Original source · versioned page text
24BRW0157 OWMP Final
Task Assigned Remarks Review service frequency and methodology on 6 monthly intervals with collecting contractor. The service frequency and service methodology should be reviewed to ensure the optimum cost efficiency in services provided and explore options for additional services. Any potential changes to the bin numbers or bin sizes should be made in liaison with the appointed contractor to confirm cost or contract implications. Review of recycling rate target to target continual improvement. Once benchmarked performance has been assessed against the existing targeted recycling rate a new target can be established that strives for continual improvement. Any changes in targeted recycling rates and the achievements of the refuse strategy should be widely communicated to all uses. Update and amend OWMP based on review outcomes. On completion of the refuse strategy review the OWMP should be updated to reflect refuse strategy amendments and to enable implantation of refuse strategy. Site: 5 – 13 Production Street, Noosaville 21 Reference: 24BRW0157
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.