Page 2
Page 3
IJ1R1►71 t7^^
INFRASTRUCTURE
7 February 2011 & ENVIRONMENT
Level 12
501 Swanston Street
Melbourne Victoria
Australia 3000
Sunshine Coast Council
Locked Bag 72 www.meinhardtgroup.com
Sunshine Coast Mail Centre Tel: 61 (03) 8676 1200
QLD 4560 Fax, 61 (03) 8676 1201
Dear Sir/Madam,
Development Application for one (x1) replacement site identification sign at existing Service
Station
49 David Low Way, Noosa Heads QLD 4567
We advise that we act on behalf of The Shell Company of Australia Ltd with respect to this matter.
As part of a Shell roll out project Australia wide, please find enclosed a Development Application for
the replacement of one (x1) site identification sign, which shall be situated in the same location as the
existing sign. No further on-site changes are proposed.
The dimensions of the proposed signage are larger than the existing sign and the lighting will be
changed to more energy efficient LED's. There will be no detrimental impact on the amenity of the
surrounding properties from this proposal.
This Licence Application includes:
• Completed application form.
• Cheque for application fee of $1,392.00.
• Letter confirming consent from GE & RL Evans 16th December 2010.
• Structural Design Documentation and Certification by Vistek, dated 1St December 2007.
• Three (3) copies of A3 proposed site plans (DA01 B) detailing the existing and proposed
signage dimensions, illumination levels and locations.
We look forward to Council's favourable consideration of this application. Should you have any
queries, please do not hesitate to contact me on (03) 8676 1324.
Yours faithfully,
Meinhardt Infrastructure & Environment Pty Ltd
Laura Murray
Senior Planner
105465 - noose - cover letter 07.02.11.doc
Melnhardt Infrastructure & Environment Pty Ltd AGN 52 too eee are
Australia China Hong Kong India Indonesia Malaysia Pakistan Philippines Singapore Thailand United Kingdom U.S.A. Vietnam
Page 4
ENE Integrated Development Assessment System form
Application details I DAS form "1 v`"'c) ,'rer counter
(Sustainable P/anningAct 2009 version i.o effective 18 December 2009) 1 10 FEB 2011
You MUST complete ALL questions unless the form indicates otherwise. Incomplete formsqr^fqi ",^vt all necessary
information and documentation will result in your application not being a property made-a
For all development applications, you must:
• complete this form (Application details-IDAS form i)
• complete any other forms relevant to your application
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct2009 or the Sustainable Planning
Regulation 2009.
This form can also be completed online using Smart eDA at www.smarteda.gld.gov.au
Applicant details (note: the applicant is the person responsible for making the application and need not be the owner of
the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct. Any
development permit or preliminary approval that may be issued as a consequence of this application will be issued to the
applicant.)
-TT-\ S 1Et^ C.o l\c4 tic= #^-v ^^R-F^L^ LTfl
Name/s (individual or company name In full)
For companies, contact name L iI. X-(\ N) WZSZ_N-l
Postal address 1^ ^ 1 e " _ k- z- S o \ ^'w e i- -O STREW
DEL . ^uP t^su 'J C- 3000
Contact phone number (o-? ^b^ b 1324
Mobile number (non-mandatory)
Fax number (non-mandatory) Co3^ %-+to tZ,O
e-mail address (non-mandatory) ,.c ck . l^Av,c-z^^
cd
\Q c-a Ct^ c7 iA ^ . C ^^^
Department of Infrastructure and Planning Qplan k Queensland
Government
Page 5
i. What is the nature of development proposed? (tick all applicable box/es)
F1 material change of use of premises
q building work
EYoperational work
D reconfiguring a lot
2. What type of approval is being sought?
Ea development permit preliminary approval both-provide details below
q q
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
No
Yes-complete table A and then go to question 5
Table A-name of each local government area in which the mobile and temporary ERA is proposed to operate
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B-street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises
street address/lot on the plan
street address/lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
water e.g. jetty, pontoon)
Street address Lot on plan description Local government area
(e.g. Logan, Cairns)
Unit Street Street name and official suburb/ Post- Lot no. Plan type
no. no. locality name code and plan no.
tkc^ AA`.; A_,) L-o. `^+4ti i}Sb^ ^3 9-'k' 4^ Sv SN" aE C^
t_ko.O`- 'ADS
;Mir afinn delaik-WAS form 1
Version r. o 18 December 2009
Page 6
qoq
Table C-premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g. channel
dredging in Moreton Bay)
Coordinates Zone Datum Local government
(note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
El GDA94
q WGS84
F] other
5. Total area of the premises on which the development is proposed (indicate hectares or m2)
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
\r^1ST l-^^^ ON c c - (xl^ Lf\C^N -. STS t^^-NT CCI\--t'0*^l
Ca%--A
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
El No
Yes-complete either table D, table E or table F as applicable
Table D
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
3 Application details-/DAS form i
Version r. o r8 December 2009
Page 7
IJLJLJ
Table E
Name of owner/s of the land
^E e RL ^E-=V AS S
The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
q By making this application, I, the applicant, declare that the owner has given written consent to the making of the
application.
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry materials.
Refer to the notes at the end of this form for more information)
No Yes-complete table G
Table G-state owned resources (provide details for each state resource in a separate table)
Nature of state-owned resource
Nature of evidence required (tick the
applicable box and attach a copy of the q Evidence of an allocation of, or an entitlement to, the resource
evidence to this form)
q Evidence the chief executive of the department administering the
resource is satisfied the development is consistent with an allocation
of, or an entitlement to, the resource
q Evidence the chief executive of the department administering the
resource is satisfied the development application may proceed in the
absence of an allocation of, or an entitlement to, the resource
to. Identify if any of the following apply to the premises (tick applicable box/es)
q adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete table H
t j IJ on strategic port land under the Transport Infrastructure Act 2994-complete table I
in a tidal water area-complete table J
q
Table H I Name of water body, watercourse or aquifer
4 Appli<.Nion detail.-IDASform r
Version 1. o i8 December 2009
Page 8
00q
Table I Lot on plan description for strategic port land Port authority for the lot
Table J Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
ii. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water, etc.)
