavement markings including details on raised pavement markers
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material
[_] confirmed
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 9
LICL Confirmation of lodgement Method of todgement Applications for operational works involving stormwater drainage drawings showing: existing and proposed contours drainage locations, diameters and class of pipe, open drains and easements manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels e inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels []confirmed Applications for operational works involving water reticulation drawings showing: ¢ kerb lines or edge of pavement where kerb is not constructed * location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe 2 alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicabte) location of bench marks and reference pegs L] confirmed Applications for operational works involving sewerage reticulation drawings showing: location of all existing and proposed services location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) location of all existing and proposed sewer lines and manhole locations Liconfirmed Applications for operational works involving street lighting drawings showing: ‘ocation of ail light poles and service 2 conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels [_]confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 10
dae rar EY Confirmation of lodgement Method of lodgement Applications for operational works involving public utility services drawings showing: any existing light poles and power poles any existing underground services details of proposed services alternation to existing services (Iconfirmed is 4. & Applications for operational works involving landscaping works oan drawings showing: the location of proposed plant species a plant schedule indicating common and botanical names, pot sizes and numbers of plants . planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences , the proposed maintenance period irrigation system details 1 (|confirmed Notes for completing this form: ¢ This form can also be used for development applications for building works or 6perational works assessable against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to mean the land use plan for the airport land. Privacy -please refer to your assessment manager for further details on the use of information recorded in this form. OFFICE USE ONLY Date Received Reference Numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 11
tk wal’ |
d@acoacnn Assessmenti Seem Checklist al
at PA ea
Development assessment checklist
checklist 1
(Sustainable Planning Act 2009, version 1.0 18 December 2009)
Development Counter
: 26 MAY 2010
This checklist applies to the carrying out of development generally. r &, e
You are not required to complete this checklist as part of your development pplication, + howb MV AtiPubmit thé
checklist with your application if you wish. The purpose of the checklist is to assist you-inidentifying: :
« whether you need to make a development application for the proposed development
+ if a development application is required, the relevant IDAS forms you need to complete as part of your application
+ whether you need to give a copy of your application to any referral agencies.
If your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfiguring a lot - DAS checklist 3 or Operational
works - {IDAS checklist 4, as applicable.
if you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning's website at www.dip.qid.gov.au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Part 1 - General questions -
1.1 Have you received a referral agency response in relation to this proposed development Prior to making
an application?
XINo
gyes |’ To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
{] No
* You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
OYes form 2 and give this notice to the relevant local government. If the local government agrees to
your request, details must be provided in Application details - IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?
—xJNo
DL Yes } It is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queensland heritage place under
the Queensiand Heritage Act 1992?
—X] No
Cl Yes | It is recommended that you complete part 3 of this checklist
Department of Infrastructure and Planning [Plan] @W CTE
Government
Page 12
a”
re“
LI i
1.5 Does the proposal involve development on a local heritage place?
[—K] No
DlYes }- It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?
KJ No
It is recommended that you complete part 5 of this checklist
Yes’
1.7 Is any part of the development on strategic port land or airport land (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)
{No
OYes |} It is recommended that you complete part 6 of this checklist
1.8 Is any part of the development on land below a high water mark within the limits of a port under the
Transport Infrastructure Act 1994?
BX] No
CYes |}- It is recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
[XJ] No .
L]Yes : | It is recommended that you complete part 8 of this checklist
1.10 Does the proposal involve the establishment or expansion of a waste water disposal system?
{XJNo
C0 Yes }- It is recommended that you complete part 9 of this checklist
1.11 Is the development on fand that adjoins a declared fish habitat area under the Fisheries Act 1994?
KINo . : 7
( Yes It is recommended that you complete part 10 of this checklist
Privacy - please refer to your assessment manager for further details on the use of information recorded in.
' this checklist.
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided’on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims alll liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this
checklist.
Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009
Page 13
ae oo | COLL OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Development application assessment checklist - IDAS checklist 1 Version 1.0 18 December 2009
Page 14
Sunshine Coast LAND USE SECTION FEES Regional Council : CIVICA TYPE RECEIPT TYPE SALE OF DOCUMENTS : Superseded Planning Scheme Documentation : 520 Copy of Permit/Approval Letter 410 The Noosa Plan Documentation _ 111 APPLICATION FEES _ Material Change of Use - Code/Impact MCU Consistent ~ . §21 Inconsistent : 521 Assessment under Superseded Planning Scheme : 521 - ‘ Modification to a Development Permit MOD DP . 521 . @ Extension of a Currency Period : 521 Lot Reconfiguration RECONFIG 521 Bldg Work assessable against the Planning Scheme : 521 PRE.LODGEMENT REVIEW / Half Hour §22 One Hour * . , : §22 ADVERTISING , ‘ + Purchase Advertised Applications §23 JETTIES : ” Jetty Application Fee G20 524 - . Jetty Bond . . ‘ Sao st . (Category 4) BONDS _ . . Performance Bond . 51 (Category 9) Oo FEE | 7 Search of Land Use Section file 112 Liquor Licensing Request 113 TOTAL $ i4vZo NAME: Pout bo Tanyer 7 7 ADDRESS: Uns. 8 ey, pawos ‘ . : 3- 2. TMhoaean Ste AO 0 Savi FILE NO: (o[-tb0 DATE: | Pte /sTew RECEIPTNO: 26 SOLS _— signature of TP Officer: 7D Tome + AUTHORITYNO: ; lg] 2o10/ 70/1
Page 15
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 > FEE CALCULATION 4 OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES “7
Page 16
TLLLO008 20 XBS LELLO008 LD Aid
9007 © uene;
90208 Od / SnueKy susDURY
SEBid WINE, OL GS
esceuiug uBeeg 9x5 /uenRg
229 €9% O10 NOV
seyejoossy 2
£
W/L GL1 Ald
SUSLVM WSOON|
LYNOD SGISUSLYM
(ELON)
L68 107
ALLa? G3SOd0uNd
7
LNOAVT
ONINVYS
L $310d OMH
CGALVSUL NIN 002 ©
‘Sad
HLM SY¥sYv32¢d OL
O3X14 GMH #4 SZ x BE
“ONDIOSO
Srigvs FWXSLOZO
GSLVIOOSSV GNV ONIHO Ld
3NOLS JO YVSTD 38 OL SAd
AcE
3009 ONMd - 6542 SV HLLIM
ZONVGYOOOV NI CATIV.LSNI 38 TIVHS S3lid TIv
OHV 0° TY
TWM 3Od01L || |
5
auras +
b68 1071 ara 8
\ ie +. fe
mmenmensusincene |
ee
1UNOD 30IsuaivM §
L NOILVAA1S
os [|
‘TIVM 30 dOL
“9 GYVZVH O1 GALVSuL ONY
GOOMOGYWH G3A0Uddv 36 TIVHS Said TV
°SHd
” GHV 990 Ta UALLVM WNAININ
OHV 0b Ty
GHV 0's Ty 030
GHV 002 TY TSAS1 C0014 Ga0uOOsY WNADWN
A EE RE eS
Page 17
SECTION “AS
” Ny,
JETTY USE:
SINGLE USER, PRIVATE
NO VEHICULAR ACCESS
WALKWAY DECK VERTICAL
DESIGN LIVE LOAD - 2.0 kPa
MAXIMUM MOORED VESSEL - 5m
BERTHING VELOCITY - 0.5 m/sec
NOTE THAT ALL POLES TO COMPLY
200 x 78 HD A 2100- PLING
pera (1 \
10 PL ANGLE BRACKET 200 x 75 HWD
216 8 TO EACH MEMBER e
DETAIL ( : 5
2M16 86
8g 180 x 75 HWD
160 x76 HWO
DETAIL ( : 5
NOTES:
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
2. UNLESS NOTED OTHERWISE ALL JON SHALL
COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL - “BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.
3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
THE DRAWINGS.
WATERSIDE COURT
NOOSA WATERS
RABRINK PTY LTD T/A
John Norden
& Associates
ACN 010 263 877
cm
0 = [\.
~
[WORKING DRG
""40/74-2 |
Used in these records
10/0760 - Operational Works - Jetty [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.