TOOC
civil & structural engineers

TOD CONSULTING PTY LTD         DIRECTORS                                      20 Mary Street Noosaville QLD 4566
ABN 39 128 805 336             S Prystupa BE., M.I.E.Aust C.P.Eng, R.P.E.Q.   PO Box 61 Noosaville QLD 4566
                               C Dowding BE., M.I.E.Aust R.P.E.Q.             P 07 5449 9600
                               D Reynolds BE., M.I.P.W.E.Aust. R.P.E.Q.       F 07 5449 9494
                                                                              E [email protected]
                                                                              www.todconsulting.com
          SPAS 10525-5
          YOUR REF: ML011:MWL:OPW11/0335
          27 January 2012

          The Chief Executive Officer
          Sunshine Coast Council
          Locked Bag 72
          SCMC QLD 4560

          ATTENTION: Mark Lewis

          Dear Sir

          RE:    INFORMATION REQUEST OPW 11/0335 -
                 ESSENCE OF PEREGIAN

          Please find attached 3 copies of information requested as follows:-

              Items 1-7 have been addressed by Simmonds & Bristow's joint report with
              Sunshine Coast Regional Council dated January 2012

          •   Items 8-11 have been addressed on Tod Consulting's drawings 10525 - C1 F,
              C2G, C3H, C4G, C5E, C6E, C7F & C8A

          •   Items 12, 18 & 19 have been addressed by Spice Consulting Hydraulic
              consultants - refer drawings 964 - OP1 G, OP2G & OP4D

          •   Items 13-17 have been addressed by Anembo Consultants landscape
              architecture - all as detailed on their drawings LD1 - sheets 1-16

          We look forward to receiving a Development Permit for Operational Works for the
          Essence of Peregian project in due course.

          Please do not hesitate to contact the writer should you require any further
          information.


          Yours faithfully

                                                                                                     ^IAC
          STEFAN PRYSTUPA
          TOD CONSULTING                                                           PL-4 11 /053S
Full text of pages 2 to 65 (of 97)

Page 2

Scanlon Property Group -v- Sunshine Coast Regional Council & ORS
Essence of Peregian
Review of Sediment & Erosion Control & Stormwater Management of Essence
of Peregian

Joint Expert Report on Stormwater Management between Neil Collins for
Sunshine Coast Regional Council and David Bristow for Essence of Peregian.

This report is based on a meeting held on Friday 13 January 2012 at Simmonds and
Bristow Office between Neil Collins and David Bristow.

STATEMENT TO COURT

We, the undersigned, hereby acknowledge that we have been instructed on an
expert's duty to assist the Court and that, that duty overrides any obligation we may
have to any party to the proceedings or to any person who is liable for our fees or
expenses.

We furthermore state that no instructions were given or accepted to adopt or reject
any particular opinion in preparing this report.

POINTS OF AGREEMENT

   1. The updated stormwater management plan reference 1108-155 cf-02,
      (revision 03 dated 13th January 2012) by Simmonds and Bristow is
      acceptable and appropriate and that, subject to suitable detailed design,
      construction and maintenance, will ensure appropriate water quality standard
      for runoff from the site.

       This plan includes the following drawings:
               Stormwater System: 1108-155C-01-01 -A
                                      1108-155C-01-02-C
                                      1108-155C-01-03-C
                                      1108-155C-01-04-C
                                      1108-155C-01-05-C
                                      1108-155C-01-06-A
               SCEP:                  1105-155C-01-07-A
                                      1105-155C-01-08-A

   2. An appropriate condition of approval that could be considered by Council over
      and above standard stormwater approval conditions as follows:

The detailed design shall be generally in accordance with the details provided in the
Simmonds and Bristow Stormwater Management Plan and Erosion Control Plan
(reference 1108-155 cf-02, version 03, dated 13 January 2012).

POINTS OF DISAGREEMENT

There are no Points of Disagreement




Neil Collins                                David Bristow
BEngCivil, MEngSc,MlEAust. RPEQ             BE(Chem) M/EAust, RPEQ,AFAim

13 January 2011

Page 3

                                                                                                                                                                                                                                      essence
(LENT DETAIS             AB NAME                 REVISpN S(NEDAAE                  OATUM             A.IW 1N.
                                                                                                                                                                                                                 DRAWN TITLE                       S(A(E

CONTRAST CONSTRUCTIONS   ESSENCE OF PEREGIAN
                                                                                                   s I//yl hrws M.hralhrS..1.
                                                                                                     er.d RnMr rrM1W 111/y.13 .Es A 1   Simmonds & Bristow Pty. Ltd.                                             SITE LOCATICi%
                         STORMWATER MANAGEMENT                                     DES)W0
                                                                                                     •.CAW.
                                                                                                     N UT SASE
                                                                                                                 .^ rI S$1
                                                                                                     idmWk W ft k. rM. at PWk
                                                                                                                                        WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS
                                                                                                                                                                                                                                                      DIGRAMATIC
                                                                                   DRAWN     TA                                                                                                                                                    AIIPROPoSAL NI
                         PLAN                                                      (HE(IED   DJB
                                                                                                        b"wAAhh w hialM
                                                                                                     l.^el. w..agyr i                   UAEGIIA:D ST[EI,IDEAEA tSI
                                                                                                                                                                                                                                                     1108-1550
                                                                                                                                        X SDS 3W R )IA DID 4Ih AVSI$A:IA                                         DIAWIGSTATUS                      DW41M.       REV.
                                                 A 19/12/1'INITIAL VERSION    T A SGNED.                                                PA onn1SN1
                                                                                                                                                                                                                                FOR INFORMATION
                                                 RE+I DATE I (OMMENTS        IKTL IDATE
                                                                                                                                        CAA 1610!716 1163       Helping you make ^ dean Water
                                                                                                                                                                                          A,
                                                                                                                                                                                           .
                                                                                                                                                                                                AC.N.010252410   P101 N"IR         DATE: 19/12/1   1108-1551-01-01 A

Page 4

      Simmonds & Bristow
3 Established 1965            ACN 010 252 418   Pty Ltd




      ESSENCE OF PEREGIAN

    Stormwater Management Plan

 Sediment and Erosion Control Plan




                   Prepared for

          Scanlon Property Group Pty Ltd




                 January 2012

Page 5

Document Control



                 Simmonds & Bristow
                  Established 1965         ACN 010 252 418    Pty Ltd


Originating Office:
40 Reginald Street                                PO Box 3160                                Ph: 07 3710 9100
Rocklea, Qld 4106                                 Yeron g a, Qld 4104                        Fax: 07 3710 9199
Job Ref Number                    1108-155C
Document Number                   1108-155Cf-02
Client                            Contrast Constructions
Client Contact                    Bradley Durkin