Yes-ensure the type, location and dimension of each easement is included in the plans submitted
VK No
12. Does the proposal include new building work or operational work on the premises? (including any services)
I
13. Is the payment of a portable long service leave levy applicable to this application? (refer to notes at the end of this
form for more information)
No-go to question 15 F] Yes
14. Has the portable long service leave levy been paid? (refer to notes at the end of this form for more information)
No
Yes-complete table K and submit with this application the yellow local government/private certifier's copy of the
receipted QLeave form
Table K Amount paid Date paid QLeave Project Number (6 digit number starting with A, B,
E,LorP)
15. Has the local government agreed to apply a superseded planning scheme to this application under section 96 of
the Sustainable PlanningAct 2009?
No
Yes-please provide details below
q
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
5 Application details -IDAS form i
Version i. o r8 December 2009
Page 9
iu"
16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
does not apply for applications made on-line using Smart eDA)
Description of attachment or title of attachment Method of lodgement to
assessment manager
C^;„- iC4 o(^ OS ^Pt^.r^`x ^RL ? ^,c , SSE ^v' ^s 1\c SIN
^)E(Z^^;cf^^Or^ ^ c rtt ac o S vc^-'J ! \L ^,
17. Applicant's declaration
'By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
provide false or misleading information).
Notes for completing this form
Question 8:
• Section 263 of the Sustainable PlanningAct 2009 sets out when the consent of the owner of the land is required for an
application. Section 26o(i)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is required
under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
include a declaration by the applicant that the owner has given written consent to the making of the application.
• Owner's consent is not required for a mobile and temporary ERA.
Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
given, and the evidence required, to support the application.
Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qld.gov.au. For further
information contact QLeave on 1800 803 481 or www.qleave.qld.gov.au.
4pplic,aiTorn de!a / -IDAS form i
Version i.o 28 December 2009
Page 10
L__JL!L i
Privacy-the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a purpose
outside of the IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required
by Parliament. This information may be stored in a departmental database. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received to -2-k^ Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. I have been engaged as the private certifier for the building work referred
to in this application
Building
Date of engagement Name BSA Certification license number
classification/s
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
Date receipted
QLeave Project Amount paid form sighted by Name of officer who
Description of the work Date paid
Number ($) assessment sighted the form
manager
The Sustainable PlanningAct2oo9(SPA) is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.
7 Application details-IDAS form t
Version 1. o i8 December 2009
Page 11
MEN Integrated Development Assessment System form
Building or operational work a SAS'A'A Ap'.eiag*V
a planning scheme-IDAS form 6 "10 FEB 2011
(Sustainable PlanningAct200R version i.o effective i8 December 2009)
::fit I ii^t UP
This form must be completed for development applications for building works or operational work- assessabteagairrsta-
planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all necessary
information and documentation will result in your application not being a properly made application.
For all development applications, you must:
• complete Application details-IDASform 1
• complete any other forms relevant to your application
• provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable PlanningAct2009 or the Sustainable Planning
Regulation 2009.
This form can also be used for development on strategic port land under the Transport Infrastructure Act 1994.
This form can also be completed online using Smart eDA at www.smarteda.qld.gov.au
i. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)
building work-complete table A Lam" operational work-complete table B
q
Table A
What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering,
underpinning, moving or demolishing a building)?
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit preliminary approval
q q
Are there any current approvals associated with this application? (e.g. material change of use)
List of approval reference/s Date approved Date approval lapses
Department of Infrastructure and Planning Qplan kl Queensland
Government
Page 12
Table B
What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)
road works stormwater water infrastructure
q q q
drainage works earthworks sewerage infrastructure
q q q
q
landscaping signage
LI
other-provide details
q
What type of approval is being sought? (if you have indicated multiple works in the above question, please use an
attachment to this form to detail each approval request)
development permit preliminary approval both-specify below
q q
Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
a No Yes-specify the number of lots being created
q
Are there any current approvals associated with this application? (e.g. material change of use)
No 71 Yes-provide details below
List of approval reference/s Date approved Date approval lapses
2. What is the dollar value of the proposed building work? (inc GST, materials and labour)
3. Confirm that the following mandatory supporting information accompanies this application
Confirmation of Method of
lodgement lodgement
All applications for operational works
site plans drawn to scale which show the following: qconfirmed .m rAN-A.---
• the location and site area of the land to which the application relates
(relevant tang)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is required
for all lots)
V.ar;;ing sih.eme-IDASform 6
Version i. o r8 December 2009
Page 13
• any existing or proposed easements on the relevant land and their function
• any access limitation strips
• all existing and proposed roads and access points on the relevant land
a statement about how the proposed development addresses the local confirmed
government's planning schemes and any other planning documents relevant to
the application
Applications for operational works involving earthworks (filling and excavatin g) N^h
drawings showing:
0 confirmed
• existing and proposed contours
• areas to be cut and filled
• the location and level of any permanent survey marks or reference stations
used as datum for the works
• the location of any proposed retaining walls on the relevant land and their
height
• the defined flood level (if applicable)
• the defined fill level (if applicable)
Applications for operational works involving roadworks mil
drawings showing: confirmed
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets if the
construction line is not the centreline of the road and all intersection points
• information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and tangent
point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other street
furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material
r planning scheme-IDAS form 6
Version i. o 18 December 2009
Page 14
drawings showing:
q confirmed
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and easements
• manhole location, chainage and offset or co-ordinates and inlet and outlet
invert levels
• inlet pit locations, chainage and offset or co-ordinates and invert and kerb
levels
Applications for operational works involving water reticulation
drawings showing: confirmed
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
reticulation works
• pipe diameter, type of pipe and pipe alignment
• water main alignments
• water supply pump station details (if applicable)
• minor reservoir details (if applicable)
• conduits
• location of valves and fire hydrants
• location of house connections (if applicable)
• location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation h1 i
drawings showing:
confirmed
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting
drawings showing:
FIconfirmed
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
• any traffic calming devices
• additional plans for roundabouts and major roads (if applicable)
• details of any variations to normal alignment
• details of lighting levels
Manning scheme-/DAS form 6
Version i. o18 December 2009
Page 15
Iuu
Applications for operational works involving public utility services rAA
drawings showing:
confirmed
• any existing light poles and power poles
• any existing underground services
• details of proposed services
• alternation to existing services
Applications for operational works involving landscaping works
drawings showing:
q confirmed
• the location of proposed plant species
• a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
• planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details
Notes for completing this form:
• This form can also be used for development applications for building works or operational works assessable against
the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is mentioned, take it to
mean the land use plan for the airport land.
