CAPITAL PROGRAM 2024/25 DELIVERY STATUS · Report
SERVICES & ORGANISATION COMMITTEE MEETING 12 NOVEMBER 2024
Noosa Heads, Lions Park Amenities
Upgrade
Full upgrade of the existing amenities,
including meeting the latest Australian
standards for disability access.
Emergent Projects
Emergent works approved by Project Control Group (PCG)/Capital Works Executive (CWE) during
Q1 include:
• Boreen Point, Amenities Upgrade of Rainwater System
• Tewantin, Cemeteries – purchase of grave shoring equipment
Tenders
Review of tenders for major projects during Q1 include:
• Noosa Heads, The J - Airconditioning System Stage 3
• Pomona, SES Amenities Upgrade
• Tewantin, Admin Building – Replace Main Aircon Condenser
Upcoming tenders planned for Q2 include:
• Noosaville, 74 Goodchap Street Stormwater Drainage
• Sunshine Beach, 56 Low Way Retaining Wall
• Sunshine Beach, Ed Webb Park Upgrade Stage 1
• Tewantin, Doonella Bridge Renewal (Design)
Major Programs 2024/25
The below summary provides an update on a selection of major programs within the 2024/25 Capital
Works Program.
Reseal Program
The Road Reseal Program has expended $676k of the $5.1m budget. The following roads on the
annual reseal program were undertaken during Q1 2024/25:
• Black Mountain, Blueberry Drive (Roundabout to Sugargum Place and Sugargum Place to
Blueberry Loop)
• Cooroy, Kauri Street (Tewantin Road to Lake Macdonald Drive)
• Noosaville, Bartlett Road
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.