3        Conclusion
RECOR has been engaged by Made Capital to prepare this ESR in support of a Development Approval and
Operational Works application to Noosa Shire Council and any nominated referral agencies for the proposed
Material Change of Use at 17 Bottlebrush Avenue, Noosa Heads.

This ESR demonstrates that the proposed multiple residential development can be effectively serviced in
accordance with Council requirements and best-practice engineering principles. The report confirms that the site
can be appropriately serviced by existing stormwater, water, sewerage, electricity, and telecommunications
infrastructure, subject to standard authority approvals.

The key engineering considerations and servicing strategy are summarised below:



    •   Site Access – An existing driveway from Bottlebrush Avenue will provide access to the site during
        construction. The proposed development includes a new internal driveway to service the on-site car
        parks.

    •   Earthworks – Site regrading will direct overland flow into a pit and pipe system conveying runoff to the
        southwest into a detention tank. Retaining walls and earthworks will be required to achieve compliant site
        grading.

    •   Erosion and Sediment Control – An ESC Plan will be prepared at the operational works stage to ensure
        appropriate sediment, erosion, and dust control measures are implemented throughout construction.

    •   Flood Overlay – Flood mapping indicates that the site is not affected by flooding or overland flow.

    •   Stormwater / Drainage – Internal drainage will convey runoff to the proposed detention tank for storage
        and controlled discharge to a single lawful point of discharge, in accordance with NSC requirements and
        relevant Australian Standards.

    •   Sewer Infrastructure – Unitywater sewer reticulation is located within the southern corner of the site,
        providing a potential connection point, subject to Unitywater approval.

    •   Water Infrastructure – A potential water connection exists via the existing 100 mm diameter water main
        in Bottlebrush Avenue. Final suitability will be confirmed through the Unitywater connection application
        process.

    •   Electrical and Telecommunications – Electrical supply is available via the existing overhead service within
        the Bottlebrush Avenue verge. NBN and Telstra services are also available within Bottlebrush Avenue,
        providing suitable connection points.




 17 BOTTLEBRUSH AVENUE, NOOSA HEADS
                                       7 January 2026                                                  P a g e | 12
 Engineering Services Report
 Client Reference: P0433-25-001
 Prepared for Made Capital PTY LTD

Used in these records

About this file

File size
30.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

P0433-25-001_17_Bottlebrush_Avenue_ESR.pdf · 30.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.