Privacy-please refer to your assessment manager for further details on the use of information recorded in this
form.
OFFICE USE ONLY
Date received
10.2-k Reference numbers
Opw o o0
The Sustainable PlanningAct2009 is administered by the Department of Infrastructure and Planning. This form and all other
required application materials should be sent to your assessment manager and any referral agencies.
ist a planning . cheme-IDAS form 6
Version r. o r8 December 2009
Page 16
••• Integrated Development Assessment System checklist
Operational work-IDAS checklilsV4VetoPment Counter
(Sustainable Planning Act 2oo9, version to i8 December 2009)
10 FEB 2011
This checklist only applies when the development application seeks approval for operational woarksmbou!-
You should complete all questions unless the checklist indicates otherwise. ----d
All planning and development applications require applicants to complete the following:
• Applicant details-IDAS form r
• any forms or mandatory supporting information identified as forming part of your application.
If you are unsure of any answers to questions, phone or visit your local government, or go to the Department of
Infrastructure and Planning's website, www.dip.qld.gov.au.
The checklist and relevant sections do not need to be completed for applications relating only to building work requiring
assessment against the BuildingAct 1975.
This checklist can also be completed online using Smart eDA at www.smarteda.qld.gov.au
Part i-General questions
i.t Is the proposed operational work assessable under the planning scheme?
0 No
• You must complete Building or operational work assessable against a planning scherne-IDAS form 6
12/ Yes
• Continue on to question 1.3
1.2 Is the proposed operational work assessable under any state planning regulatory provisions?
No • Go to question 1.9
Yes • Go to question 1.4
1.3. Is any part of the premises located in part of a future state-controlled road or within ioo metres of a state-
controlled road?
D/N o • It is recommended that you complete part 2 (starting from question 2.1) of this checklist
El Yes • It is recommended that you complete part 2 (starting from question 2.2) of this checklist
Department of Infrastructure and Planning Qplan Queensland
^`^Qovernment
Page 17
J ul
1.4 Does State Planning Policy 2/o2: Planning and Managing Development InvolvingAcld Sulfate Soils apply to the
development?
No
Yes • It is recommended that you complete part 3 of this checklist
q
1.5 Is there any proposed operational work for filling or excavation?
No • It is recommended that you complete part 4 (starting from question 4.5) of this checklist
Yes • It is recommended that you complete part 4 (starting from question 4.1) of this checklist
i.6 Is any of the proposed operational work listed in schedule 12 of the Sustainable Planning Regulation 2009 and
does it exceed the specified threshold?
zNo
Yes • This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 14
i.7 Is any of the proposed operational work listed in schedule 13 of the Sustainable Planning Regulation 2009 and
does it exceed the specified threshold?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as a concurrence
q
agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 15
1.8 Is any part of the premises in an interim koala habitat protection area identified under the South East
Queensland Koala state planning regulatory provisions (SEQ Koala SPRP)?
Yes • It is recommended that you complete part 5 of this checklist
q
Operational work checklist-IDAS checklist4
Version i. o i8 December 2oo9
Page 18
1.9 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also
assessable?
No
q Yes • It is recommended that you complete of part 6 of this checklist
i.io Does the Vegetation ManagementActs999 apply to any of the proposed operational work for the clearing of native
vegetation?
1:1 No
Yes • It is recommended that you complete part 7 of this checklist
1-1
1.11 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct2000,
for taking or interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and
other than under the WaterAct2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
No • It is recommended that you complete part 8 (starting from question 8.9) of this checklist
q Yes • It is recommended that you complete part 8 (starting from question 8.1) of this checklist
1.12 Is any of the proposed operational work tidal work, other than excluded work defined under the Sustainable
Planning Regulation 200.0?
No
Yes • It is recommended that you complete part 9 of this checklist
q
1.13 Is any of the operational work proposed to be carried out within a coastal management district
U11No
q Yes • It is recommended that you complete part io of this checklist
1.14 Is any of the proposed operational work for constructing or raising waterway barrier works under the fisheries
Act 1994?
to
Lslv4
q Yes • It is recommended that you complete part ii of this checklist
3 Operational work checklist- WAS checklist 4
Version i. o 18 December 2009
Page 19
uL
1.15 Is any of the proposed operational work to be carried out completely or partly within a declared fish habitat area
under the f/sherles Act 1994?
Yes . It is recommended that you complete part 12 of this checklist
q
1.16 Is any of the proposed operational work removing. destroying or damaging marine plants under the fisheries
Act 1994?
Lo
Yes . It is recommended that you complete part 13 of this checklist
q
1.17 Is any of the operational work proposed to be carried out in a wild river area declared under the Wild RlversAct
Zoos?
L"J No
Yes . It is recommended that you complete part 14 of this checklist
q
1.18 Is any part of the premises located in part of a future state-controlled road or within too metres of a state-
controlled road?
E' No
Yes . It is recommended that you complete part 15 of this checklist
Part 2-State-controlled roads
2.1 Is the proposed operational work for filling or excavating listed in the Sustainable Planning Regulation 2oo9
schedule 11 and does it exceed the threshold or combined threshold?
