Council archive · source document
P0433-25-001_17_Bottlebrush_Avenue_ESR · MCU26/0001
Very large file (30.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
2.5 Sewer Infrastructure A Unitywater sewer maintenance hole is located within the southern corner of the site and provides a potential connection point for the proposed development. Unitywater mapping indicates a surface level of 31.30 m AHD and an invert level of 29.68 m AHD, providing sufficient depth for a gravity sewer connection. Refer to Figure 2-5 and Appendix A – Drawing C401 for details. 2.6 Water Infrastructure The proposed development can be serviced by the existing 100 mm diameter water main located within Bottlebrush Avenue. Unitywater mapping confirms the presence of this main and identifies it as a suitable connection point, subject to Unitywater approval. Refer to Figure 2-5 and Appendix A – Drawing C401 for further details. Figure 2-5 Water and Sewer Reticulation (UW, 2025) 17 BOTTLEBRUSH AVENUE, NOOSA HEADS 7 January 2026 P a g e | 10 Engineering Services Report Client Reference: P0433-25-001 Prepared for Made Capital PTY LTD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
P0433-25-001_17_Bottlebrush_Avenue_ESR.pdfRelated documentApplication case desk ↗
About this file
- File size
- 30.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.