Original source · versioned page text
24BRW0157 OWMP Final
1 Introduction 1.1. Background TTM Consulting has been engaged by Integral Construction Pty Ltd on behalf of Evolution MIT Services P/L TTE to prepare an Operational Waste Management Plan (OWMP) to support the proposed transport depot located at 5 – 13 Production Street, Noosaville. It is understood that development application reference MCU23/0155 has been conditionally approved by Noosa Council. This OWMP has been prepared to satisfy the requirement of Development Permit for Material Change of Use – Transport Depot Condition numbers 17 and 18. It is understood that this OWMP will be submitted to council for approval. 1.2. Client Brief and Scope The proposed development intends to adequately cater for the anticipated refuse generation volumes while adhering to regulatory requirements. This includes adequate segregation and storage of regulated waste streams such as used hydraulic oils and other items not suitable for landfill such as tyres. The content of this OWMP is intended to provide information on the typical movement of waste streams from generation to collection. Information on each refuse stream expected to be generated is provided. The items covered within the OWMP are described in Table 1.1. Table 1.1: Scope Items Item Description Refuse streams Identification of refuse streams & anticipated development refuse volumes likely to be produced Refuse separation Recommendations for appropriate segregation methods for each refuse stream Refuse collections Assessment of refuse collection vehicle (RCV) access and manoeuvring Refuse storage Detailed analysis of refuse storage facilities and design Refuse transfer Assessment of refuse transfer between refuse storage and collections areas Refuse disposal Recommendations for refuse disposal within the development Refuse management equipment Identification of recommended and optional refuse management systems and equipment Recommendations for operational efficiency and ongoing management, including refuse Refuse management operations minimisation, tenant education and safety Building design Recommendations for design of refuse management facilities Detailed information including site plans and drawings, recommended refuse management equipment and system specifications, common refuse signage as well as a list of terms and abbreviations are provided in the appendices. The recommendations in this report relate to the operational phase of the development only. Additional requirements for refuse management during or after demolition or construction phases are not included and require a dedicated plan. Site: 5 – 13 Production Street, Noosaville 4 Reference: 24BRW0157
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.