Council archive · source document
Negotiated Decision Notice - 010.2007.00001447.001 [As Published] · 132007.1447
-6- 2007/1447
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $3,002
PSP16 – Sewerage Headworks Contributions $2,163
PSP17 – Water Supply Headworks Contributions $3,844
PSP20 – Pathway Trunk Network Contributions $1,350
TOTAL Contribution Amount = $10,359
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from September 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the trading bank guarantee will be returned.
General
41. For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class of
work. The application may combine any or all of these classes of work:-
41.1. Access and/or Carparking.
41.2. Stormwater Drainage.
41.3. Landscaping.
41.4. Erosion & Sediment Control
42. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
submitted in conjunction with any application for Operational Works.
43. Digital detailed designs including drawings, calculations, etc shall be submitted with any
application for a Development Permit for Operational Works in respect of roadworks and
stormwater drainage works. The design shall be in accordance with Council’s Planning
Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
44. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
45. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
6 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2007.00001447.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 75 KB (small file)
- File type
No other editions are linked here.