Request for Further Information - 010.2005.00000136.001 [As Published] · 142005.136
Fiona Fullarton, 07 5449 5175
Email: [email protected]
Application Ref: 2005/136
05/0136
5 April 2007
Michael Shane Collins
PO Box 186
PEREGIAN BEACH QLD 4567
Dear Sir,
Re: Application for a Development Permit for 05/0136 Operational Works -
Landscaping, Earthworks, Carparking, Access, Sediment & Erosion Control
situated at 26 Peregian Esplanade, Peregian Beach described as Lot 308 on
P 93112
I refer to the above application for Operational Works and wish to advise that following
preliminary examination of the plans submitted by Dembridge Pty Ltd in February 2007
in response to my letter dated 28 November 2006, the following additional information
is required to be submitted:-
Land Use
1. Amend the Landscape Plans to:-
1.1. ensure a minimum width of landscaping of 1.5 metres between the
proposed gym and the eastern boundary as required by condition 3 of
23440 DA;
1.2. ensure a minimum width of landscaping of 2 metres along the western
boundary as required by condition 4 of 23440 DA;
1.3. denote any existing trees and vegetation on the site and within the road
reserve to be retained as required by condition 8 of 23440 DA;
1.4. substitute Zoysia japonica with native or endemic grasses or ground cover
only;
1.5. remove the reference to hedging the ‘Lilly Pilly’;
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
1.6. provide additional plant species along the entrance driveway at 2 metres
centres as follows:-
1.6.1. Backhousia citriodona;
1.6.2. Elaeocarpus reticulatus;
1.6.3. Syzygium australe;
1.7. Increase the pot size of Acmena smithii from 300mm to 45 litre species;
1.8. Add large shrubs in 200mm pots to be integrated with the Lilly Pillies
(ACMSMI) along the northern boundary (western corner) and southern
boundary at 2 metre centres and along the eastern boundary adjacent to
the swimming pool at 5 metre centres as follows:-
1.8.1. Acmena hemilampra;
1.8.2. Banksia integrifolia;
1.8.3. Elaeocarpus reticulatus;
1.8.4. Petalostigma pubescens.
1.9. Replace the Moreton Bay Ash (CORTES) with species that are compatible
with the sewer near the rear property boundary as follows:-
1.9.1. Acmena hemilampra;
1.9.2. Elaeocarpus reticulatus.
Land Development
2. Please provide plans indicating the stormwater drainage and the location and
type of grease/oil arrestor proposed as required by conditions 19 & 20 of
23440 DA.
3. Please provide plans indicating the location of the possible sewerage easement
as required by condition 25 of 23440 DA.
4. Please provide cross sections across the subject property indicating the depth of
any excavation and the location of the buildings on the adjoining properties.
These sections should also indicate the existing ground levels and proposed
excavation levels, together with and retaining /supporting measures required to
protect the adjoining properties.
Please provide four (4) copies of all information that you are providing. In addition, it
would assist Council if you could also provide an electronic copy of your response.
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Page 3
Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991
Act if the cost of operational works exceeds $80,000, then a portable long service leave
levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is
required to sight the approved form issued by the Building and Construction Industry
(Portable Long Service Leave) Authority that confirms that the requirements of the Act
have been satisfied. This form or a statutory declaration outlining the cost of the
operational works must be submitted to Council prior to issuing of the operational
works approval.
Pursuant to the conditions of the Development Permit for a Material Change of Use
(23440 DA) please note that all bonds and contributions are required to be paid prior to
the issue of the Operational Works approval. The prices are calculated as follows:-
Coastal Major Road Network $ 3,229.00
Coastal Major Pathway Contributions $ 529.00
Headworks
Water Supply $ 9,591.00
Sewerage $12,885.00
(Please note these prices are subject to variations in the Price Index.)
Bond $10,000.00
The above information and payments are required to be submitted, prior to assessment
of the application. If any further matters arise as part of assessment of this application,
you will be advised accordingly.
Should you have any further queries in relation to the above, please do not hesitate to
contact me on the above number.
Yours faithfully,
Fiona Fullarton
SENIOR PLANNING OFFICER
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
Used in these records
Request for Further Information - 010.2005.00000136.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10 KB (small file)
- File type
No other editions are linked here.