Council archive · source document
SUPERSEDED COMPILED Decision Notice [As Published] · 132004.5743.02
Form 6 - Compiled Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2004/5743 Date of Decision: 5 September 2007
1. APPLICANT DETAILS
Name: Dynamic Cafes Pty Ltd
Postal address: PO Box 217
NOOSA HEADS QLD 4567
Phone no: 07 5442 4644 Fax no: 07 5442 4767
2. PROPERTY DESCRIPTION
Street address: 18 Douglas Street, Sunshine Beach
Real property Lots 0, 1, 2 & 3 GTP 615, County of March, Parish of Weyba
description:
3. OWNER DETAILS
Name: Dynamic Cafes Pty Ltd
Postal address: PO Box 217
NOOSA HEADS QLD 4567
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Duplex Dwelling No Yes
6. DECISION DETAILS
Council on 29 November 2006 decided to approve the application and grant a Development Permit, subject to
conditions.
In relation to a request to change the existing approval, Council on 5 September 2007 decided to:
A. Amend Conditions 1, 4.1, 7, 8, 11, 22, 24, 26 and 27
B. Delete Condition 2
C. Include one additional condition
D. Issue a Compiled Decision Notice
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 13
8. SUBMISSIONS
3 properly made submissions were received. See attached list.
9. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All building works
Development Permit for Operational Works Landscaping, Access and/or Carparking, Site Civil Works,
Stormwater Drainage, Frontage Works and Erosion &
Sediment Control
11. RIGHTS OF APPEAL
Rights of appeal in relation to this application are attached.
12. ASSESSMENT MANAGER
Name: Noosa Council Signature: Date: 06/09/07
DECISION NOTICE HISTORY
Original Decision Notice 29 November 2006.
Minor Change to the approval with amendment to
Conditions 1, 4.1, 7, 8, 11, 22, 24, 26 and 27,
additional condition 57 and deletion of Condition
2 on 5 September 2007
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 13
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Land Use
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered Site/Roof Plan Dwg No. 61.04.01B dated 8
August 2006, Changes Application - Plans A (Basement and Level 1) Dwg No. 61.04.52B dated 23
August 2007, Changes Application - Plans B (Level 2 & 3) Dwg No. 61.04.53A dated 22 May 2007,
Changes Application - Sections Dwg No. 61.04.54B dated 23 August 2007, Changes Application -
Elevations Dwg No. 61.04.55B dated 23 August 2007 prepared by Will Franklin Design and as may be
amended by these conditions.
2. Deleted.
3. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. The submitted landscaping plan shall detail the
following:-
4.1. The retainment of mature melaleuca species in the road reserve and the five trees along the site’s
side (north eastern) boundary;
4.2. the provision of dense screening vegetation along the side (eastern and western) property
boundaries of the site in order to screen the basement walls, and entry areas as illustrated on
Level 1 floor plans and provide privacy screening to adjoining properties.
4.3. the provision of dense screening vegetation along the Douglas Lane property boundary and
setback area to screen the swimming pool, basement walls and any fencing.
4.4. the provision of dense screening vegetation along the Douglas Street property boundary and
setback area, particularly between the swimming pool and front property boundary to screen the
swimming pool from the street. Landscaping shall enhance the amenity of the streetscape.
5. Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use.
6. All fencing shall be setback at least 1 metre from the front property boundary (Douglas Street), with at
least half of the fencing setback 2 metres. The area of land between the fence and the front property
boundary shall be densely landscaped to screen any fencing from the street.
7. The swimming pool located in the north western corner of the site shall not project greater than 1 metre
above natural ground level within the front 6 metre setback.
8. Any deck or balcony areas are not be enclosed with shutters, glass panelling or the like, thus remaining
as open structures except where in accordance with the approved plans.
9. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
10. The development shall not exceed a maximum height of 3 storeys and 12 metres above natural and
finished ground level.
11. The natural ground level is to be reinstated around the building.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 13
12. The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA
Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating
and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), with toilets to
comply with the AAAA Water Conservation Rating System. All tap ware and shower roses shall not
exceed a maximum flow of 9 litres per min. Dishwashers and washing machines are excluded from this
requirement.
13. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
with Council during construction and upon completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning Scheme.
14. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be submitted,
to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
operational works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
15. The requirements of this development approval are to be effected, prior to the use of the premises.
Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.
16. The Development Permit for a material change of use of premises lapses if the use has not happened by
29 November 2010, unless an application to extend the currency is approved by Council.
17. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
obtaining a Development Permit for Building Works.
