Minor Change Existing Approval - DBW19 0003.02 (As Published)
Officer: Matthew Pinese
Direct Telephone: 07 5329 6245
Our Reference: DBW19/0003.02
Your Reference: 0704
23 May 2025
CP Clout & D Clout
C/- Pivotal Perspective Pty Ltd
3/93 Hilton Tce
TEWANTIN QLD 4565
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 22 October 2024, requesting a minor change to an existing
development approval. Council decided your requested changes.
Details of the decision are as follows:
1. APPLICATION DETAILS
Application No: DBW19/0003.02
Street address: 11 Crusoe Ct, Castaways Beach Qld 4567
Real property description: Lot 98 MCH 807481
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
The following type of approval was issued on 25 October 2019
• Development Permit for Building Work - Additions to Detached House (Coastal Protection)
In relation to the request to make a minor change to the existing approval, Council on 19 May 2025,
decided to approve the requested changes. The changes are detailed below.
A. Approve the change.
B. Amend condition 5.
C. Include the following additional conditions: 25 & 26.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
ABN 97.969.214.121 PO Box 141
noosa.qld.gov.au Tewantin QLD 4565
[email protected] 07 5329 6500
Page 1 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
4. ASSESSMENT MANAGER CONDITIONS
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
C0.0 - Services, drawn by Chris Clout Design 11.10.19
C1.0 - Lower Floor Plan, drawn by Chris Clout 11.10.19
Design
C2.0 - Ground Floor Plan, drawn by Chris Clout 11.10.19
Design
C3.0 - Upper Floor Plan, drawn by Chris Clout 11.10.19
Design
C4.0 - Roof Plan, drawn by Chris Clout Design 11.10.19
C5.0 - Elevations, drawn by Chris Clout Design 11.10.19
C6.0 - Elevations, drawn by Chris Clout Design 11.10.19
C7.0 - Section, drawn by Chris Clout Design 11.10.19
Building Height
3. The maximum height of the development must not exceed 8 metres above the finished
ground level and the natural ground surface.
4. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Currency Period
5. The Currency Period for this development approval lapses if all conditions have not been
complied with by 1 November 2026, unless an application to extend the currency period is
approved by Council.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Page 2 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
Page 3
Pavilion structure
7. The Pavilion structure located with a zero setback to the northern boundary must be setback
a minimum of 1.5 metres from the northern side boundary and 6 metres from the front
boundary.
External Earthworks
8. Earthworks external of the building at the location of the bathroom and bedrooms on the
south elevation must be backfilled and reinstated to natural ground level, so as the building
does not appear as three storeys.
Privacy - Roof Top Terraces
9. Roof top terraces must not overlook the private open space areas of neighbouring properties.
Landscaping
10. A minimum of 20% of the site must be retained as soft landscaping.
11. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling. In this regard, the removal of vegetation must not
extend beyond 3 metres of the building footprint.
12. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
13. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
14. Screening vegetation must be planted along the northern boundary between the pavilion
structure and the property boundary in accordance with Council’s Planning Scheme Policy
PSP3 Landscaping Plants and Guidelines. The planted vegetation must have a minimum pot
size of 45 litres and consist of native, endemic species with a mature height of not less than
4 metres and maximum spacing of 1.5 metre centres.
Coastal Protection
15. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment, as detailed in the approved plans.
16. A mix of native landscaping, such as ground covers, shrubs and trees, must be
provided/retained for a width of 5m from the rear boundary of the site. Plantings must be in
accordance with Councils Planning Scheme Policy PSP03 Landscaping plants and
guidelines.
Site Access and Driveways
17. A sealed access driveway must be provided from Crusoe Court to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
Council’s standard drawings and a Council standard vehicle crossover approval.
Stormwater Drainage
18. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be constructed
generally in accordance with the drawing titled Stormwater Management Plan, CC03.002
prepared by Construction Hydraulic dated 8 March 2019.
Page 3 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
Page 4
Earthworks and Retaining Walls
19. Earthworks carried out on site must not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site.
20. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
21. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
Geotechnical Stability
22. All works must be carried out in accordance with the recommendations contained in:
a. The Slope Stability Assessment, report number 28158(SL) prepared by SCG
Consulting Engineers dated 1 March 2019, and
b. The Soil Test and Footing Report, report number 28158(S). RevA prepared by SCG
Consulting Engineers dated 7 March 2019.
