Council archive · source document
07/0683 - Preliminary Building Approval [As Published] · 172007.683
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006
-Land:owner's.consent (applicable) |:20: “Land-owner’s consen ‘to the making of this: application? eT 7E
Section 3.2° (3) of the ‘PA prescribes thatan © .
rapplication must contain, orbe: supported bythe ie Name Signature : Date
0 OR YAN _KAKANSSON,
“Management Act:1995:0r° i. wy
Ay: work on rail corridor land defined under the
: _ Transport. infrastructure Act . 19%, 4
sthe completion Of Parts ‘A'and'8 of th
«must be completed: oral
‘an aplcton Sd osxi the assessment : Plan/ Drawing ! Report Number Title Date
manager, referral agencies and:any.person viewing in
he application during public scrutiny'or public =}, ! (i) SEE ATTACHED SCHEDULE
notification to understand the scope of the proposat
and any potential impact
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide att applicable information required by Part A
and any other relevant part of Form 4.
OFFICE USE ONLY (applicable to assessment manager's}
“REFERENCE: |
; NUMBERIS::”
Notification of Engagement of Private Certifier (Optional forme!)
To
Council. | have been engaged as the private certifier for the building work referred to in this application.
i Date ofengagement / /° Accreditation Number, ___ Name: Signature:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0683 - Preliminary Building Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.