Skip to the record
Search everything, all in one place.

Council archive · source document

OPW11/0034 Development Application Part 1 of 2

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

         Juu
    4.7 Is any of the operational work proposed to be located wholly or partly in the easement?              NI (


         No

    F] Yes       •   This application requires assessment by the pipeline licence holder as an advice agency


Section reference:
•     Sustainable Planning Regulation 2009, schedule 7, table 3, item 9(a), 9(b) and 17




    Part 5-Koala conservation


    5.1 Do any of the exceptions stated in section 1.4 of the SEQ Koala SPRP apply?


                 •   End of part 5 of this checklist

    FJYes



    5.2 Will the activity result in the following?


    clearing of native vegetation over an area greater than 2500 square metres            Yes           No

    excavation or filling of an area greater than 5000 square metres
                                                                                    q Yes               No
                                   ---------                                                                 ---------------
    loss of mature koala habitat trees.                                                   Yes           No
    an increased number of lots                                                           Yes           No


•     If yes to any of the above, then this application requires assessment by the Department of Environment and
      Resource Management as a concurrence agency


Section reference:
•     Sustainable Planning Regulation 2009, schedule 7, table 2, item 38
•     Sustainable Planning Regulation 2009, schedule 7, table 3, item 36
•     South fast Queensland Koala State planning regulatory provisions




    Part 6-Reconfiguring a lot


    6.1 Is any part of the premises in a wild river area declared under the Wild RiversAct2005?


    ENo          •   You must complete Building or Operational work assessable against a planning scheme-IDASform6

                 •   End of part 6 of this checklist

        Yes




                                                                             Operational woi k c h r,rk list-/DAS checklist 4
                                                                                            Version 1.018 December 2009

Used in these records

About this file

File size
7.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW11_0034 Development Application Part 1 of 2.pdf · 7.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.