Original source · versioned page text
24BRW0157 OWMP Final
Rev Description Date
A Preliminary Issue 08/05/24
B Preliminary Issue 09/05/24
C Design Review 01 14/05/24
D Design Review 02 24/05/24
E Design Review 03 30/05/24
1 2 3 4 5 6
10930 4650 6150 6150 6000
2000 214 4010 92 2518 92 1940 214 4500 150 12000 1501200 3600 1200
Washdown bund Bol Bol Bol Bol
C
150
Dp
Dp
2100
Exit
3700
Gate
MSB
A/C
B
214
214
Dp
Wc Wc Wc
10604
Wc
3637
Dp
U Store
F-Wc M-Wc
6026
Meeting
92
V U
Areas
1120
Comms
Entry
V Name Area
18000
Workshop 274.2 m²
Workshop
2350 92
Washbay
15000
V Mv Wc Office 183.1 m²
(bunded area) Washbay 109.8 m²
150
Pwd
Lockers
Dp Exit Sh Alfresco 24.8 m²
Entry 4.0 m²
14600
92
595.9 m²
92
Store
2200
Do not scale drawings. Use written dimensions only
3884
Waiting Dp Contractor to verify all dimensions & levels on site prior
to commencing any work or making any shop drawings
92 1720 92
Exit
Dp
Exit
92
6789
Pit
Lunch call 0411 125 425
email [email protected]
post box 5337 maroochydore qld
4020
Operations qbcc lic. 1070982
3200
abn 33 080 662 473
Office Project
Noosa Bus Depot
1200
Exit Dp
A
Dp
214
214
5-13 Production Street
150
Noosavile, Qld.
92 640 1120 92 2698 214 Title
214 6010 92 4550 214 4500 150
Floor Plan
5000 Ltr
Alfresco Client
Dp
Integral Construction
Issue
3 Preliminary
Dwn North Point
GT
2 4 Floor Pan App
1 Scale 1 : 125 Scale
1 : 125 (at A3)
North
1 Date
30/05/2024 1:15:11 PM
Elevations 0 1 2 3 4 5 6 Dwg No Rev
1:125 1580 - DA02 E
© This drawing is Copyright and is owned by tyson design studio
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.