47. Digital detailed design drawings and calculations shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
48. To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
available at www.adac.com.au).
49. Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
50. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
51. The transportation of all materials to and from the site shall be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
be covered to prevent materials including dust being windblown from the vehicle.
52. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied and
accepted by Council.
Environmental Health
53. A Waste Management Plan shall be submitted prior to demolition, removal or relocation of the existing
building on- site.
A Waste Management Plan is also required for construction of any building that requires development
approval.
Waste Management Plans are required to be submitted in accordance with Planning Scheme Policy 11,
see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste
materials. These shall be located so that they are convenient and safe to use. (Waste Management Code)
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan drawings
accompanying the application.
A waste management table as indicated below is to be completed showing how waste material is
to be segregated - recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimate On-site Off-site *specify contractor
materials volume *specify re-use or *specify contractor and landfill site
(m³) recycling methods and end user
Excavation material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@8805e436\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED COMPILED Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.