0 No . End of part 2 of this checklist
D Yes . This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
. End of part 2 of this checklist
Operational work check/is; -IDAS checklist 4
Version s.o i8 December 2009
Page 20
J uu
2.2 Is any of the proposed operational work associated with access to a state-controlled road?
'No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
2.3 Is any of the proposed operational work for filling or excavation?
EI-110
F] Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
2.4 Does any of the proposed operational work involve the redirection or intensification of site stormwater from the
land through a pipe with a cross-sectional area greater than 625 square centimetres that directs stormwater to a
state-controlled road?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
q
agency
Section reference:
• Sustainable PianningRegulation 2009, schedule 7, table 3, item i(b) and 2
Part 3-Acid sulfate soils
3.1 Is the natural ground level of any point where work is being carried out less than 20 metres Australian Height
Datum (AHD)?
^No • End of part 3 of this checklist
Yes
q
3.2 Does the proposed operational work involve the following?
excavating more than iooo cubic metres of soil or sediment at or below five
q Yes q No
metres AHD
using more than iooo cubic metres or more of material with an average
LI Yes 1-1 No
depth of 0.5 metres on land, soil or sediment at or below five metres AHD
• If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as an advice agency
rational work checklist-IDAS checklist 4
Version i. o r8 December 2009
Page 21
I 1. I!
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 3
• State planning policy 2/02: Planning and managing development involving acid sulfate soils, section 3.6
Part 4-Easements and substations r- (L,
4.1 Is the filling or excavation associated with reconfiguring a lot?
12 No
LI • Go to question 4.5
4.2 Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under
the Electricity Act 1994?
aNo • Go to question 4.5
R
4.3 Is any of the proposed operational work to be located wholly or partly in the easement?
12 No
Yes • This application requires assessment by the entity responsible for the easement as an advice agency
q
4.4 Is any of the operational work to be located wholly or partly within 1o metres of a substation site under the
Electricity Act 1994?
Yes • This application requires assessment by the entity responsible for the substation as an advice agency
q
4.5 Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number i issued
under the Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline?
[:rNo • End of part 4 of this checklist
Yes • This application requires assessment by the pipeline licence holders as an advice agency
q
4.6 Is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping and not
associated with reconfiguring a lot? ti IN
q No • End of part 4 of this checklist
q Yes • This application requires assessment by the pipeline licence holder as an advice agency
Operational work checklist-IDAS checklist4
Version i. o i8 December 2009
Page 22
Juu
4.7 Is any of the operational work proposed to be located wholly or partly in the easement? NI (
No
F] Yes • This application requires assessment by the pipeline licence holder as an advice agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 9(a), 9(b) and 17
Part 5-Koala conservation
5.1 Do any of the exceptions stated in section 1.4 of the SEQ Koala SPRP apply?
• End of part 5 of this checklist
FJYes
5.2 Will the activity result in the following?
clearing of native vegetation over an area greater than 2500 square metres Yes No
excavation or filling of an area greater than 5000 square metres
q Yes No
--------- ---------------
loss of mature koala habitat trees. Yes No
an increased number of lots Yes No
• If yes to any of the above, then this application requires assessment by the Department of Environment and
Resource Management as a concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 38
• Sustainable Planning Regulation 2009, schedule 7, table 3, item 36
• South fast Queensland Koala State planning regulatory provisions
Part 6-Reconfiguring a lot
6.1 Is any part of the premises in a wild river area declared under the Wild RiversAct2005?
ENo • You must complete Building or Operational work assessable against a planning scheme-IDASform6
• End of part 6 of this checklist
Yes
Operational woi k c h r,rk list-/DAS checklist 4
Version 1.018 December 2009
Page 23
6.2 Is the proposed operational work for residential, commercial or industrial purposes outside a designated urban
area, as defined by the Wild RiversAct20O5? to ^1^
No You must complete Building or Operational work assessable against a planning scheme-IDAS form 6
q
This application must be assessed by the relevant local government if the premises are completely or
partly within a single local government area
Yes You must complete Building or Operational work assessable against a planning scheme-IDAS form 6
q
This application must be assessed by the relevant local government
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 3, parti, table 4, item 9
• Wild Rivers Code (Note: the code does not currently contain applicable provisions for residential, industrial or
commercial development inside a designated urban area)
Part 7-Vegetation clearing
7.1 Is the proposed clearing assessable (i.e. not an exception) under schedule 3, part i, table 4 item i of the
Sustainable PlanningAct 2009?
No • End of part 7 of this checklist
Yes
q
7.2 Is the proposed vegetation clearing a relevant purpose under the Vegetation ManagementAct i999, section 22A
for one or more of the following? N^4
a project declared to be a significant project under the State Development Yes No
FJ
and Public Works Organisation Act 1971, section 26
necessary to control non-native plants or declared pest Yes No
to ensure public safety Yes No
for establishing a necessary fence, firebreak, road or vehicle track, or for F]Yes No
constructing necessary built infrastructure, if there is no suitable alternative
site for the fence, firebreak, road, track or infrastructure
a natural and ordinary consequence of other assessable development for
q Yes No
which a development approval as defined under the Planning Act was given,
or a development application as defined under the Planning Act was made,
before 16 May 2003
for fodder harvesting
q Yes No
for thinning
q Yes q No
for clearing of encroachment q Yes q No
r !, r rn 0c : -IDAS checklist 4
Version i.o rB December2000
Page 24
qqq
for an extractive industry Yes No
q
for clearing regrowth on leases issued under the LandAct 1994 for Yes q No
agriculture or grazing purposes
for clearing regrowth on freehold land, or indigenous land, in a wild river Yes q No
high preservation area
for a special indigenous purpose under the Cape York Peninsula Heritage Yes q No
Act 2007
• If no to all of the above, then the clearing is not a relevant purpose and this aspect of the development is
prohibited development
• End of part 7 of this checklist
7.3 Is the proposed clearing associated with a material change of use or reconfiguring a lot for which referral is
required in relation to clearing vegetation? h ^ ,\
No
Yes • End of part 7 of this checklist
q
7.4 Is any of the proposed clearing in an area declared as an area of high nature conservation value (other than a wild
river high preservation area) or an area vulnerable to land degradation under the Vegetation ManagementAct
1999? NIk
No • You must complete Clearing native vegetation-/DASform i1
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Go to question 7.6
Yes
7.5 is any of the proposed clearing for fodder harvesting, extractive industry, clearing regrowth on leases for
agriculture or grazing purposes under the LandAct1994 or a natural and ordinary consequence of other
assessable development defined under the Sustainable PlanningAct2009, or a development application as
defined under the Planning Act was made, before 16 May 2003? ,-'^ ^ F\
No • You must complete Clearing native-/DASform si
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
Yes • The clearing is not a relevant purpose and this aspect of the development is prohibited development
