Skip to the record
Accept no substitutions.

Original source · versioned page text

CAPITAL PROGRAM 2024/25 DELIVERY STATUS · Report

of 12

Page text shows just the words. Original shows the document exactly as it was published.

SERVICES & ORGANISATION COMMITTEE MEETING                                           12 NOVEMBER 2024




Pictured: Pinbarren Link Trail (left), Woondum Trail (right) - Completed upgrades




Pictured: Woondum Trail – Completed upgrades
Planning and Design Program
The Design Services team are currently managing 16 projects and providing design services to 18
projects and continue to provide design survey support to over 60 projects in the 2024/25 financial
year. These projects have a combined design and construction value exceeding $14m.
The following design projects are in various stages of design during this quarter:
      • Cooroy, Cooroy Sports Complex Car Park and Entrance
      •   Noosa, Noosa Parade Stage 2
      •   Noosa, Noosa Drive footpath
      •   Noosaville, Noosaville Foreshore Changing Places
      •   Noosaville, Weyba Road and Reef Street Roundabout Design
      •   Peregian Beach, Coastal Pathway Stage 1
      •   Shire Wide, Bus Stop Program
      •   Shire Wide, Pathway Program
      •   Sunshine Beach, 58 David Low Way Retaining Wall
Log in to download the original file

Report.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.