Skip to the record
For the highest quality transcripts.

Original source · versioned page text

DA Form 1

of 13

Page text shows just the words. Original shows the document exactly as it was published.

  10.1) For this development, how many lots are being created and what is the intended use of those lots:
  Intended use of lots created               Residential              Commercial              Industrial              Other, please specify:


  Number of lots created
  10.2) Will the subdivision be staged?
  ☐ Yes – provide additional details below
  ☐ No
  How many stages will the works include?
  What stage(s) will this development application
  apply to?

 11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
     parts?
  Intended use of parts created              Residential              Commercial              Industrial              Other, please specify:


  Number of parts created

  12) Boundary realignment
  12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot                                                                Proposed lot
                                                  2
  Lot on plan description               Area (m )                             Lot on plan description              Area (m2)



  12.2) What is the reason for the boundary realignment?



  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)
  Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
  ☐ Road work                                              ☐ Stormwater                           ☐ Water infrastructure
  ☐ Drainage work                                          ☐ Earthworks                           ☐ Sewage infrastructure
  ☐ Landscaping                                            ☐ Signage                              ☐ Clearing vegetation
  ☐ Other – please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
  ☐ Yes – specify number of new lots:
  ☐ No
  14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)




                                                                                                                                              Page 5
                                                                                                           DA Form 1 – Development application details
                                                                                                                     Version 1.3— 28 September 2020
Log in to download the original file

DA Form 1.pdf · 311 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.