                                  Name                                   Signed                                  Date
                                 Terrence Allen BE(Chem)
Written by:                                                                              _                       13/01/2012
                                 David      Bristow    BE(Chem),
Reviewed by :                    lEAust, CPENG, RPEQ, FAIM.                                                      13/01/2012



Revision Histo
 Rev No.          Date             Author           Page(s)           Description / Revision                      Status
   00          14/12/2010         GE & AH                       Update to SWMP & SCEP                           Superseded
   01          07/09/2011         TA & GE                       Stage 1 Update to SWMP & SCEP                   Superseded
   02          09/12/2011           TA                             Revision of Stage 1 SWMP &                   Superseded
                                                                               SCEP
    03          13/01/2012            TA                           Revision of SCEP & SWMP                         Current
                                                                     following Experts Report




Disclaimer
The information contained in this document has been prepared specifically for our client named
above and as such its use is limited to the above project. Simmonds and Bristow accept no
responsibility to any third party who may use or rely upon this document or the information
contained within.

Whilst S&B have made every effort to ensure the accuracy of the information contained within
this document it may include typographical errors and may be changed or updated without
notice.

©2010 Simmonds and Bristow Pty Ltd All Rights Reserved. Copyright in the whole and part of this document
belongs to Simmonds and Bristow Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or
in part without the prior written consent of Simmonds and Bristow Pty Ltd.




©2012 Simmonds & Bristow Pty Ltd                    Contrast Constructions                      1108-155C - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_ScanIon Property Group V3.0_ta_120113.doc

Page 6

                                                 EXECUTIVE SUMMARY

Simmonds and Bristow were commissioned by the Scanlon Property Group Pty Ltd to develop
a Stormwater Management Plan (SWMP) and Sediment Erosion Control Plan (SECP) for the
proposed Essence of Peregian development.

The SECP assessed the erosion hazard and risk based on the soil and topography of the
development site. The SECP provides information how to manage the erosion and off-site
export of soil from the development site, and a statement of the personnel responsible for
establishing and maintaining all erosion and sediment control measures.

The SWMP described the management of stormwater from the developed site and upslope
sources beyond the development area. The SWMP provided pre-development measurements
of water quality and soil parameters from the proposed development area, and computer model
outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with required
guideline standards. These standards were agreed at the Joint Experts Conference, and are
consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM
2009).

Plans that describe the stormwater treatment train (Appendix A) and outputs from computer
modelling used to support the stormwater design (Appendix B) are appended. These plans
show the proposed site layout, the location of bioretention trenches, wetlands, building areas,
plumbing layout, and the structure of bioretention trenches and wetlands within the
development area.

Procedures for maintaining stormwater treatment units (Appendix D) and implementing the
Sediment And Erosion Control Plan (Appendix C; Appendix E) are enclosed with this plan.
These procedures describe how to control erosion, and minimise off-site exports of sediment
and nutrients from the proposed development area, during the construction and post-
construction phases. A plan for monitoring water quality to demonstrate compliance with water
quality objectives is included.




©2010 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          1108-155C - 13 January 2012
I1CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3.0_ta_120113.doc

Page 7

                                 Contrast Constructions - Scanlon Property Group
                                               Essence of Peregian
                                           Stormwater Management Plan
                                        Sediment and Erosion Control Plan

                                                           Table of Contents

1.0           INTRODUCTION .............................................................................................................1
2.0           SITE LOCATION ............................................................................................................. 2
3.0           LOCAL ENVIRONMENT ................................................................................................ 3
  3.1         Site Features ................................................................................................................... 3
4.0           RECEIVING WATER QUALITY ......................................................................................5
5.0           SOILS INFORMATION ................................................................................................... 6
6.0           STORMWATER MANAGEMENT PLAN ........................................................................ 7
  6.1         Management of Stormwater ............................................................................................8
      6.1.1         Roof Water capture .................................................................................................. 8
      6.1.2         Vegetated Buffers ..................................................................................................... 8
      6.1.3         Bio-retention Trenches ............................................................................................. 8
      6.1.4         Terminal Wetland ..................................................................................................... 9
  6.2         Proposed Treatment Train .............................................................................................. 9
      6.2.1         Stage 1 - Southern Section (Only) ........................................................................... 9
      6.2.2         Stage 2 & 3 ............................................................................................................... 9
  6.3         Modelling of the Stormwater Treatment Train ............................................................... 10
      6.3.1         Existing Development .............................................................................................10
    6.3.2           Stage 1 Modelling ...................................................................................................10
    6.3.3           Full Development Modelling ...................................................................................11
7.0           LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES .... 12
8.0           SEDIMENT AND EROSION CONTROL PLAN                                                                                               13
9.0           INSTALLATION SEQUENCE .......................................................................................15
10.0          ENVIRONMENTAL IMPACT ASSESSMENT .............................................................. 16
11.0          MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS...... 18
  11.1        Water Quality Monitoring During Construction .............................................................. 19
  11.2        Water Quality Monitoring During Routine Operation of the Essence of Peregian......... 20
12.0          CONDITIONS AND LIMITATIONS ............................................................................... 21
13.0          COMPLIANCE CERTIFICATE .....................................................................................22
14.0          REFERENCES .............................................................................................................. 23




©2010 Simmonds & Bristow Ply Ltd                          Contrast Constructions                           1108-155C - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update109_Output Docurnents\1108-155C SWMP
SCEMP_Scanion Property Group_V3 0_ta_120113 doc

Page 8

                                                                APPENDICES

APPENDIX A               LAYOUT DRAWINGS
APPENDIX B               MUSIC MODELLING
APPENDIX C               SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
APPENDIX D               LONG TERM MAINTENANCE OF STORMWATER MANAGEMETN
                         FACILITIES
APPENDIX E               SEDIMENT AND EROSION MANAGAEMENT PLAN
APPENDIX F               SOIL AND WATER QUALITY SAMPLING MAP

                                                          TABLE OF FIGURES

Figure 1: General Location of the Proposed Development ...................................................................2