Land Development
Lot Amalgamation
18. All separate, adjoining lots that form part of this application shall be amalgamated into one undivided lot in
accordance with Section 3.7.3 of the Integrated Planning Act and the Plan of Survey submitted for
registration at the Land Titles Office. Proof of title being issued for the amalgamated lot shall be
submitted to Council prior to the issue of the Development Permit for Operational Works.
Vehicle Access
19. A vehicular access driveway to serve the development shall be constructed with a maximum width of 3.0m
from the existing kerb and channel in Douglas Street to the front property boundary and then widen within
the site to the full width of the entrance to the carparking area.
20. The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath
without any level difference. Should any driveways be constructed to grades that do not comply with
AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that
do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
21. All vehicles shall enter and leave the site in a forward direction.
Carparking
22. Carparking shall be provided within the site generally as shown on drawing number 61.04.52B dated 23
August 2007 by Will Franklin Design, except as modified herein.
23. A minimum of 3 covered car park spaces shall be provided on site, including 1 clearly defined visitor car
park spaces.
24. The car parking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user
class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum
head clearance (headroom) at any point of 2.2m. In this regard the proposal plans shall be modified such
that:
i. the double carspaces shall have an overall width of 5.4m in accordance with 2.4.1(b)(ii) of AS/NZS
2890.1-2004 and
ii. the single carspaces shall have clearance to all walls and obstructions in accordance with figure 5.2
of AS/NZS 2890.1-2004 and
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 13
iii. the proposed visitor carspace shall be a minimum of 5.4m x 3.0m and.
iv. The access aisle in the basement carparking area shall have a minimum width of 5.8m.
25. The proposed turning area at the end of the aisle that serves the proposed double carspaces shall be
line-marked with chevrons and have the words “No Parking” painted on the pavement. A sign shall also
be provided to indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.
26. The proposed visitor carspace shown on drawing number 61.04.52B dated 23 Aguust 2007 by Will
Franklin Design shall be dedicated as a visitor car space and shall be signposted “visitor parking” and
shall have similar wording painted onto the pavement to prevent misuse of this space.
27. To ensure that visitors to the site are aware of the on-site visitor parking facilities, a small sign shall be
erected on the front property boundary, adjacent to the driveway, to advise visitors to park on-site in the
designated visitor car park space.
28. All carparking shall be kept, maintained and line-marked in a condition fit for use.
Frontage Works
29. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Douglas Street
frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines.
Grass shall be couch, free of weeds.
30. A new 1.5m wide concrete path shall be constructed along the Douglas Street frontage of the site in
accordance with Council’s design standards and to an alignment that protects any significant vegetation
or any underground services.
31. All paths shall be designed and constructed to ensure pedestrian safety using non-slip materials, to
produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act
1992 and Australian Standard 1428.1 Design for Access & Mobility.
32. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
prior to commencement of the use permitted by this permit.
Stormwater Drainage
33. All stormwater drainage shall be collected on site and discharged so there is no net increase in
stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
to Council’s existing drainage structures in Douglas Lane. Plans of the drainage design shall be prepared
by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a Development
Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street drainage
system at any one location is 25 litres/second.
34. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
storage 3000 litres per dwelling/unit) that is installed to ensure water from the tank can be used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the dwelling/unit. All
rainwater tanks are to be designed and installed in accordance with the Queensland Development Code
(QDC), Part 25 – Rainwater Tanks, and shall be part of the plumbing application in conjunction with the
building approval. The location and capacity of the tanks shall be clearly shown on the plans submitted
for Building Works approval and any overflow shall be directed to the stormwater drainage system.
35. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council’s drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works.
The approved maintenance plan shall be incorporated in the Community Management Scheme for the
development and a copy of this shall be provided for Council’s records prior to commencement of the
approved Use.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 13
A Development Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.
36. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
37. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
38. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
39. Each individual water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
40. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall either
be served by:
40.1. a single Body Corporate water meter to measure the combined/shared Body Corporate and
individual Use flows (including fire hose reels, but excluding fire hydrants and fire sprinkler
systems), or
40.2. multiple water meters to separately measure Body Corporate (if any) and individual Use flows
(including fire hose reels, but excluding fire hydrants and fire sprinkler systems).
41. All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not behind
fences or locked gates. In this regard approval of the water meter configuration and location must be
obtained from Council’s Water & Sewerage Capital Works Manager prior to lodgement and approval of
hydraulic drawings.
