Skip to the record
Search everything, all in one place.

Council archive · source document

OPW11/0034 Development Application Part 1 of 2

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

        J uu

    2.2 Is any of the proposed operational work associated with access to a state-controlled road?


    'No

        Yes      •   This application requires assessment by the Department of Transport and Main Roads as concurrence
                     agency



    2.3 Is any of the proposed operational work for filling or excavation?


    EI-110
    F] Yes       •   This application requires assessment by the Department of Transport and Main Roads as concurrence
                     agency



    2.4 Does any of the proposed operational work involve the redirection or intensification of site stormwater from the
    land through a pipe with a cross-sectional area greater than 625 square centimetres that directs stormwater to a
    state-controlled road?


        No

        Yes      •   This application requires assessment by the Department of Transport and Main Roads as concurrence
    q
                     agency


Section reference:
•     Sustainable PianningRegulation 2009, schedule 7, table 3, item i(b) and 2




    Part 3-Acid sulfate soils


    3.1 Is the natural ground level of any point where work is being carried out less than 20 metres Australian Height
    Datum (AHD)?


     ^No         •   End of part 3 of this checklist

        Yes
    q


    3.2 Does the proposed operational work involve the following?


    excavating more than iooo cubic metres of soil or sediment at or below five
                                                                                    q Yes        q     No
    metres AHD

    using more than iooo cubic metres or more of material with an average
                                                                                    LI Yes 1-1 No
    depth of 0.5 metres on land, soil or sediment at or below five metres AHD


•    If yes to any of the above, then this application requires assessment by the Department of Environment and
     Resource Management as an advice agency



                                                                                  rational work checklist-IDAS checklist 4
                                                                                             Version i. o r8 December 2009

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0034 Development Application Part 1 of 2.pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.