                                                             LIST OF TABLES


Table 1-1: Water Quality Design Objectives for Loads Reductions ......................................................3
Table 2-1: Water Quality Measured in the Terminal Wetland of the Existing Caravan Park Site........5
Table 3-1: The Quality of Surface Soil Measured In the Undeveloped Site ..........................................6
Table 3-2: The Quality of Surface Soil Measured In the Undeveloped Site ..........................................6
Table 4-1: Drawing List ...............................................................................................................................7
Table 6-2: MUSIC Model Results - Undeveloped Site ........................................................................... 10
Table 4-3: MUSIC Model Results - Stage 1 Site ..................................................................................... 11
Table 4-4: MUSIC Model Results - Fully Developed Site ...................................................................... 11
Table 5-1: Management Actions of the Essence of Peregian Stormwater Management Plan ......... 12
Table 6-1: Factors Contributing to Erosion Hazard .............................................................................. 13
Table 6-2: Sediment and Erosion Control for Construction of the Essence of Peregian ................. 14
Table 7-1: Installation Sequence for the Essence of Peregian Development .................................... 15
Table 8-1: Site Details of the Essence of Pereglan Development ....................................................... 16
Table 8-2: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions .................... 17
Table 9-1: Summary of Test Methods for Ambient Surface Waters .................................................... 18
Table 9-2: Location of Water Quality Monitoring at the Essence of Peregian Site ........................... 19
Table 9-3: Monitoring Schedule for the Construction and Operational Development ...................... 20




©2010 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          1108-155C - 13 January 2012
I\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3,0_ta_120113.doc

Page 9

1.0        INTRODUCTION

Simmonds and Bristow have been commissioned by Contrast Constructions and the Scanlon
Property Group Pty Ltd to develop a Stormwater Management Plan (SWMP) and Sediment &
Erosion Control Plan (SECP) for their re-development of the Peregian Caravan Park as the
Essence of Peregian.

The plans describe two development phases; the construction phase when building activity
disturbs the ground surface, which is described by the SECP, and the maintenance phase when
the development is fully built and operational is described by the SWMP. In addition, the
development will be constructed in three construction stages, with the stormwater infrastructure
being installed in two stages. A portion installed at 'Stage 1' to reflect the reduced development
installed at that stage, with the remainder of the stormwater management infrastructure installed
during stage 2 construction (for stages 2 and 3).

The intent of the plans is to protect the environmental values of receiving waters by minimising
the hydraulic disturbance and the load of contaminants in run-off from the development site.

The SECP develops an erosion hazard and risk assessment based on the soil and topography
of the development site. This plan identifies the environmental values of the receiving water
body, and any potential consequences that erosion of the development site might have on the
receiving water body. The SECP includes information on how to manage the erosion and off-
site export of soil from the development site, and a statement of the personnel responsible for
establishing and maintaining all erosion and sediment control measures.

The SWMP describes a treatment train design to manage stormwater from the site, which
includes overland flow across the site from upslope sources.        The SWMP is based on
assessments and MUSIC computer modelling of likely changes to annual stormwater sediment
and nutrient loads from the proposed development. The plan also provides information on
managing the stormwater treatment train, and a statement of the personnel responsible for this
management.

The plans are prepared in accordance with the Queensland Best Practice Environmental
Management Guidelines 2009. References were also made to other guidelines:

          • Introductory Erosion and Sediment Control Guidelines for Queensland Councils;
          • IECA Best Practice Sediment and Erosion Control;
          • Erosion & Sediment Control: A decade of lessons learnt; and
          • Controlling stormwater pollution on your building site.

This report directly follows from the conceptual SWMP and SECP report (J-0906-226: Essence
of Peregian: Stormwater Management Plan; Sediment and Erosion Control Plan).           The
conceptual SWP was modified by removing some of the process units from the stormwater
treatment train as follows:

          • Converting swales to hydraulic conduits and changing roof areas;
          • Vegetation in the bio-retention trenches changed from wetland plants to grass;
          • Consolidation of Northern and Mid section bio-retention trenches
          • Adjusting the size of the Constructed Wetlands.

The outcome was that suitable water quality could still be achieved with the modified treatment
system.




02012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113.doc                                                                           Page 1 of 24

Page 10

This report develops from the earlier conceptual report (J-0906-226) by adjusting maintenance
procedures to address the indicated changes. This report describes the SWMP, SECP,
Environmental Impact Assessment based on model results, and a water quality monitoring
program. This report also retains information presented in the conceptual report (J-0906-226)
about the site location, local environment, site features, overland flows, and soils.



2.0         SITE LOCATION

The development will be called "Essence of Peregian", and will be sited on Lots 8, 9 and 10 on
P 9315 and Lot 76 on MCH 2969, Parish of Weyba, County of March (Figure 1). These
allotments are collectively located at 215-219 David Low Way, Peregian Beach, with vehicle
access to the site being from an unnamed road that runs off David Low Way. The site is 23,131
m2 in area. The development proposal is for 2 accommodation buildings containing 32
Apartments, plus 30 beach shacks, and a commercial building containing, a retail/restaurant
area on ground level and an accommodation module on Level 1.

                             nr Int. 'Ltln
                                      •    Vowel od b y tit plnlo..                           r•    •: t1r                                 ^^75pa                        tv       n rl lty ^l.giUrfu
                                                                                                         86       5^7^
                                   q   tloosa                         2=21 191 71 513119 7    5 3 1 '•        `265                                                  i9
                   dawar>1in                                          '                                                                sot
                                       Heads                                624211U18    14    12   10        2          42                    ZX ^$^ 7S
                        aloosatrille
                                         o Sunshine Beach                  ^y                                              S^i"'SSS   292 176-- 11 3
                                                                          2r    23   aV 1 9 1715 151. 9                             . 250
                                                                                                                  S           +<7 7 A 24A t1 + 7
                                         O unnse Beach
                                                                                                                         3-7 253.295 2M 1 8
                                                                                                                               249    242   6                                 a
                                                                                                                                           247             2.7°
                                                                                                                                               243         211 6 4
                                                                                                                                                243              c,,
                                                                                                                                  11     241
                                                                                                                                                            21233 ,^,
                                                                                                                                       '37299
                                                                                                                                       237239               23
                                                                                                                                  13     235                2:6  18
                                                                                                                                         294                2;4 1

                                                                                                                                       221
                                                                                                              215                                           2

                                                                                                                                    219
                                                                                                                                                                    4
                                                                                                                                                                                  1 11
                                                                                                                                  215
                                                                                                                                  215                                   12
                                                                                                                                                 210 47

                                                                                                                              211                2p       A4 40.50
                                                                                                                          207                    040                u
                                                                                                                                               202 35
                                                                                                                                               %D
                                                                                                                              1                 ^3              3
                                                                                                                                           y96 + 1

                                                                                                                                       114                   31
                                                                                                                                       1
                                                                                                                                           1          t
                                   0 Marcoota
                                                                                                                                  1
                                                                                                                                       ,l , 9               4

Source: http //rrif.noosa.qld.gov.au/masterviewpublic/modules/mappingcontrol/default.aspx?page
                         Figure 1: General Location of the Proposed Development




©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage I Update\09_Output Documents\1108-155C_SWMP
SCEMP Scanlon Property Group_V3.0 ta_120113 doc                                                                            Page 2 of 24

Page 11

3.0         LOCAL ENVIRONMENT


The site is presently developed as a caravan park (the Peregian Beach Caravan Park) in the
Eastern Beaches Locality of the Noosa Shire Council planning scheme. The site is about 200m
west of the coastline on the western edge of the Peregian Beach village (Figure 1). Land uses
in the Peregian Beach Village area surrounding the proposed development site includes retail
and businesses, sporting facilities, a kindergarten, and the Noosa National Park.

