Council archive · source document
SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published) · OPW25/0042
10. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system, natural waterways, any downstream stormwater filtration
system or adversely impacting on other properties. The sediment and erosion control design
and measures have NOT been approved, it is the site's Supervising Engineer who is
responsible for ensuring that the sediment and erosion control measures have:
a. Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
practise" methods;
b. Been revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and/or methods;
c. Been revised to address predicted rainfall events; and
d. Achieve the desired environmental outcomes.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
11. An updated Construction/Traffic Management Plan and Traffic Guidance Scheme must be
submitted to Council for agreement prior to the pre-start meeting and must specifically
address the following:
a. All recommendations identified in the Road Safety Audit (included in reference
documents).
b. Methods for addressing traffic impacts identified in the Traffic Impact Assessment
(included in reference documents) and including:
i. Demonstrating how the project will ensure haulage does not exceed 75 inbound
or 75 outbound trucks per day, and no more than 10 trucks in / 10 trucks out per
hour.
ii. How truck movements will be monitored and verified (e.g. through delivery
dockets, traffic counters, or similar).
c. A Dilapidation Report for the haulage route commencing from the Serenity Close cul-
de-sac and concluding at the Reef – Eenie Creek roundabout (inclusive). The report
must include:
i. a video inspection of the defined route; and
ii. an itemised list of each existing defect.
d. Construction/Traffic Management during all aspects of the construct phase including:
i. A Parking Management Plan for construction workers
ii. A waste collection/haulage conflict management plan prepared in collaboration
with Noosa Council’s Waste Team identifying waste collection times and haulage
schedules designed to avoid traffic conflicts.
iii. A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
Control Devices (MUTCD) detailing all temporary signage and traffic control
measures prior to construction.
iv. Restricting on-street car parking to facilitate safe turning widths for HV’s.
v. Maintenance of safe vehicle and pedestrian access across the frontage of the
site both during daily construction and after daily construction has ceased.
vi. Proposed fencing to the site during the construction phase of the development.
e. Maintenance and protection of water quality and existing drainage lines through the
construction site through the implementation of appropriate erosion and sediment
control measures.
Page 5 of 16
Document Set ID: 24143123
Version: 4, Version Date: 26/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice OPW25 0042 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 202 KB (small file)
- File type
No other editions are linked here.