q
Pik checklist-/DASchecklist4
Version i. o 18 December 2009
Page 25
n
7.6 Is any of the proposed clearing in the high preservation area of a declared wild river area?
No • You must complete C/earingnative vegetation-IDA5 form ii
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Go to question 7.8
Yes
7.7 Is any of the proposed clearing for the following purposes?
N IR
a project declared to be a significant project under the State Development Yes No
and Public Works Organisation Act 1971, section 26
for fodder harvesting, thinning or an extractive industry Yes No
q
fora special indigenous purpose under the Cape York Peninsula Heritage
F] Yes F-1 No
Act 2007
for clearing regrowth on leases issued under the LandAct1994 for Yes F No
agriculture or grazing purposes and in a high preservation area outside of a
registered area of agriculture as defined under the Vegetation Management
Act 1999
for clearing regrowth on freehold land or indigenous land, in a wild river F ]Yes F No
area and in a high preservation area outside of a registered area of
agriculture as defined under the Vegetation ManagementAct 1999
• Unless the application is consistent with any approved development plan applying to the land, this aspect of
the development is prohibited
• If no to all of the above, you must complete Clearing native vegetation-IDAS form ii
• This application requires assessment by the Department of Environment and Resource Management (DERM). If DERM is not
the assessment manager for the application, the role of the agency will be as a concurrence agency and you must give
DERM a copy of the application
• Subject to the declaration for the relevant wild river area, the application requires assessment for the purposes of the Wild
Rivers Act 2005
If yes to any of the above, then the clearing is not a relevant purpose and this aspect of the development is
prohibited development
7.8 Is any of the proposed clearing in a koala conservation area or koala sustainability area, other than in an SEQ
urban footprint area? ^y ^ P\
No • End of part 7 of this checklist
Yes
Operational work check list-/DAS checklist 4
Version 1. o 18 December 2009
Page 26
7.9 is any of the proposed clearing associated with reconfiguring a lot for which a referral Is required in relation to
the proposed clearing in a koala conservation area or koala sustainability area? N
E No
Yes • End of part 7 of this checklist
q
7.10 Is any of the proposed clearing over an area greater than 2500 square metres? NIN
No
Yes • This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item i
• Sustainable Planning Regulation 2009, schedule 5, part 3, table 4, item i
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 5 and 37
• Vegetation ManagementAct 1999, section 22A
• Wild Rivers Act 2005, section 31F
• Wild Rivers Code
Part 8-Taking or interfering with water
8.1 Is any of the proposed clearing for the following purposes?
a water resource plan under the WaterAct2000 Yes No
a wild river declaration under the Wild Rivers Act 2005 Yes No
a regulation under the Sustainable Planning Act 2009 or the WaterAct2000 Yes No
If no to all of the above, this application requires assessment by the Department of Environment and Resource
Management (DERM). If DERM is not the assessment manager for the application, the role of the agency will be
as a concurrence agency and you must give DERM a copy of the application
8.2 Is any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
No
F]Yes • If any part of the proposal relates to operational work that interferes with water in a high preservation area
or a nominated waterway (other than for a dam or weir), then this aspect of the development is prohibited
development
• All other proposals are subject to the declaration for the relevant wild river area and assessment may be
required for the purposes of the Wild Rivers Act 2005
rk checklist-IDAS checklist 4
Version 1.018 December 2009
Page 27
8.3 Is the work for a water pump?
I 1 Yes • You must complete Watercourse pump-/DASform 13
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.4 Is the work for water storage?
ITN o
Yes . You must complete Water storaffe-IDA5 form 14
. This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.5 Is the work for gravity diversion from a watercourse?
ErN o
Yes • You must complete Gravity diversion from a watercourse-IDA5 form 15
• This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.6 Is the work for a watercourse diversion?
No
F1 Yes . You must complete Watercourse diversion-/DAS form 17
This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.7 Is the work for other work for taking or interfering with water?
u/No
Yes . You must complete Other work in a watercourse-/DAS form 21
. This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
is , hrr Ails!-/DAS checklist4
Version i. o 18 December 2009
Page 28
qqq
8.8 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking or interfering with artesian water (other than using a water truck to pump water)?
lam"/No
Yes • You must complete Taking artesian or sub-artesian water-IDA5 form 12
This application requires assessment by the Department of Environment and Resource Management as a
concurrence agency
8.9 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking overland flow water (other than using a water truck to pump water)?
FZJ"N0 • Go to question 8.12
Yes
8.io Are the operations mentioned as assessable development In the following? r'l ^
a water resource plan under the WaterAct2000 Yes No
a regulation under Sustainable Planning Act2009orthe WaterAct2000.
q Yes No
• If yes to any of the above, you must complete Taking overland flow-IDAS form 19
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.11 Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried
out in the relevant wild river area declared under the Wild RlversAct200 ?
q No
Yes • You must complete Takingover/and flow-/DASform 19
q
• If any part of the proposal relates to operational work in a high preservation area other than works stated
in a wild river declaration for the area to be an assessable development for which a development
application may be made then this aspect of the development is prohibited development
• All other proposals are subject to the declaration for the relevant wild river area and assessment may be
required for the purposes of the Wild Rivers Act2005
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Operations! work checklist-/DA5 checklist4
Version i. o 18 December 2009
Page 29
8.12 Is any of the proposed operational work for any thing constructed or installed that allows, under the WaterAct
2000, for taking or Interfering with subartesian water (other than using a water truck to pump water)?
