24BRW0157 OWMP Final

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

1            Introduction
1.1.         Background
TTM Consulting has been engaged by Integral Construction Pty Ltd on behalf of Evolution MIT Services P/L
TTE to prepare an Operational Waste Management Plan (OWMP) to support the proposed transport depot
located at 5 – 13 Production Street, Noosaville. It is understood that development application reference
MCU23/0155 has been conditionally approved by Noosa Council.
This OWMP has been prepared to satisfy the requirement of Development Permit for Material Change of
Use – Transport Depot Condition numbers 17 and 18. It is understood that this OWMP will be submitted to
council for approval.

1.2.         Client Brief and Scope
The proposed development intends to adequately cater for the anticipated refuse generation volumes while
adhering to regulatory requirements. This includes adequate segregation and storage of regulated waste
streams such as used hydraulic oils and other items not suitable for landfill such as tyres.
The content of this OWMP is intended to provide information on the typical movement of waste streams
from generation to collection. Information on each refuse stream expected to be generated is provided.
The items covered within the OWMP are described in Table 1.1.
Table 1.1: Scope Items
 Item                                        Description
 Refuse streams                              Identification of refuse streams & anticipated development refuse volumes likely to be produced
 Refuse separation                           Recommendations for appropriate segregation methods for each refuse stream
 Refuse collections                          Assessment of refuse collection vehicle (RCV) access and manoeuvring
 Refuse storage                              Detailed analysis of refuse storage facilities and design
 Refuse transfer                             Assessment of refuse transfer between refuse storage and collections areas
 Refuse disposal                             Recommendations for refuse disposal within the development
 Refuse management equipment                 Identification of recommended and optional refuse management systems and equipment
                                             Recommendations for operational efficiency and ongoing management, including refuse
 Refuse management operations
                                             minimisation, tenant education and safety
 Building design                             Recommendations for design of refuse management facilities

Detailed information including site plans and drawings, recommended refuse management equipment and
system specifications, common refuse signage as well as a list of terms and abbreviations are provided in the
appendices.
The recommendations in this report relate to the operational phase of the development only. Additional
requirements for refuse management during or after demolition or construction phases are not included and
require a dedicated plan.




Site: 5 – 13 Production Street, Noosaville                                                                                             4
Reference: 24BRW0157
Log in to download the original file

24BRW0157 OWMP Final.pdf · 7.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.