The topography has an average grade of 3.6% (Brown Consulting, 2007) that slopes in a
westerly direction from the retail and business area on the east of the proposed development
site, across the site and towards the Noosa National Park. Visual inspection indicated that land
on the northern and southern boundaries slopes away from the proposed development site.
Therefore stormwater will not enter or leave the site in a northern or southern direction, but will
flow in a westerly direction from the upslope retail and business area, across the development,
and into a wetland buffer on the edge of the Noosa National Park.

About two thirds of the existing site is cleared for caravans and camping, and consists of mown
grass under a light canopy of Broad-leaved Paperbark (Melaleuca quinquenerva). Down-slope
of the cleared caravan park area is a densely grown strip of highly disturbed vegetation that
includes native and exotic species. Remnant native wet-heath vegetation grows along the
western boundary as an extension of the Noosa National Park (Natural Solutions, 2007). The
wet heath is the receiving environment for stormwater runoff.

For this development it was proposed that the treatment train comply with the Water Quality
Objectives for loads reductions required by the Queensland Water Quality Guidelines (DERM
2009) (Table 3-1). The loads reductions water quality design objectives are important because
stormwater flow is intermittent, with most export of sediment and nutrients occurring during a
few short rainfall events each year. Management needs to cover those few rainfall events, and
design objectives for annual load reductions accommodate for high stormwater-flow events.

                       Table 3-1: Water Quality Design Objectives for Loads Reductions
                       Indicator                           Water Quality Objectives
                  Suspended Solids                                                     80% reduction
                  Total Phosphorus                                                    60 % reduction
                    Total Nitrogen                                                    45 % reduction

3.1        Site Features

          The planned development seeks to change the use of the site from a caravan park to
          visitor accommodation (apartments and beach shacks), with commercial, retail and
          restaurant uses. The proposal includes two (2) accommodation buildings and thirty (30)
          beach shacks with two (2), three (3) or (4) four bedrooms. The commercial development
          will face David Low Way, and will provide a street level frontage of retailing and
          restaurant services, with an accommodation module on the upper level of the building.
          The proposal includes 140 car parking spaces and 8 motor cycle bays across the site,
          which are located under the accommodation and commercial buildings.

          Features of the apartments will be utilisation of aspect (passive solar access, natural
          ventilation of buildings), topography (stormwater management), and existing native
          vegetation. The resort will have a full-time site manager.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                         J-1005-310 - 13 January 2012
11CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update109_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3 0_1a_120113 doc                                                                          Page 3 of 24

Page 12

          The landscaping has been designed to maintain the unique natural context of the site,
          which abuts the Noosa National Park. An ecological analysis of the natural buffers to
          the wetlands adjacent to the national park has been conducted to protect the significant
          habitats of the national park and to ensure that stormwater runoff is properly managed to
          protect the ecological function of the wetland. Approximately one quarter of the
          development site has been allocated for environmental buffering (between 16 and 60 m
          in width), and weeds that presently exist in the buffer zone will be removed.

           The intensity of stormwater flows will be mitigated by a water storage tanks for each
           beach shack, and two (2) large underground water storage tanks for the apartment
           accommodation buildings, and one (1) large underground water storage tank for the
           commercial building. The captured water will be reused for non-potable domestic
           purposes (laundry, toilets), or for irrigation of the gardens. Stormwater will also be
           directed through a treatment train of Bio-retention Trenches with a gabion wall diffuser
           adjacent to the existing wetland area abutting the Noosa National Park. This treatment
           train is designed to achieve the water quality objectives listed in and Table 3-1.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0 ta_120113.doc                                                                           Page 4 of 24

Page 13

  4.0       RECEIVING WATER QUALITY


  Water quality in the terminal wetland was measured by Simmonds and Bristow on the 10th July
  2009, after rainfall and a stormwater flow event, to describe the existing physical-chemical and
  nutrient status of the receiving waters before the proposed Essence of Peregian development.
  A sample location map is shown in Appendix B. The existing water quality parameters (Table
  4-1) indicate that the water quality in the terminal wetland was poor for turbidity, suspended
  solids, total nitrogen and total phosphorus. Indicator concentrations that exceed the guideline
  concentrations based on the level 2 environmental values associated with the Noosa River:
  Environmental Values and Water Quality Objectives are highlighted in Table 4-1.

  The Essence of Peregian Stormwater design will install water sensitive urban design features to
  ensure that the quality of water entering the Noosa National Park is of better quality than that
  currently discharged.

  A map of the water quality sampling points has been included as Appendix F.

Table 4-1: Water Quality Measured in the Terminal Wetland of the Existing Caravan Park Site
   Water Quality Indicator                        QWQG          WS 01       WS 02       WS 03       WS 04       WS 05       WS 06

   Conductivity - on site (µS / cm)                              250          290         470         200         180         230

   pH - on site*                                    5-7           6.4         6.7         7.1         6.4         6.4         6.0

  Ammonia as N (mg / L)                             0.02        0.050        0.25        0.22        0.13        0.054       0.046

   Nitrate as N (mg / L)                             NA          0.01        0.04        0.06        0.04        0.01         0.04

   Nitrate + Nitrite as N (mg / L)                  0.06         0.02        0.05        0.07        0.05        0.02         0.04

   Nitrite as N (mg /L)                              NA         0.007       0.007        0.006       0.007       0.006       0.004

  Total Nitrogen as N (mg /L)                        0.5          11          31          43          9.7          11         0.7

  Total Phosphorus as P (mg / L)                    0.05          1.4         3.8         2.7         2.0         2.0         0.41

   Orthophosphate as P (mg / L)                     0.02         0.12        0.10        0.13        0.16        0.15        0.094

   Colour - True 0.45 µm (Pt-Co units)               NA          110          120         130         140         120          87

   Faecal Coliforms (CFU / 100 mL)                               160        16,200       1,120       1,800        720         <10

   Suspended Solids (mg / L)                          6          720         2500         900        1000        1200          26

  Turbidity - Raw (NTU)                              50          280         420          460         510         380          20
 * Joint Experts Conference indicated that the low pH water quality objective is suitable on the basis of the
 wallum/tannin stained character of the receiving waters.
 QWQG = Queensland Water Quality Guidelines.
 Water quality indicators that exceed the environmental values have bold font and shaded background.




