Council archive · source document
Minor Change Existing Approval 132004 5744 13 [As Published] · 132004.5744.13
89. Noise from building works associated with residential development shall comply with the
following –
89.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
89.2. All reasonable measures are taken to minimise noise emissions.
89.3. Not permitted on Sunday or public holidays.
90. A lighting assessment prepared by a professional Lighting Consultant that addresses the
proposed levels of illuminance to the external environment to prevent glare and other light
nuisance to both on site occupants and sites beyond the boundaries, is to be submitted prior
to the issue of the development permit for operational works. The report is to include lighting
for roads, access paths, security, bowling green, swimming pool, and Community Centre and
show compliance with Australian Standards AS-1158 - Lighting for Roads and AS 4282 -
Control of Obtrusive Effects of Outdoor Lighting.
91. All refrigeration plant including motors, should be situated within the building or suitably
provided with noise reduction measures and located as to prevent a noise nuisance in
accordance with the nuisance provisions of the Environmental Protection Regulation 1998.
On the spot fines apply for such offences
92. Liquid waste generated by industry, small business and commercial enterprises is referred
to as Trade Waste and shall comply with the following:
92.1. A Trade Waste Permit shall be obtained prior to the discharge of trade waste to
Council’s sewerage system.
92.2. All trade waste requirements complying with Council’s Trade Waste Policy and
including pre-treatment devices, must be shown on hydraulic plans submitted to
Council for approval prior to issuing the development permit for building work.
92.3. Vehicular access shall be provided to each grease arrestor and/or pre-treatment device
for cleaning and servicing by Council’s contractor, and must allow vehicles to enter and
leave the site in a forward direction. Where access is restricted, a pump out line to an
approved location is required.
92.4. Trade waste requirements must be in place, inspected and approved prior to
commencement of trading or operation.
Bin wash down areas exceeding 600mm square shall be roofed with the floor falling to
a bucket trap waste gully, before entering Councils sewerage system. Council’s Trade
Waste Officer to meet with developer to discuss future uses of the premises.
Additional Conditions – 27 February 2025 – 132004.5744.13
93. The approved “Maintenance Shed” as shown on the Approved Plans, external colours and
finishes must be of muted/environmental tones that blend with the natural environment and
low-reflective roofing and cladding materials.
5. REFERRAL AGENCIES
Not Applicable
6. ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Approval of this development application will trigger an Infrastructure Charge in accordance
with the Coastal Major Road Network Infrastructure Charges Plan for the estimated amount
of $115,109. This amount will subject to variations in the Consumer Price Index, All Groups
Brisbane from June 2005 until the date of payment. An Infrastructure Charge Notice will be
issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
Page 13 of 17
Document Set ID: 23615315
Version: 3, Version Date: 05/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval 132004 5744 13 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 212 KB (small file)
- File type
No other editions are linked here.