                                                                                                                                                                                                                                                                                               1 - GENERAL NOTES
 Standard Heavy DutyAbove ground 23,000L Water Tank                          Standard Heavy Duty In ground 23,000L Water Tank                                                                                                                                                                  1.1 - These drawings shall be read in conjuction with all other consultant
 •   1 x 500mm QLD Approved strainer                                         •   1 x 480mm Access with concrete access cover                                                                                                                                                                   drawings and specifications. Any discrepancies shall be referred to the architect
 •   1 x 100mm Overflow @ top of wall                                        •   1 x 100mm Overflow @ top of wall                                                                                                                                                                              or project manager for a decision before proceeding with the work.
 •   1 x 32mm female Brass @ base of wall                                    •   2 x 100mm Inlet @ top of wall                                                                                                                                                                                 Any decision that inputs on Engineering Design shall be referred to the Engineer
                                                                             •   1 x 32mm female Brass @ top of wall
                                                                                                                                                                                                                                                                                               for confirmation of design integrity.
                             55 top of wall
                                                                                                                                                                                                                                                                                               1.2 - Dimensions SHALL NOT be obtained by scaling off the drawings.
     75




           lid thickness
                                           manhole
                                                     2 x 100mm Inlet           100mm overflow                                                                                                                                                                                                  1.3 - All dimensions shall be checked by Builder prior to commencement of
                                                     1 x 32mm Brass                                                                                                                                                                                                                            works.

                                                                                                                                                                                                                                                                                               1.4 - Tank Design for exclusive use by Allcast Precast only.

                                                                                                                                                                                                                                                                                               1.5 - Engineering Certification by HR Design. Form is available at time of




                                                                                                                   2800 overall height


                                                                                                                                         2530 overflow height
                                                                        Reinforced with                                                                                                                                                                                                        purchase.
                                                                        TM484265R mesh

                                                                                                                                                                                                                                                                                               2 - LOADINGS
                                                                                                                                                                                                                                                                                               2.1 - The structural work as shown in these drawings has been designed for the following cases:
                                                40 MPa high density concrete                                                                                                                                                                                                                      (i) a lid load of 500kg.
    600 x 600 N12
                                                10mm aggregate
    corners bars @
    600 cnrs

                                                SL82 mesh to floor                                                                                                                                                                                                                             3 - FOUNDATIONS
     125




           floor thickness
                                                                                                                                                                                                                                                                                               3.1 - Foundation material preparation to be in accordance with consulting civil
                                                                                                      Refer Bouyancy control
                                  4m x 4m leveled site with 75mm of 5-10mm scredded gravel               joint detail below                                                                                                                                                                    engineer deign and specifications.
                             100 top of taper
                                                                                                                                                                                                                                                       4 x 2.5 Tonne swift lift anchors at
                               150 at base
                                                                                                                                                                                                                                                      base of external wall.                   3.2 - Tank backfill material to be free draining and placed in accordance with
                                                                                                                                                                                                                                                      3.5m spreader bar required for lifting   Allcast Precast backfill specifications.

                                                                                                                                                                                                                                                                                               3.3 - Where suitable foundation bearing capacity is not achieved, contact HR
                   TANK DESIGN                                                                                                                                                                                                                                                                 Design Engineers for alternative design solution.
                    1 : 50
                                                                                                                                                                                                                                                                                               4 - REINFORCED CONCRETE
                                                                                                                                                                                                                                                                                               4.1 - All work shall be in accordance with all current Australian Standards as
                                                                                                        SL62 central layer                                                                                                                                                                     a MINIMUM work standard.
                                                                                                        Trimmed to suit manhole
                                                                        90




                                                                                                                                                                                                                                                                                               4.2 - Concrete shall have a characteristic compressive strength after 28
                             75




                                                                                                                                                                                                                                                                                               days of not less than : 40 MPa.
                                                                3480 Diameter

                                                                                                                                                                                                                                                                                               4.3 - All concrete shall be mechanically vibrated. Vibrator shall not be used
                                                                                                                                                                                                                                                                                               to spread concrete.