• Go to question 8.14
12 No
Yes
q
8.13 Are the operations mentioned as assessable development in the following?
a water resource plan under the WaterAct2000 q Yes I No
a regulation under the Sustainable PlanningAct2009 or the WaterAct 2000
LI Yes q No
• If yes you must complete Taking artesian or sub-artesian water-/DASform 12
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.14 Does any of the proposed operational work for any thing constructed or Installed that allows, under the WaterAct
2000, for Interfering with overland flow water (other than using a water truck to pump water)?
9 No • Go to question 8.19
R Yes
8.15 Is the proposed operational work to be carried out In a floodplain management area of a wild river area
declared under the Wild R1versAct 2005?
No • Go to question 8.17
q
F]Yes
8.16 Is the proposed operational work related to:
specified works for the area q Yes q No
work stated in the relevant wild river declaration to be assessable q Yes q No
development for which an application may be lodged.
• If yes to any of the above you must complete Interfering with overland flow-IDAS form 20
• Subject to the declaration for the relevant wild river area, this application requires assessment by the
Department of Environment and Resource Management as concurrence agency
If no to both of the above, then this aspect of the development is prohibited development
,ik (hr(AI,st-IDAS checklist y
Version i.o i8 December 2000
Page 30
8.17 Are the operations mentioned as assessable development in the following? N
a water resource plan under the WaterAct2000 Yes No
a regulation under the Sustainable Planning Act2oo9and WaterAd 2000 No
1:1 Yes
• If yes to any of the above, you must complete Interfering with overland flow-/DAS form 20
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
8.18 Is the interfering with overland now water proposed in an area declared under the WaterAct2000to be a
drainage and embankment area (other than a wild river floodplain management area) and declared to be assessable
under that Act? NI
No
Yes • In addition to this checklist, you must also complete Interfering with overland flow-/DAS form 20
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
8.19 Is the proposed operational work for the following?
for the construction of a referable dam as defined under the Water Supply F]Yes [^J/No
(Safety and Reliability) Act 2008
to increase the storage capacity of a referable dam by more than io percent. Yes [2*`No
• If yes to any of the above you must complete Referable dam-/DAS form 16
• This application requires assessment by the Department of Environment and Resource Management (DERM). If
DERM is not the assessment manager for the application, the role of the agency will be as a concurrence agency
and you must give DERM a copy of the application
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part 1, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, items 3 and 4
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 9,1o and 11
• Water Act 2000, section 966A and 966B (note: no current wild river declaration identifies taking or interfering
with subartesian water as assessable)
• Wild Rivers Act 2005, section 43A
• Wild Rivers Code (note: the code does not currently contain applicable provision for taking or interfering with
artesian water)
• Relevant wild river declarations
J5 Operational work checklist-IDAS checklist4
Version 1. o 18 December 20D9
Page 31
qqq
Part 9-Tidal work
9.1 Is any of the proposed tidal work prescribed tidal work?
• Go to question 9.10
9.2 Is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act Zoo r'1 ^ i
No
Yes • Go to question 9.6
9.3 Is the work proposed in a canal?
No
El Yes • Go to question 9.5
9.4 Is any of the proposed tidal work for a marina with more than 6 vessel berths? rJ l
No • You must complete Prescribed tidal work-IDAS form 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Yes • You must complete Prescribed tidal work-/DAS form 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
efalionaiwn;A cl?c-rniict-/DASchecklist 4
Version 1. o 18 December 2004)
Page 32
9.5 Is any of the proposed tidal work for a marina with more than 6 vessel berths? NIA
No • You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Yes • You must complete Prescribed tidal work-WAS forM 28
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
9.6 Is all of the proposed prescribed tidal work for specified works under the Wild R1versAct 2005? t1 ^ '^
No • This aspect of the development is prohibited development
Yes
9.7 Is the work proposed in a canal?
Yes I • Go to question 9.9
9.8 Is any of the proposed tidal work for a marina with more than 6 vessel berths? N I ,N
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-10A5 form 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency for the purposes of the Wild Rivers Act 2005
F1 Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
I ^ , herA//ct-IDASchecklist 4
Version i. o z8 December 2009
Page 33
Juu
9.9 Is any of the proposed tidal work for a marina with more than 6 vessel berths? NI'^
LI No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-IDA5 form 28
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency for the purposes of the Wild Rivers Act 2005
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Prescribed tidal work-/DASform 28
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
9.io Is any of the proposed tidal work to be carried out in a wild river area declared under the Wild RiversAct2005?
Go to question 9.13
L"INo
F]Yes
9.11 Is all of the proposed operational work for specified works under the W11d Rivers Act 2005? r 1c\
• This aspect of the development is prohibited development
LI No
• Go to question 9.14
Yes
1
9.12 Is any of the proposed tidal work for a marina with more than 6 vessel berths? r-4 1ls^'
No • Unless the application is consistent with any property development plan applying to the land, the
q
assessment manager must refuse to receive it. This aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts-IDAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
vork checklist-IDAS checklist 4
Version i. o 18 December 2009
Page 34
Yes • Unless the application is consistent with any property development plan applying to the land, the
assessment manager must refuse to receive it. This aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts-IDAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environment and Resource Management
9.13 Is any of the proposed tidal work for a marina with more than 6 vessel berths?
No • You must complete Tidal work and coastal management districts-IDAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Yes • You must complete Tidal work and coastal management districts-IDAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application requires assessment by the Department of Transport and Main Roads as a concurrence
agency
• This application requires assessment by the Department of Community Safety as advice agency
9.14 Is any of the proposed tidal work to be carried out In one or more of the following tidal areas? N
one only local government tidal area Yes No
starting in one local government tidal area and extending into another local
q Yes q No
government tidal area (but in no strategic port tidal area)
in two or more local government tidal areas but not starting in either local Yes No
government tidal area
one only strategic port tidal area Yes No
a tidal area that is not a strategic port tidal area or a local government tidal Yes No
q
area.