23. At the completion of the works certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with the
recommendations contained in The Slope Stability Assessment, report number 28158(SL)
prepared by SCG Consulting Engineers dated 1 March 2019 and The Soil Test and Footing
Report, report number 28158(S).RevA prepared by SCG Consulting Engineers dated 7
March 2019 and that the development has a minimum factor of safety against landslip of 1.5
in the long term.
*(Refer to advisory Note)
Damage to Services and Assets
24. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
25. All lighting must be positioned and managed to reduce sky glow and light spill onto the beach
to minimise disruption to turtle nesting and sea-finding behaviour of hatchlings. The following
must be undertaken:
a. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must have 15% visible light transmittance tinting.
b. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must be fitted with opaque blinds, to be drawn from 8pm during turtle nesting and
hatching season (October – May).
c. All outdoor lights must have a maximum of 2700 K correlated colour temperature
(CCT). All indoor lights must have a maximum of 3000 K CCT. All lighting (interior and
exterior) must avoid the use of halogen, metal halide, or fluorescent lights.
d. Amber LED (590-610 nm) or low pressure sodium lighting must be used as a standard.
Warm white is to be used only where colour rendition is required. LED lights must not
contain short wavelength blue light and supplier should be asked to provide spectral
power curve of requested LEDs to prove the absence of short wavelengths.
e. The number and wattage of lights must be minimised.
Page 4 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
Page 5
f. All lights must be recessed into structures and roof, and directed away from the turtle
nesting habitat.
g. No lighting is permitted on the roof of the building.
h. All outdoor lights, including balcony lights, must be turned off between 8:00pm and
sunrise during turtle nesting and hatching season (October – May).
i. External feature lighting to the building must be positioned below 8 metres in height
and turned off between 8:00 pm and sunrise during turtle nesting and hatching season
(October – May).
j. No upward lights or vertical illumination of the building, vegetation or other structures
using lighting that shines into the sky to be used.
k. Where lighting is required for safety purposes (including all corridors above ground
level, stairwells, entry points etc.), the lighting of these areas must be activated by
proximity sensors or motion detectors with an associated deactivation of the lighting
after no more than 10 minutes during turtle nesting and hatching season (October –
May). For lighting in other areas, timers, proximity or motion activated light sensors
must be used wherever possible.
l. No decorative outdoor lighting is to be fitted to the buildings, open space or recreation
areas (e.g. Fairy/Christmas lights) during nesting and hatching season (October –
May).
m. Pool lighting must be switched off after 8:00pm during nesting and hatching season
(October – May).
n. All exterior lighting must be shielded by a minimum of 30 cm vertical shielding.
26. Certification must be submitted to Council which certifies that the lighting requirements of
this Decision Notice have been met.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Qualified Person
1. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
Page 5 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
Page 6
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building works
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
12. OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at
www.noosa.qld.gov.au or at Council Offices.
Yours faithfully,
Matt Pinese
Development Planner
Enc:
Appeal Rights
Approved Plans/Documents
DECISION NOTICE HISTORY
• Original Decision Notice – 25 October 2019.
• Decision Notice – Extension to Currency Period – DBW19/0003.01
– 8 January 2024, with an amendment to condition 5
• Decision Notice – Extension to Currency Period – DBW19/0003.02
– 19 May 2025, with an amendment to condition 5 and additional
conditions 25 & 26.
Page 6 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025
Page 7
Appeal Rights
PLANNING ACT 2016 & PLANNING REGULATION 2017
Chapter 6 Dispute resolution (3) The appellant or, for an appeal to a tribunal, the registrar must,
within the service period, give a copy of the notice of appeal to –
Part 1 Appeal rights
(a) the respondent for the appeal; and
229 Appeals to tribunal or P&E Court
(b) each co-respondent for the appeal; and
(1) Schedule 1 of the Planning Act 2016 states –
(c) for an appeal about a development application under schedule
(a) Matters that may be appealed to –
1, table 1, item 1 – each principal submitter for the
(i) either a tribunal or the P&E Court; or development application; and
(ii) only a tribunal; or (d) for and appeal about a change application under schedule 1,
table 1, item 2 – each principal submitter for the change
(iii) only the P&E Court; and
application; and
(b) The person-
(e) each person who may elect to become a co-respondent for the
(i) who may appeal a matter (the appellant); and appeal, other than an eligible submitter who is not a principal
submitter in an appeal under paragraph (c) or (d); and
(ii) who is a respondent in an appeal of the matter; and
(f) for an appeal to the P&E Court – the chief executive; and
(iii) who is a co-respondent in an appeal of the matter; and
(g) for an appeal to a tribunal under another Act – any other
(iv) who may elect to be a co-respondent in an appeal of the
person who the registrar considers appropriate.
