SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 8 SEPTEMBER 2020
There were a number of learnings gleaned from each period of operating the evacuation
centre and these learnings are progressively being actioned to ensure we’re even better
prepared for future events.
Completion of a number of planned maintenance projects including:
- Ventilation fan upgrade in the stadium with new, more energy efficient units.
- Electrical switchboard upgrade for safety and compliance purposes.
- Service and repair to rooftop extraction fans and cleaning of extraction fan grilles.
During the facility closure, staff continued to work on improving the centre’s functionality
and aesthetics, with upgrades in the following areas:
- Replacement of damaged ceiling tiles throughout the centre.
- Installation of permanent shelving in group fitness rooms to enable easier and safer
access to equipment for patrons and instructors.
- Cleaning and painting of walls and doors throughout the facility.
- Upgrade of the Kids’ Playroom with the addition of new padded flooring, installation of
a new horizontal climbing wall and pipe-wall, and an upgrade of the popular jumping
castle.
Kids’ Playroom – before upgrade
Kids’ Playroom – after upgrade
Page 25 of 48
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.