Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

12. APP G. Stormwater Management Plan

Attached to the e-mail MCU14/0102 Development application Part 3 of 4 App G Stormwater Management Plan.

of 62

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                EXISTING TOPOGRAPHY AND STORMWATER
                INFRASTRUCTURE
                Skyline Surveyor’s survey indicates that the site has a moderate grade (approximately 3%),
                ranging from approximately RL10.57 in the site’s southwest corner to RL7.54 in the site’s north-
                east corner. The site generally grades in a north eastern direction.
                There is a ridgeline located along the boundary of the two lots proposed for development. This
                has occurred because the site on Lot 4SP159610 has been excavated below natural surface in
                the southern area of the site, and as a result there are extensive retaining walls around
                southern boundary. The construction of Walter Hay Drive on the site’s northern boundary has
                caused a trapped sag to occur which has led to the installation of piped drainage discharge to
                the site’s east.


                DRAINAGE EASEMENTS
                There are two existing drainage easements on the site. One runs along the northern section of
                Lot 31SP170751 and another in the south – western corner of the same lot. In the developed
                state, these easements will be dissolved.




139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289                                                                     3
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-03.-smp.docx
Log in to download the original file

12. APP G. Stormwater Management Plan.pdf · 6.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.