 ©2012 Simmonds & Bristow Pty Ltd                        Contrast Constructions                          J-1005-310 - 13 January 2012
 11CLIENTFILES\Contrast Construdions11108-155c - Essence of Peregian SCEP Stage 1 Update109_Output Documents11108-155C_SWMP
 SCEMP_Scanlon Property Group_V3.0_ta,_120113.doc                                                                         Page 5 of 24

Page 14

5.0         SOILS INFORMATION

Soils testing undertaken by Butler Partners (2007) involved six (6) bores drilled to depths of 2.5
meters from across the site. Surface soils were described as fill (silty sand with sub-angular
gravel) over most of the development (particularly the lower slopes), with some silty sand
observed near the eastern margin. The depth of surface fill was 0.8m on the lowest slopes, and
was about 0.2m further upslope.

Soil under the surface fill was described as dark grey-brown silty clay or silty sand on the lowest
slopes (under the thick layer of surface fill), or light grey-grown fine sand under the 0.2m of fill
further upslope. The soil texture described by these tests were used to assess the soil erosion
hazard for the SECP by an Erosion Hazard Assessment Form (Queensland Best Practice
Environmental Management Guidelines 2009).

Butler and Partners (2007) identified acid sulphate soils at isolated locations, which will require
management and treatment to neutralise any net acidity if the soils are disturbed. The affected
soils are the dark grey-brown silty clay under the 0.8 m of fill adjacent to the wetland heath on
the western margin of the development site. Butler and Partners developed a draft Acid
Sulphate Soil Management Plan (appended in Butler and Partner, 2007).

The SECP does not propose the installation of sediment ponds to collect runoff from the
building site to avoid disturbing acid sulphate soil. Instead sediment fences have been
recommended, with filter socks at outlet points to remove suspended fine sediment from the
overflow (Appendix D). The same philosophy has been applied to the Bioretention Trenches
installed for the SWMP, which will be located within additional fill placed over the existing site,
thereby also avoiding the need for excavation and potential disturbance of acid sulphate soil.

Soil tests were also undertaken by Simmonds and Bristow on the 10th July 2009. Eleven
samples of surface soils (0 - 100 mm) were collected across the site area, from the road to the
edge of the field (refer to sample location map in Appendix B). The soils were analysed for
Loss on Ignition, Total Nitrogen, Total Phosphorus, pH, and Electrical Conductivity (Table 5-1).
These soils were slightly to strongly acidic, which lessens the availability of soil nutrients
available to plants. The soils had inherently low total nitrogen concentrations, and very low soil
salinity, based on these data.

Table 5-1: The Quality of Surface Soil Measured in the Undeveloped Site
                  Soil Quality Indicator                                SS2          SS3          SS4     SS5        SS6       SS7
Conductivity (1:5 soil : water extract) (µS/cm)                           76          23          26          19      32        29
Loss on Ignition at 450°C (%)                                            2.4         1.6          1.6         1.7     3.7       2.2
pH (1:5 soil : water extract)                                            6.6         5.6          5.4         5.4     5.6       5.5
Total Nitrogen as N (mg/kg)                                             4700         3600        3600     6900       5700     4200
Total Phosphorus as P (mg/kg)                                           1000         1100         580     1100       710       700

Table 5-2: The Quality of Surface Soil Measured in the Undeveloped Site
                    Soil Quality Indicator                                     SS8         SS9          SSIO        SS11     SS12
Conductivity (1:5 soil : water extract) (µS/cm)                                97           28           49          80        53
Loss on Ignition at 450°C (%)                                                  3.2          2.9         3.1         3.1        2.5
pH (1:5 soil: water extract)                                                   5.2          5.6         5.7         6.0        6.4
Total Nitrogen as N (mg/kg)                                                 9000           5100         3900        5900     2900
Total Phosphorus as P (mg/kg)                                                  840          720         1300        1100     1700



©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                           J-1005-310 -13 January 2012
I \CLIENTFILES\Contrast Constructions\1 108-155c - Essence of Peregian SCEP Stage 1 Update 09 Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 0_ta_120113.doc                                                                            Page 6 of 24

Page 15

 6.0        STORMWATER MANAGEMENT PLAN


The attached plans in Appendix A show the location of key features of the Essence of Peregian
SWMP, and the proposed control measures to manage stormwater across the developed site.
A list of these plans is provided in Table 6-1.

Table 6-1: Drawina List
       Drawing No                   Rev No               Date                                        Title

 1105-155C-01-01                        A             Dec 2011            Site Layout
                                                                         Proposed Stormwater Treatment Device
 1105-155C-01-02                        C             Jan 2012
                                                                         Details & Layout
                                                                         Proposed Pipe Routing and Catchment
 1105-155C-01-03                        C             Dec 2011
                                                                         Areas
                                                                         Bio-Retention Basin Layout and
 1105-155C-01-04                        C             Jan 2012
                                                                         Construction Details
                                                                         Bio-retention Basin Cross-Section and
1105-155C-01-05                         C             Jan 2012
                                                                         Construction Details
                                                                         Proposed Stormwater Treatment Train
1105-155C-01-06                         A             Jan 2012
                                                                         Details
                                                                         Erosion and Sediment Control Plan
1105-155C-01-07                         A             Dec 2011
                                                                         (ESCP) - Full Development
                                                                         Erosion and Sediment Control Plan
1105-1550-01-08                         A             Dec 2011
                                                                         (ESCP) - Sta g e I Develo pment

The Site Location (Drawing 01) shows site boundaries of the Essence of Peregian in relation to
the Noosa National Park to the west, and urban development to the north, south and east.

The Essence of Peregian development will install water sensitive urban design features. These
features will capture and hold stormwater in Rainwater Tanks and on the land, with held
rainwater being used for domestic purposes within the residential complex, or for irrigating the
gardens to ensure stable ground cover. Stable ground cover is an important feature of erosion
risk management. Overflow from the rainwater storage tanks will be directed to the site bio-
retention trenches.