matter.
(4) The service period is –
(2) An appellant may start an appeal within the appeal period.
(a) if a submitter or advice agency started the appeal in the P&E
(3) The appeal period is –
Court – 2 business days after the appeal has started; or
(a) for an appeal by a building advisory agency – 10 business
(b) otherwise – 10 business days after the appeal is started.
days after a decision notice for the decision is given to the
agency; or (5) A notice of appeal given to a person who may elect to be a co-
respondent must state the effect of subsection (6).
(b) for an appeal against a deemed refusal – at any time after the
deemed refusal happens; or (6) A person elects to be a co-respondent by filing a notice of election,
in the approved form, within 10 business days after the notice of
(c) for an appeal against a decision of the Minister, under chapter
appeal is given to the person.
7, part 4, to register premises or to renew the registration of
premises – 20 business days after a notice us published under 231 Other appeals
section 269(3)(a) or (4); or
(1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
(d) for an appeal against an infrastructure charges notice – 20 the Supreme Court decides a decision or other matter under this
business days after the infrastructure charges notice is given Act is affected by jurisdictional error, the decision or matter is non-
to the person; or appealable.
(e) for an appeal about a deemed approval of a development (2) The Judicial Review Act 1991, part 5 applies to the decision or
application for which a decision notice has not been given – matter to the extent it is affected by jurisdictional error.
30 business days after the applicant gives the deemed
(3) A person who, but for subsection (1) could have made an
approval notice to the assessment manager; or
application under the Judicial Review Act 1991 in relation to the
(f) for any other appeal – 20 business days after a notice of the decision or matter, may apply under part 4 of that Act for a
decision for the matter, including an enforcement notice, is statement of reasons in relation to the decision or matter.
given to the person.
(4) In this section –
Note – decision includes-
See the P&E Court Act for the court’s power to extend the appeal
(a) conduct engaged in for the purpose of making a decision; and
period.
(b) other conduct that relates to the making of a decision; and
(4) Each respondent and co-respondent for an appeal may be heard
in the appeal. (c) the making of a decision or failure to make a decision; and
(5) If an appeal is only about a referral agency’s response, the (d) a purported decision; and
assessment manager may apply to the tribunal or P&E Court to
(e) a deemed refusal.
withdraw from the appeal.
non-appealable, for a decision or matter, means the decision or
(6) To remove any doubt. It is declared that an appeal against an
matter-
infrastructure charges notice must not be about-
(a) is final and conclusive; and
(a) the adopted charge itself; or
(b) may not be challenged, appealed against, reviewed, quashed,
(b) for a decision about an offset or refund-
set aside or called into question in any other way under the
(i) the establishment cost of trunk infrastructure identified in Judicial Review Act 1991 or otherwise, whether by the
a LGIP; or Supreme Court, another court, a tribunal or another entity; and
(ii) the cost of infrastructure decided using the method (c) is not subject to any declaratory, injunctive or other order of
included in the local government’s charges resolution. the Supreme Court, another court, a tribunal or another entity
on any ground.
230 Notice of appeal
232 Rules of the P&E Court
(1) An appellant starts an appeal by lodging, with the registrar of the
tribunal or P&E Court, a notice of appeal that- (1) A person who is appealing to the P&E Court must comply with the
rules of the court that apply to the appeal.
(a) is in the approved form; and
(b) succinctly states the grounds of the appeal. (2) However, the P&E Court may hear and decide an appeal even if
the person has not complied with the rules of the P&E Court
(2) The notice of appeal must be accompanied by the required fee.
Page 7 of 7
Document Set ID: 23752696