Minor Change Existing Approval - DBW19 0003.02 (As Published)
Earthworks and Retaining Walls
19. Earthworks carried out on site must not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site.
20. All earthworks and associated retaining structures/batters must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
21. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height.
Geotechnical Stability
22. All works must be carried out in accordance with the recommendations contained in:
a. The Slope Stability Assessment, report number 28158(SL) prepared by SCG
Consulting Engineers dated 1 March 2019, and
b. The Soil Test and Footing Report, report number 28158(S). RevA prepared by SCG
Consulting Engineers dated 7 March 2019.
23. At the completion of the works certification must be submitted to Council from a qualified
person* which certifies that the development has been constructed in accordance with the
recommendations contained in The Slope Stability Assessment, report number 28158(SL)
prepared by SCG Consulting Engineers dated 1 March 2019 and The Soil Test and Footing
Report, report number 28158(S).RevA prepared by SCG Consulting Engineers dated 7
March 2019 and that the development has a minimum factor of safety against landslip of 1.5
in the long term.
*(Refer to advisory Note)
Damage to Services and Assets
24. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
25. All lighting must be positioned and managed to reduce sky glow and light spill onto the beach
to minimise disruption to turtle nesting and sea-finding behaviour of hatchlings. The following
must be undertaken:
a. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must have 15% visible light transmittance tinting.
b. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must be fitted with opaque blinds, to be drawn from 8pm during turtle nesting and
hatching season (October – May).
c. All outdoor lights must have a maximum of 2700 K correlated colour temperature
(CCT). All indoor lights must have a maximum of 3000 K CCT. All lighting (interior and
exterior) must avoid the use of halogen, metal halide, or fluorescent lights.
d. Amber LED (590-610 nm) or low pressure sodium lighting must be used as a standard.
Warm white is to be used only where colour rendition is required. LED lights must not
contain short wavelength blue light and supplier should be asked to provide spectral
power curve of requested LEDs to prove the absence of short wavelengths.
e. The number and wattage of lights must be minimised.
Page 4 of 7
Document Set ID: 23752696
Version: 4, Version Date: 23/05/2025