Stormwater will be piped directly into Bio-retention Trenches, (Drawing 03 & Drawing 04) which
are depression storages designed to impede water flow. These features will be installed within
fill platforms placed over the existing landscape. The beds will be installed at between 3.0 -
3.5m, which is above the 100 year ARI flood level identified for the nearby Lake Weyba (RL
2.05m AHD) (Brown, 2007). After passing through the Bio-retention trenches, stormwater will
flow into the existing heath wetland on the site, (Drawing 05 & 06) which will act as a buffer to
the national park.

Overland flow will be diverted, via catch drains into the bio-retention trenches (Drawing 06), for
treatment.

The development site does not fall within the flood hazard area nominated by the Noosa
Council (Brown, 2007). The stormwater treatment train is designed to accommodate the most
intense stormwater event encountered during a 5 year interval described by the ARI records
(202 mm/hour over a 5 minute period) (Australian Government, Bureau of Meteorology).




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_output Documents\1108.155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113 doc                                                                            Page 7 Of 24

Page 16

6.1         Management of Stormwater

           This sub-section describes the treatment train (Drawings 02 & 06) used to manage
           stormwater flowing through the Essence of Peregian development. The treatment train
           is designed to keep stormwater within the landscape of the proposed development site.
           There are three treatment units in the design treatment train:

           6.1.1       Roof Water capture

           Guttering provides capture of the rainwater incident upon the roofs of the buildings
           within the development. 100% of the roof guttering is connected to rainwater tanks,
           which provide both rainwater storage for re-use within the development, and attenuation
           of stormwater flows.

           These tanks have been sized in line with MP-4.3 of the Queensland Building Code to
           meet water savings targets, and sized are as follows
              • Beach Shacks: 3 kL
              • Building A: 100 kL
              • Building B: 100 kL
              • Hotel/Commercial Area: 100k L

           These tanks are to be provided with appropriate inlet arrangements, including first-flush
           diverters. Overflow of the tanks are to be connected to the Bioretention basins for
           treatment before release to the receiving environment.

            6.1.2     Vegetated Buffers

          Vegetated buffers provide stable groundcover, thereby minimising the erosion potential
          of the landscape surface. Vegetation includes grassed surfaces and deep rooted
          vegetation. Energy from rainfall is dissipated over a broad, stable surface, and shallow
          sheet-flow of accumulated stormwater is slowed by the rough surface provided by the
          vegetation. The soil binding capacity of the plant roots, and the capacity of the plants to
          assimilate nutrients from infiltration water, provides the first step of the treatment train.
          Stormwater flows from the vegetated buffers into Bio-retention Trenches or directly into
          the Constructed Wetland System.

           6.1.3      Blo-retention Trenches

          The Bio-retention Trenches are generally dry, but during a stormwater flow the trenches
          may contain accumulated water to a depth of 200 mm, and 150 mm shortly thereafter
          when the trench is dewatering.

          Flow out of the Bio-retention Trenches is underground, with filtered water percolating
          through the base of the terminal gabion wall, through a readily permeable geotextile
          layer. Flow out of the Bio-retention Trenches during high flow will primarily be through,
          and across, the crest of the gabion weirs. Maximum flow depths over the weir crests in
          the 100 year local runoff event are estimated to be less than 25 mm. Outflow is towards
          the terminal Wetland.

          Overland sheet-flow for the majority of the development is to be piped from stormwater
          collection pits to the bio-retention basin. For the periphery, where it is not possible to
          use stormwater collection pits, an interceptor drain, essentially a grassed swale, will be
          used to capture and divert incident stormwater to the bio-retention basins for treatment.

          Pipe and swale entrances to the bio-retention basins are to use rock basins and energy
          diffuser arrays to protect against scouring (drawing 04 & 05).


©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09 Output Documents\1108-155C_SWMP
SCEMP_Scanion Property Group V3.O_ta_120113.doc                                                                           Page 8 of 24

Page 17

           6.1.4      Terminal Wetland

          The existing wet heath wetland is to act as a buffer to the Noosa National Park. The
          Wetland System provides an ecological barrier to pest flora entering the Noosa National
          Park.

6.2        Proposed Treatment Train

          This sub-section describes the proposed treatment train for stormwater management
          associated with the operating phase of the developed site.         The development is
          proposed to be completed in 3 stages. Specific stormwater control will be instated for
          Stage 1 only, with the remainder of the stormwater devices being installed at Stage 2 for
          both the Stage 2 and Stage 3 development.

          The treatment units include Rainwater Tanks, Vegetation Buffers, Bioretention Trenches
          and the Constructed Wetland System used to manage stormwater. The treatment train
          sequence is shown in Appendix B as follows:

           6.2.1      Stage I - Southern Section (Only)

          Southern Section

          1.    Direction of flow from the Commercial area (restaurant roof, tank) into Bio-retention
                C1a;
          2.    Direction of flow from the offsite commercial area, car-park and on-site commercial
                area (restaurant podium) into Bio-retention C1a
          3.    Direction of sheet flow from the southern catchment (the "South balance© into Bio-
                retention C1 b;
          4.    Direction of flow from shacks (roofs, tanks) into Bio-retention C1 b;
          5.    Direction of flow from bio-retention C 1 a to bio-retention C1b;
          6.    Direction of flow from Bio-retention C1 b into Terminal Wetland;
          7.    Capture of sheet-fow from the northern and mid catchments using a Swale or catch
                drain, directed to Bio-retention C1b

           6.2.2      Stage 2 & 3

          Northern Section

          1.    Direction of flow from the North balance into the Bio-retention Al;
          2.    Direction of flow from the roof and rainwater tank of Building A into Bio-retention Al;
          3.    Direction of flow from shacks (roofs, tanks) in the north section into Bio-retention Al;
                and
          4.    Direction of flow from the Bio-retention Al north trench into the Terminal Wetland

          Mid section

          1.    Direction of flow from the Mid balance into the Bio-retention B1;
          2.    Direction of flow from the roof and rainwater tank of Building B into Bio-retention 131;
          3.    Direction of flow from shacks (roofs, tanks) in the mid section into Bio-retention B1.
          4.    Direction of flow from the Bio-retention B1 mid trench into the Terminal Wetland;

          Stormwater that has passed through all these treatment units enters the receiving node
          (Appendix B). The design stormwater quality passing through the treatment units, as
          well as into the receiving node, for each stage of development, was modelled using
          MUSIC Version 4.

