11.3 Is any of the proposed operational work to be carried out in a wild river high preservation area?
No • Unless the application is consistent with any property development plan applying to the land, then this
aspect of the development is prohibited development
• You must complete Waterway barrier works-IDAS form 27
• This application requires assessment by the Department of Employment, Economic Development and
Innovation (DEEDI). If DEEDI is not the assessment manager for the application, the role of the agency will
be as a concurrence agency and you must give DEEDI a copy of the application
• Subject to the declaration for the relevant wild river area, assessment may also be required for the
purposes of the Wild Rivers Act zoos
Yes • This aspect of the development is prohibited development
Section reference:
• Sustainable Planning Regulation 2009, schedule 3, part i, table 4, item 6
• Sustainable Planning Regulation 2009, schedule 3, part 2, table 4, item 2
• Sustainable Planning Regulation 2009, schedule 5, part i, table 4, item 8
• Sustainable Planning Regulation 2009, schedule 7, table 2, items 29
• Fisheries Act1994, section 76D
• Fisheries Regulation 1995• section 706
Part 12-Declared fish habitat area
12.1 Is the operational work reasonably necessary for?
the maintenance of existing structures, including for example the following Yes No
structures, if the structures were constructed in compliance with all the
requirements under any Act:
• boat ramps, boardwalks, drains, fences, jetties, roads, safety signs,
swimming enclosures and weirs
• existing powerlines or associated powerline infrastructure
educational or research purposes relating to the fish habitat area Yes No
monitoring the impact of development on the declared fish habitat area Yes No
the construction or placement of structures, including for example, safety Yes No
signs, swimming enclosures and aids to navigation, if:
• the impact on the area is minor and
• the structures are constructed in compliance with all the requirements,
under any Act
public benefit works, including, for example, the construction of runnels for Yes No
mosquito control, the removal of Lyngbya and seed collection for site
rehabilitation, if the impact on the area is minor
• If yes to any of the above, end of part 12 of this checklist and a permit for that aspect of the operational work is
not required but it must comply with any applicable self-assessable codes
Operational work checklist-IDAS checklist y
Version 1.0 r8 December 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW11/0034 Development Application Part 1 of 2Related documentApplication case desk ↗
About this file
- File size
- 7.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.