Earthworks
42. Earthworks and construction works carried out on site shall not affect the structural integrity of any of the
existing fences or structures or lands that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to
be replaced shall be clearly shown on the plans submitted for Operational Works approval.
43. The use of vibrating installation techniques for sheet piling and any other vibration causing construction
techniques for excavating, earthmoving, demolition or compaction, including vibrating rollers, is not
permitted.
Site Stability
44. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
soil classification, establish whether any measures are required to protect the stability of adjoining
buildings and/or structures and/or land, and make recommendations on the type of foundation system(s)
best suited for the proposed development. The recommendations of this report shall be incorporated into
the design and construction of the proposed development.
Erosion and Sediment Control
45. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
46. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 13
47. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
48. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
49. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
50. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
51. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
52. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
Environmental Health
53. A Waste Management Plan shall be submitted prior to demolition, removal or relocation of the existing
building on- site.
A Waste Management Plan is also required for construction of any building that requires development
approval.
Waste Management Plans are required to be submitted in accordance with Planning Scheme Policy 11,
see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste
materials. These shall be located so that they are convenient and safe to use. (Waste Management Code)
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan drawings
accompanying the application.
A waste management table as indicated below is to be completed showing how waste material is
to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimate On-site Off-site *specify contractor
materials volume *specify re-use or *specify contractor and landfill site
(m³) recycling methods and end user
Excavation material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 13
Asbestos (see
below)
Other - please
specify
Note: If a demolition contractor is undertaking works, then the Waste Management table is to be
completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective
reuse and recycling of such materials. Additionally Council rewards those who segregate waste by
significantly reducing disposal fees at the landfill, some items are free. Higher gate fees are charged for
loads of mixed waste.
54. Noise emission from swimming pool and spa equipment (including heating equipment) shall comply with
the following requirements:
54.1. The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
spot fines) may apply for offences.
54.2. A person must not use equipment on any day if it makes or causes noise to be made –
54.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an affected
building
54.2.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
54.2.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
55. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool pumps etc)
shall comply with the following requirements:
55.1. The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
spot fines) may apply for offences.
55.2. A person must not use equipment on any day if it makes or causes noise to be made –
55.2.1. From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
55.2.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
55.2.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
55.3. Submission of written certification from a suitably qualified person confirming that the noise levels
comply when measured at either the residential boundary or outside the most exposed part of an
affected building, whichever is the closest to the equipment. This is required immediately after
installation of the equipment and prior to any occupation of the building, and in a format approved
by Council. This assessment must take into account noise from any other fixed equipment on the
property e.g. swimming pool pump, heating equipment, that may increase the overall noise level
emitted.
56. Noise from building works associated with residential development shall comply with the following –
56.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
56.2. All reasonable measures are taken to minimise noise emissions.
56.3. Not permitted on Sunday or public holidays.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 13
Land Use Additional Condition
57. The removal of the four existing mature trees along the site’s front (northern) boundary and one existing
mature tree along the site’s western side boundary are to be replaced with native species of 100 Litre pot
size and planted in similar locations on-site
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 13
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
obtaining a Development Permit for Building Works.
2. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
works must be submitted to Council with the lodgement of any application for operational works over the
site.
3. We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the
Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of
disabled facilities, and that access to this building and the provision of sanitary facilities may need to
comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of
Australia.
4. Fencing to the future swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from the
dwelling to the pool enclosure is not permitted.
5. The development should be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting, air-borne
hazards, atmospheric pollutants (including dust or odours) nuisance or any other emissions in accordance
with the nuisance provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No.
12 – Control of Nuisances.
6. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
fines apply for such offences.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 11
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 13
List of Submitters
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Name Address 1 Address 2
RL Chadwick 11 Tormey Street NORTH BALWYN VIC 3104
Patricia Balderstone 13 Toulambi Street NOOSA HEADS QLD 4567
Joy W Thompson Unit 9 Cote D’Azur SUNSHINE BEACH QLD 4567
16 Douglas Street
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 12
NOOSA COUNCIL IDAS Development Application Decision Notice 12 of 13
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to against the part of the approval that represents the
development applications concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(2) The appeal must be started within 20 business (superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day if it were an application under a superseded planning
the decision notice or negotiated decision notice is scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact started at any time after the last day the decision on
assessment and code assessment, appeal rights for the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Page 13
NOOSA COUNCIL IDAS Development Application Decision Notice 13 of 13
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
Used in these records
SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.