HRP17305.L01.001 Irr
Attached to the e-mail 132002.220285.5 - Information Request Response - 28 Eenie Creek Road, Noosaville.
Original PDF page 23, section 1. The text section number identifies this passage in the reader.
Stormwater Management Plan
Noosa Civic Car Wash
Table 7-1 Specific outcomes, acceptable solutions and probable solutions for the Water Sensitive Design Code (Table 14-61)2
Column 1 Column 2
Specific Outcomes Probable solutions (if code assessable)
Maintenance of environmental values and water S1.1 Development meets the applicable performance
quality objectives outcomes of the State Planning Policy Appendix 2 SPP Code:
O1 Downstream ecosystems, properties and Water Quality; AND S1.2 Design and construction methods for
infrastructure are not adversely impacted by either stormwater quality treatment assets are in accordance with
changes to flow, water quality or ecosystem health Healthy Waterways Water
caused by development. By Design Guidelines;
AND
S1.3 Commitments are made to implement a cost effective
maintenance strategy for the life cycle of any engineered
water quality treatment device;
AND
S1.4 Water quality nutrient load modelling is undertaken in
accordance with Water by Design Music Modelling Guidelines
to demonstrate compliance with the SPP nutrient reduction
requirements;
AND
S1.5 Stormwater outlets that directly discharge to naturally
acidic environments are managed to prevent eutrophication;
AND
S1.6 Suitable methods are incorporated to prevent the spread
of invasive environmental weed species at stormwater outlets.
Water demand
O2 Urban development reduces the need for mains S2.1 Captured water is plumbed to be available for all external
water by capturing and utilising run-off from uses including gardening, irrigation, ponds and outdoor
appropriate areas on site. cleaning.
O3 Urban development reduces the need for mains S3.1 Planting is in accordance with PSP 3 Landscaping Plans
water by eliminating requirement for irrigation via the and Guidelines.
use the endemic plant landscaping design.
O4 Backflow devices or similar systems are installed, S4.1 A suitable backflow prevention device is installed to
where necessary, to ensure water reuse facilities have protect the drinking water within the reticulated water supply
no impact on the quality of the town mains water. in accordance with AS/NZS 3500:2003 Plumbing and
Drainage.
Shire Business Centre No probable solution
O5 Within the Shire Business Centre site, as shown on
Map SBC run-off treatment is contained within the
developable areas of the site and drainage lines are
only used for final polishing of run-off;
AND
O6 Within the Shire Business Centre site, as shown on
Map SBC, on-site detention measures are contained
within the developable areas of the site, clear of
drainage lines and Open Space Precincts.
2
(Noosa Shire Council, 2017)
HRP17305 | 27 February 2018 | Commercial in Confidence 11