4 EXISTING STORMWATER DRAINAGE SYSTEM
4.1 Existing Infrastructure
Data obtained from Dial Before you Dig (DBYD) and the detailed survey plan indicates the
following existing drainage infrastructure:
1. Catchment pit, manhole and stormwater pipe located approximately 60m south east of
the site.
Refer to Figure 4.1 for an existing stormwater drainage schematic, Appendix A for the detailed
survey and Appendix C DBYD data.
N
The Site
Stormwater Manhole
Legend
Flow Path:
Figure 4.1 – Stormwater Drainage Schematic
Site Based Stormwater Management Plan
Residential Development at 43 Elanda Street, Sunshine Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
15104 - SBSMP - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.