• The answers you provide above may affect who the assessment manager is for the application
Section reference:
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, items 6 and 7
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 13, 15 and 18
Operational work checklist-/DA5 checklist 4
Version i. o 18 December 2009
Page 35
it
• Coastal Protection Management Act 1995, section 104A
Part io-Coastal management /"T
io.i Is the proposed operational work for the following?
interfering with quarry material on state coastal land above high-water mark Yes q No
disposing of dredge spoil or other solid waste material in tidal water
q Yes E] No
draining or allowing drainage or flow water or other matter across state Yes No
costal land above high-water mark
constructing or installing works in a watercourse where the works are not Yes No
q
assessable under Sustainable PlanningAct2009, schedule 3, part 1, table 4,
items 3 or 4
reclaiming land under tidal water Yes No
q
constructing an artificial waterway, other than a canal, associated with Yes No
reconfiguring a lot
constructing an artificial waterway that is a canal, associated with Yes No
q
reconfiguring a lot
constructing an artificial waterway not associated with reconfiguring a lot on
q Yes No
land, other than state coastal land, above high-water if the maximum
surface area of water on the waterway is at least 5000 square metres
constructing a bank or bund wall to establish a ponded pasture on land, Yes No
other than state coastal land, above high-water mark
removing or interfering with coastal dunes on land, other than state coastal Yes No
land, that is in an erosion prone area and above high-water mark.
. If you answered no to all of the above, then end of part io of this checklist
10.2 Is any of the proposed work to be carried out in a wild river area under the Wild RlversAct 200 0 1k
No • You must complete Tidal work and coastal management districts-IDAS form 23
q
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application may require assessment by the Department of Transport and Main Roads as concurrence
agency
• End of part io of this checklist
Yes
q
IDAS checklist 4
Version r. o 18 December 200-
Page 36
10.3 Is all of the proposed operational work for specified works under the Wild RiversAct2005?
No • This aspect of the development is prohibited development
Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Tidal work and coastal management districts -WAS form 23
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• This application may require assessment by the Department of Transport and Main Roads as concurrence
agency
• Subject to the relevant declaration for the wild river area, this application requires assessment by the
Department of Environroeot and Resource Management
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 5
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, items 5 and 6
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 13 and 15
• Coastal Protection and Management Act 1995, section 1o4A
Part ii-Waterway barrier works N 4\
ii.i Is any of the proposed operational work to be carried out in a wild river area declared under the Wild RiversAct
2005?
E No
Yes • Go to question 11.3
11.2 Is all of the operational work for constructing or raising waterway barrier works?
temporary LI Yes LI No
minor Yes LI No
rebuilt on a regular basis. Yes LI No
If yes to any of the above, end of part ii of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
• If no to all of the above, then in addition to this checklist, you must also complete Building or raising waterway
barrier works-IDAS form 27
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will be as
a concurrence agency and you must give DEEDI a copy of the application
'. (1O'( Mist-/DAS checklist4
Version i. o 18 December 2009
Page 37
LJ
11.3 Is any of the proposed operational work to be carried out in a wild river high preservation area?
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Waterway barrier works-IDAS form 27
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act zoos
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 6
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 29
• Fisheries Act1994, section 76D
• Fisheries Regulation 1995• section 706
Part 12-Declared fish habitat area
12.1 Is the operational work reasonably necessary for?
the maintenance of existing structures, including for example the following Yes No
structures, if the structures were constructed in compliance with all the
requirements under any Act:
• boat ramps, boardwalks, drains, fences, jetties, roads, safety signs,
swimming enclosures and weirs
• existing powerlines or associated powerline infrastructure
educational or research purposes relating to the fish habitat area Yes No
monitoring the impact of development on the declared fish habitat area Yes No
the construction or placement of structures, including for example, safety Yes No
signs, swimming enclosures and aids to navigation, if:
• the impact on the area is minor and
• the structures are constructed in compliance with all the requirements,
under any Act
public benefit works, including, for example, the construction of runnels for Yes No
mosquito control, the removal of Lyngbya and seed collection for site
rehabilitation, if the impact on the area is minor
• If yes to any of the above, end of part 12 of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
Operational work checklist-IDAS checklist y
Version 1.0 r8 December 2009
Page 38
12.2 Is that proposed operational work to be carried out in a wild river area declared under the W11d R1versAct2oo57 rl l ^r
No • You must complete Marine plants and declared fish habitat areas-/DAS form 26
q
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
Yes
12.3 Is all of the proposed operational work for specified works under the W11d R1versAct2005?
No
Yes • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-/DAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
• End of part 12 of this checklist
12.4 Is any of the proposed operational work to be carried out In a wild river high preservation area? N
No • Unless the application is consistent with any property development plan applying to the land, the
q
assessment manager must refuse to receive it
• You must complete Marine plants and declared fish habitat areas-/OAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable PlanningRegulation 2009, schedule 3, part i, table 4, item 7
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 3
• Sustainable Planning Regulation 2009, schedule 5, part 1, table 4, item 9
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 26
• Fisheries Act 1994, section 76DC
• Fisheries Regulation 1995, section 706
2; Operational work e hr'rh list-IDAS checklist 4
Version 1.0 18 December 200')
