Council archive · source document
07/0683 - Preliminary Building Approval [As Published] · 172007.683
INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18, For information about prescribed tidal work refer to Guide 24. Ifyou answered “YES" to Q12, the application , tiggers referral to the Port Authority. The Port Authority is a concurrence agency if the development is ~ .® within 200m of a shipping channel or an entry . and exit shipping corridor for the port © within 1000m of a swing basin, a commerciat shipping wharf, a mooring, anchorage or spoil grounds; © within 1000m of a planned port facility - identified in a land use plan approved under the Transport Infrastructure Act 1994. In all other situation the Port Authority is an advice agency. IDAS Assessment Checklist, Version 20, 2 Aprit 2007 Does the application involve development below high water mark’8 and within the limits of a port under the Transport Infrastructure Act 1994? NO 7] YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work ‘Marinas For more information refer to Guide 18. For information about whether a marina is prescribed tidal work refer to Guide 24. The local government is the assessment manager for all prescribed tidal work, “Myou answered “YES" to Q13, the application (higgers referral to Queensland Fire and Rescue Service as'an advice agency. 13. Does the application involve operational work that is tidal work for a marina’ with more than 6 vessel berths? * . NO (1 YES - complete Part M of Form 1, or Part P-of Forrh 1 ifthe tidal work is prescribed tidal work “Tidal works in strategic port land tidal : areas For more information refer to Guide 48. Unless you answered “NO" to ata, the relevant Port Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queensland Transport (QT) “are concusrence agencies for the application. Heritage For further information refer to Guide 19. If you answered “YES" to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered “none of the above" to Q15(b), the application involves referral to the Environmental Protection Agency as an advice agency for the application = 4. 15. Does the application involve tidal works within a strategic port land tidal area20? NO (DYES - complete Part M of Form 1” Does the application involve development in a heritage registered place as defined under the Queensland Heritage Act 1992? - ‘ io. CA YES - complete Part C of Form 1 15(b)The application involves: (tick applicable boxes) a material change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queenstand Hii) - Diii iii Heritage Act 1992; reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. Declared catchment areas - For more information, including a list of the’ dectared catchment areas within Queensland, refer to Guide 13. Unless you answered “none of the above” to Q16, the application requires assessment by the Department of Naturat Resources and Water (NRW), If an agency other than NRW is the assessment manager for the application, NRW is a concurrence agency for the application in elation to this matter. 16. The application is in an area declared to involves: (tick the applicable box/es) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares; development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994: Citi) Citi) Zi iiy none of the above be a catchment area under the Water Act 2000 and . . . 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995. 20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0683 - Preliminary Building Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.