          Southern Section

©2012 Simmonds & Bristow Pty Ltd                        Contrast Constructions                          J-1005-310 - 13 January 2012
I\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_output Documents\1108-155C SWMP
SCEMP_Scanlon Property Group_V3.0 ta_120113.doc                                                                          Page 9 of 24

Page 18

           1.    As per stage 1, without the swale for the capture of sheet-flow from the northern
                 catchment areas

6.3         Modelling of the Stormwater Treatment Train

           Version 4 of the Model for Urban Stormwater Improvement Conceptualisation (MUSIC
           v4) has been utilised to predict the performance of the proposed stormwater treatment
           train. The use of Version 4 of the MUSIC model has been maintained due to the timing
           of the submission of the original application (prior to the release of Music V5). Modelling
           for both Stage 1 only and the complete development has been conducted to ensure that
           the proposed treatment system will be effective at all stages.

           Music model parameters have been developed and agreed to by the stormwater experts
           (David Bristow and Neil Collins) as part of the Planning and Environment court appeal
           (Appeal No: 2587 of 2008) concerning the development.

           In addition to load reduction predictions a 'no worsening' case has been applied,
           comparing the predicted discharge from the undeveloped site with the development
           stages.

            6.3.1      Existing Development

           The site is presently developed as a caravan park (the Peregian Beach Caravan Park),
           with approximately two thirds of the existing site being cleared for caravans and
           camping, consisting of mown grass under a light canopy of Broad-leaved Paperbark
           (Melaletica quinquenerva).

           Land uses in the Peregian Beach Village area surrounding the proposed development
           site includes retail and businesses, sporting facilities, a kindergarten, and the Noosa
           National Park.

           There is currently no stormwater quality improvement or treatment devices installed at
           the existing caravan park. Modelling has been conducted to provide a baseline to allow
           the comparison of the performance of the developed stormwater system to the existing
           case. The stormwater system must achieve both the quality objectives in Table 3-1 and
           a no worsening' of pollutant loads on the national park.

           Table 6-2: MUSIC Model Results - Undeveloped Site
                            Water Quality Indicator                                                     Result
            Estimated long-term load (kg/year)                                        % reduction               Load (kg/year)
            Suspended Solids                                                                 0                        2170
            Total Phosphorus                                                                 0                          5.1
            Total Nitrogen                                                                   0                          30

           6.3.2      Stage I Modelling

          Results of MUSIC modelling showed that there will be no net increase in stormwater
          runoff from the site. Loads of sediment, total nitrogen and total phosphorus will be
          substantially removed from stormwater before entering the Noosa National Park
          (Appendix B).

          Modelling for the Stage 1 development predicted a 15% reduction in stormwater entering
          Noosa National Park, from 13.1 ML/year to 11.1 ML/year. The annual load of total
          suspended solids from the existing site (the caravan park) was predicted to be

©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Cons1rudions11 108-155c - Essence of Peregian SCEP Stage 1 Update109_Output Documents\1 108.155C_SWMP
SCEMP_Scanlon Property Group_V3 0_ta_120113 doc                                                                            Page 10 of 24

Page 19

          approximately 2500 kg/year, whereas the annual load from stage 1 of the developed site
          is reduced to 77 kg/year (Appendix B). Likewise, annual loads for total nitrogen reduce
          from 34 kg/year to 18.1 kg/year and the annual load for total phosphorus reduces from
          5.9kg/year to 1.81 kg/year (Appendix B).

          Water Quality predictions from the MUSIC model (Appendix B) indicate that
          contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
          from the Stage 1 developed site (Table 6-3) comply with the required water quality
          objectives (Table 3-1) and are not worse than the existing case (Table 6-2).


          Table 6-3: MUSIC Model Results - Staae 1 Site
                           Water Quality Indicator                                                    Result
            Estimated long-term load (kg/year)                                      % reduction               Load (kg/year)
            Suspended Solids                                                               77                         567
            Total Phosphorus                                                               69                        1.81
            Total Nitrogen                                                                 46                        18.1

           6.3.3      Full Development Modelling

          Results of MUSIC modelling showed that there will be no net increase in stormwater
          runoff from the site. Loads of sediment, total nitrogen and total phosphorus will be
          substantially removed from stormwater before entering the Noosa National Park
          (Appendix B).

          Modelling for the fully developed site predicted a 30 reduction in stormwater entering
          Noosa National Park, from 19 ML/year to 13.3 ML/year. The annual load of total
          suspended solids from the existing site (the caravan park) was predicted to be
          approximately 2500 kg/year, whereas the annual load from the fully developed site is
          451 kg/year (Appendix B). Likewise, the annual load for total nitrogen reduces from 34
          kg/year to 20 kg/year and the annual load for total phosphorus reduces from 5.9kg/year
          to 1.8 kg/year (Appendix B).

          Water Quality predictions from the MUSIC model (Appendix B) indicate that
          contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
          from the developed site (Table 6-4) comply with the required water quality objectives
          (Table 3-1) and are not worse than the existing case (Table 6-2).

          Table 6-4: MUSIC Model Results - Fully Developed Site
                          Water Quality Indicator                                                    Result
           Estimated long-term load (kg/year)                                      % reduction                Load (kg/year)
           Suspended Solids                                                               88                         451
           Total Phosphorus                                                               79                         1.79
           Total Nitrogen                                                                 56                         20.3




02012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113.doc                                                                          Page 11 of 24

Page 20

 7.0        LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES
 Management actions for keeping the treatment train in working order are listed in Table 7-1, and
 are described in detail in Appendix D. The maintenance actions required do not vary between
 Stage 1 and the ultimate development. Management of stormwater during the construction
 phase will be covered by the Sediment and Erosion Control Plan.

Table 7-1: Management Actions of the Essence of Pereoian Stormwater Management Plan
       Management                                                           Description
         Action
                                 Maintaining the 3kL rainwater tank volumes associated with each beach
        EP-SMP-01
                                 shack
                                 Maintaining the 100kL underground rainwater tanks associated with the
        EP-SMP-02
                                 ornamental garden irrigation scheme
        EP-SMP-03                Maintaining the vegetated buffer zones
        EP-SMP-04                Irrigating the ornamental gardens
        EP-SMP-05                Maintaining the bio-retention trenches
        EP-SMP-06                Maintaining the pipe infrastructure
        EP-SMP-07                Maintaining the terminal wetland




©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1005-310 - 13 January 2012
I.\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 0_ta_120113 doc                                                                           Page 12 of 24

Page 21

8.0        SEDIMENT AND EROSION CONTROL PLAN


The Noosa River: Environmental Values and Water Quality Objectives state that the
environmental values associated with the Noosa River Wetlands include aquatic ecosystem
protection, and cultural and spiritual values. Because Noosa National Park is a protected area,
these values require a high level of protection (level 1 protection).