Page 39
nnn
Part 13-Removal, destruction or damage of a marine plant
13.1 Is the proposed operational work reasonably necessary for?
the removal, destruction or damage of dead marine wood on unallocated Yes No
state land, other than in a wild river area, for trade or commerce
the maintenance of existing structures, including, for example, the following No
1:1 Yes
structures, if the structures were constructed in compliance with all the
requirements, under any Act:
• boat ramps, boardwalks, drains, fences, jetties, roads, safety signs,
swimming enclosures and weirs
• existing drainage structures
• existing powerlines or associated powerline infrastructure
for educational or research purposes or for the monitoring the impact of 0 Yes No
development on marine plants
for the construction or placement of structures, (e.g. swimming enclosures, Yes LI No
safety signs, aids to navigation, fences, pontoons, public boat ramps and
pipelines) if:
• the extent of the removal, destruction or damage is minor and
• the structures were constructed in compliance with all the requirements,
under any Act
for the construction of runnels for mosquito control, removal of Lyngbya, F-1 Yes No
seed collection for site rehabilitation or the collection of marine plants for
fishing bait, or handicraft
If yes to any of the above, end of part 13 of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
13.2 Is that proposed operational work to be carried out In a wild river area declared under the Wild Rivers Act 200574 jp
No • You must complete Marine plants and declared fish habitat areas-IDAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• End of part 13 of this checklist
Yes
13.3 Is all of the proposed operational work for specified works under the Wild RiversAct Zoos? NJ I
No
LI Yes • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-IDAS form 26
s! - /DAS checkfist y
Version r.o 18 December 2009
Page 40
-Juu
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
• End of part 13 of this checklist
13.4 Is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
Infrastructure required to support other development for which a development permit is not required or, if a
development permit Is required, the permit is held or has been applied for? f 1, 1
No • This aspect of the development is prohibited development
Yes • Unless the application is consistent with any property development plan applying to the land, then this
q
aspect of the development is prohibited development
• You must complete Marine plants and declared fish habitat areas-IDAS form 26
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 4
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 30
• Fisheries Act 1994. section 76DB
• fisheries Regulation 1995, section 706
Part 14-Wild river area
14.1 Is the proposed operational work for the following and also declared under the wild river declaration for the
area to be assessable?
agricultural activities as defined under the Wild Rivers Act 2005 Yes No
animal husbandry activities as defined under the Wild Rivers Act 2005 Yes No
• If no to all of the above, then end of part 14 of this checklist
14.2 Is any part of the premises in the wild river high preservation area?
No
LI Yes • This aspect of development is prohibited development
• End of part 14 of this checklist
:5 Operational worA chrCAiisr-/DASchecklist 4
Version i. o 18 December 2009
Page 41
14.3 Is the proposed use in relation to the production of a high risk species as defined under the Wild RiverAct
2005? N I .^
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Agricultural activities in a wild riverarea-IDAS form 29 if agricultural activities to occur
• You must complete Animal husbandry activities in a wild river area-IDASform 30 if the development
involves animal husbandry
• This application requires assessment by the Department of Environment and Resource Management
(DERM). If DERM is not the assessment manager for the application, the role of the agency will be as a
concurrence agency and you must give DERM a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act 2005
Yes • This aspect of the development is prohibited development
F]
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 9
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 42
• Wild Rivers Act 2005, sections 42
Part 15-State-controlled roads
15.1 Is the proposed use associated with a material change of use under a planning scheme or reconfiguring a lot
that increases the total number of lots or the total number of lots adjacent to state-controlled roads?
No
0 Yes • End of checklist
15.2 Is any of the proposed operational work associated with access to a state-controlled road?
Er No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
15.3 Is any of the proposed operation work for filling or excavation?
No
Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
26 Operational work r her n list-IDAS checklist 4
Version r. o 18 December 2009
Page 42
15.4 Does any of the proposed operational work involve the redirection or intensification of site stormwater from the
land through a pipe with a cross-sectional area greater than 625 square centimetres that directs stormwater to a
state-controlled road?
U No
El Yes • This application requires assessment by the Department of Transport and Main Roads as concurrence
agency
Section reference:
• Sustainable Planning Regulation 2009, schedule 7, table 2, item 3
Notes for completing this form:
• Applicant details-10A5 form i and Development application assessment-/DAS checklisti must be completed
for all development applications to be considered
• The Sustainable PlanningAct 2009 is administered by the Department of Infrastructure and Planning
Privacy-please refer to your assessment manager for further details on the use of information recorded in
this form
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that the information contained on this form and
provided as part of this process will be of assistance to you, it is provided on the basis that you will not rely on the
information without first making your own enquiries regarding the interpretation and application of the applicable
legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any loss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this process and the information contained on this form.
OFFICE USE ONLY
Date received Reference numbers Opuj\^ 00
\0' 2-k(
The Sustainable PlanningAct 2009 is administered by the Department of Infrastructure and Planning.
27 Operational work checklist-IDAS checklist 4
Version :. o 18 December 2009
Page 43
2010-12-16 06:13 Elio ZambeUi 0266763017 617 33645185 P V1
D
The Shell Company of Australia Limited
GE & RL Evans Retail
385 Eagle Farm Road
PO Box 162
Pinkenba Queensland 4008
Pottsville, NSW, 2489 Australia
Tel +61 7 3364 5236
Fax +61 7 3364 5185
14 December 2010
Emar7: [email protected]
Internet http://www.shell.com.au
Dcar Ezio and Graham,
RE: The Proposed Installation of a new 7m RVI-E Sign
Premises: Shell Noosa. Cnr David Low Way and Honeysuckle Avenue, Neosa Headsr QIdI_-
4567
I write regarding the proposed installation of a new 7m RVI-E Sign at the above Premises. As the
property owner, Shell requires your consent for the works to progress.
C-an-you pleaseindicate if you;--
e Agree to Shell carrying out the SI sign replacement works
• Pertnir any duly authorised officer of the Council to enter the subject land or premises to carry
out inspections and surveys or take measurements or photographs as required for the
administration of the Act(s), Regulation or Planning instruments
Please confirm your consent by signing and dating this letttg and return via email or fax
Acknowledgement/Signature:
Name &l3usincsa Name:
Date: le , , 9( E d tr ,o o
Kind regards
Neil Hcrnan
Property Management Coordinator Qld &N'1'
Atilt 4t 004 bi; 454
;1 sign utttr 8it?Ot0
Used in these records
OPW11/0034 Development Application Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.