                                                                                                                                                                       Allcast Precast Water Tank                                                                                              4.4 - All reinforcement shall be supported on plastic chairs, generally at not
                                                                                                                                                                                                                                                                                               greater than 800mm centres in both directions. Bars shall be tied at
                                                                                                                                                                                                                                                                                               alternate intersections.
                                                                                                                                                                                                                                                                      For Concrete
                                                                                                                                                                                                                                                                      volumes speak to
                                                                                                                                                                                                                                                                      Allcast Precast
                                                                                                                                                                                                                                                                                               4.5 - Concrete to have a maximum aggregate size of 10mm and
                                                                                                                                                                                                                                                                      Engineer                 water/cement ratio of not greater than 0.65.
R10 links around edge                                                                                                                                                                                                                                                                          The maximum permissible transport time for concrete between batching
top and bottom                                                                                                                                                                                                                                                                                 and placement on site shall be in accordance with the following table.

                                                                                                                                                                                                                                                                                                        AMBIENT AIR              MAX. BATCHING TO PLACEMENT
                                                                                                                                                                                                                                                                                                       TEMPERATURE                              TIME
                                                                                                                                                                                                                                                                                                          10°-24°C                          120 minutes
                                                                                                                                                                75mm 5-10mm                                                                                                                               25°-27°C                           90 minutes
                                                                                                                                                                gravel bed                                                                                                                                28°-30°C                           60 minutes
                                                                                                                                                                                                                                                                      N12 bar, chem-set                   31°-33°C                           45 minutes
                                                                                                                                                                                                                                                                      into 12mm hole                      34°-36°C                           30 minutes
                                                                                                                                                                                                                                                                      drilled as shown                     37°C+                  No placement of concrete unless
                                                                                                                              3 x 1.3 Tonne                                                                                                                                                                                          chilled water or ice in mix
                                                                                                                              swift lift anchors

                                                                                                                                                                                                                                                                                               4.6 - All reinforcement shall be supplied by a registered manufacturer with an
                                                                                                                                                                                Anti-flotation control only required for Tanks in high water table areas or Pump out tanks
                                                                                                                                                                                                                                                                                               approved and certifier quality assurance program in place. All reinforcement is
                                                                                                                                                                                                                                                                                               to comply with the requirements of AS 1302, AS 1303 and AS 1304 as
                                                                                                                                                                                                                                                                                               applicable.

                                                                                                                                                                                                                                                                                               4.7 - All reinforcement is to be placed free from oil, grease or other surface
                   LID DESIGN                                                                                                                                                 BOUYANCY CONTROL JOINT                                                                                           coatings which may impair bond to concrete.
                    1 : 50                                                                                                                                                    1 : 10                                                                                                           4.8 - All reinforcement to be 500 MPa minimum yield unless noted otherwise.

                                                                                                                                                                                                                                                                                               4.9 - Reinforcement shall not be welded without written approval from the
                                                                                                                                                                                                                                                                                               Engineer.




                                                                PHONE            :: (07) 5442 2522
                                                                                                                                                                                                                                                                                                                             HD23,000 LITRE WATER TANK
                                                                FAX              :: (07) 5442 2479
                                                                                                                                                                                                                                                                                                                                                 TOTAL WEIGHT - 9.8 T
                                                                POST             :: PO Box 100, Woombye Q 4559

                                                                FACTORY          :: 40 Hill St, Woombye Q 4559
                                                                                                                                                                                                                                                                                                                                       GENERAL ARRANGEMENT SHOWN
                                                                WEB              :: www.allcastprecast.com.au                                                                                                                                                                                                                           CUSTOM FITTINGS BY REQUEST

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

15104 - SBSMP - Rev 0.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.