12. APP G. Stormwater Management Plan
Attached to the e-mail MCU14/0102 Development application Part 3 of 4 App G Stormwater Management Plan.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EXECUTIVE SUMMARY
Hyder Consulting has been engaged by Empirica Developments Pty Ltd to prepare a Site
Based Stormwater Management Plan (SBSMP) for the proposed service station and industrial
retail development located at 139 Eumundi Noosa Road and 30 Lionel Donovan Drive,
Noosaville. This development will comprise the construction of a service station dining/
entertainment retailer, and industrial retailers on site. This Stormwater Management Plan has
been prepared in accordance with the Water Sensitive Urban Design requirements of Council,
the Queensland State Planning Policy, the Queensland Development Code, and the
Environmental Protection (Water) Policy (1997).
The three primary objectives of this SBSMP are to ensure that:
1. Suitable measures are incorporated in the development to ensure that there are no adverse
impacts to downstream receiving waterways, property or infrastructure resulting from any
increase to peak discharging stormwater flow rates.
2. Investigate any potential flood issues affecting the site and set appropriate finished levels
for the proposed development to ensure adequate flood immunity is achieved.
3. Details of a proposed stormwater quality treatment train are provided to ensure the
discharge of stormwater from the site is of adequate quality standards to comply with the
Water Sensitive Urban Design (WSUD) requirements of Noosa Council, the State Planning
Policy and the South-East Queensland Healthy Waterways Partnership.
The aim of this report is to address all the relevant issues by providing stormwater quantity and
stormwater quality information to support the development application.
139 Eumundi Noosa Road & 30 Lionel Donovan Drive, Noosaville Service Station and Retail Site—Stormwater
Management Plans
Hyder Consulting Pty Ltd-ABN 76 104 485 289 1
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-03.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.