Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

24BRW0157 OWMP Final

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 Task                                                               Assigned   Remarks
 Review service frequency and methodology on 6 monthly
 intervals with collecting contractor.
 The service frequency and service methodology should be
 reviewed to ensure the optimum cost efficiency in services
 provided and explore options for additional services.
 Any potential changes to the bin numbers or bin sizes should
 be made in liaison with the appointed contractor to confirm
 cost or contract implications.
 Review of recycling rate target to target continual
 improvement.
 Once benchmarked performance has been assessed against the
 existing targeted recycling rate a new target can be established
 that strives for continual improvement.
 Any changes in targeted recycling rates and the achievements
 of the refuse strategy should be widely communicated to all
 uses.
 Update and amend OWMP based on review outcomes.
 On completion of the refuse strategy review the OWMP should
 be updated to reflect refuse strategy amendments and to
 enable implantation of refuse strategy.




Site: 5 – 13 Production Street, Noosaville                                               21
Reference: 24BRW0157
Log in to download the original file

24BRW0157 OWMP Final.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.