However the wetland adjacent to Noosa National Park is a disturbed ecosystem, as indicated
by measured water quality parameters (Table 4-1). The existing caravan park development
appears to be placing pressures on this wetland. The treatment train built for the proposed
Essence of Peregian development is designed to improve the quality of water entering the
wetland, and therefore, the water quality of the wetland. The target water quality objectives of
stormwater entering the wetland are listed in Table 3-1.

During the construction of the Essence of Peregian development, there is a hazard that
disturbed soil might be carried into the wetland by stormwater. In particular, fine sediment
mobilised by stormwater will potentially carry nutrients into the wetland. The likely consequence
of this is increased nutrient availability to weeds, with potential negative consequences for the
adjacent Noosa National Park ecosystem.

Assessment of the Queensland Best Practice Environmental Management Guidelines (DERM,
2009) checklist (Table 8-1), shows that overall there is a high erosion hazard for this site. This
hazard is directly affected by soil type (particularly imported fill on lower slopes), the need to
reshape the ground surface to install structures, and the anticipated duration of site disturbance
being 3 to 6 months. The hazard is greater during the wet season between November and July
when the average monthly rainfall is expected to be above 100 mm.

Table 8-1: Factors Contributing to Erosion Hazard
                                          Erosion Hazard Assessment Form
 Controlling Factor                                                           Points                             Score
 Average Slope of Whole Site                                                      1                                  1
 Soil type being disturbed                                                     2 or 5                             3 or 6
 Anticipated duration of site disturbance                                         5                              8 or 11
  Erosive rainfall risk during site disturbance                     1 between Aug - Oct;
                                                                                                             9 or up to 13
                                                                    2 between Nov - Jul.
 Off-site sediment control (downslope of soil
                                                                                  0                          9 or up to 13
 disturbance)
  Run-off entering the site                                                       0                          9 or up to 13
  Extent of site disturbance                                                      2                         11 or up to 15
 Total Score                                                                  11 -15                    High Erosion Risk

By implementing sediment and erosion controls, it is possible to moderate the erosion hazard.
This includes protective covering of disturbed soils (particularly on erosion prone parts of the
landscape, and when rain is expected), scheduling work to avoid the highest rainfall risk period,
installing upslope diversion of runoff away from soil disturbance, and installing purpose built
sediment control traps down-slope of the soil disturbance.

The SECP has identified construction site best practices for managing sediment erosion and
control. A daily site check-list will be used to ensure that building contractors are cognizant of
and performing the required management actions. This check-list is attached in Appendix C.



©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1 005-310 - 13 January 2012
1:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 0 ta_120113.doc                                                                           Page 13 of 24

Page 22

The SECP also coordinates stormwater management with construction milestones, for effective
implementation of sediment erosion and control measures during the construction phase.

The plan layout of the SECP in the proposed development area is shown in Drawings 1108-
155C-01-07 and 1108-055C-01-08 (Appendix E), which shows where erosion management
structures need to be placed during construction activities. Slope-related erosion hazard areas
within the development site were identified from the topographic map (Drawing J-1005-310-09
in Appendix C), and represent control points within the construction site where particular care
will be needed. The management actions for controlling erosion of the site, and movement of
sediment and nutrients from the site, are described in Table 8-2. The detail management plans
for sediment and erosion control are described in Appendix E.

Table 8-2: Sediment and Erosion Control for Construction of the Essence of Pereaian
    Management Action                                                        Description
  EP-SECP-01                           Up-slope stormwater flow diversion.
  EP-SECP-02                           Site entry and exit points.
  EP-SECP-03                           Designated on-site stockpiles and waste receptacles.
  EP-SECP-04                           Down slope sediment controls.
  EP-SECP-05                           Maintaining ground cover.




©2012 Simmonds & Bristow Pty Ltd                        Contrast Constructions                           J-1005-310 -13 January 2012
1 1CLIENTFILES1Contrast Constructions11108-155c - Essence of Peregian SCEP Stage 1 Update109 Output Documents\1108-155C SWMP
SCEMP_Scanbn Property Group V3.O_ta_120113.doc                                                                           Page 14 of 24

Page 23

9.0        INSTALLATION SEQUENCE


The installation sequence refers to implementation of the sediment and erosion controls during
construction. The installation sequence described in Table 9-1 includes management actions
detailed in EP-SECP-01 to -05 (Appendix D).

            Table 9-1: Installation Sequence for the Essence of Pereaian Development
               Item                Drawing             Installed               Removed
Mark out initial limits of
                                           Appendix D             Before site disturbance.
disturbance
Install upslope flow
diversions around area of
                                                                                                           After surface ground
disturbance, and down-                     Appendix D             Before site disturbance.
                                                                                                           cover is established .
slope sediment control
points
Install access point on un-
named road off David Low                   Appendix D              Initiation of the project
Way
Clear access track                         Appendix D           Before installing site office.
Clear stockpile area                       Appendix D           Before installing site office.
Install site office                        Appendix D             Before building activity.
Install waste areas and
                                                                                                          After building activity
stockpile sediment and                     Appendix D             Before building activity.
                                                                                                               is complete.
erosion controls.
                                                                   After flow diversions,
                                                                     sediment control
Building activity.                         Appendix D            structures, access track,
                                                                  stockpile area, and site
                                                                office have been installed.
                                                                Re-establish ground cover
Install surface ground                                          in development sub-areas
                                           Appendix D
cover (gardens)                                                    within 2 weeks after
                                                                       disturbance.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\7108-155c - Essence of Peregian SCEP Stage 1 Update\09 Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3 O_ta_120113 doc                                                                           Page 15 of 24

Page 24

10.0        ENVIRONMENTAL IMPACT ASSESSMENT

The environmental impact of stormwater from the development was assessed using the
accepted solutions for managing stormwater quality in South East Queensland. The Water
Sensitive Urban Design Deemed to Comply Solutions for South East Queensland (henceforth
termed "the Solutions") outlines a seven step process for selecting and designing stormwater
management solutions, to achieve the stormwater management outcomes required by the
Department of Environment and Resource Management (DERM) (2009). The Solutions identify
acceptable solutions for "common" development scenarios to meet design objectives, which
are:

1) Stormwater Quality: Limiting the quantity of pollutants by adopting a best practices pollutant
load reduction approach, with consideration of the local climate.

2) Waterway Stability: Controlling the magnitude and duration of stormwater flows, to prevent
exacerbated in-stream erosion downstream of the development.

3) Frequent Flow: The hydraulic disturbance of in-stream ecosystems is similar to the pre-
development condition, which is achieved by capturing the initial portion of runoff from
impervious areas.

The proposed Essence of Peregian development will be in the Sunshine Coast Regional
Council jurisdiction, which is in the North Coast climate region of South East Queensland. The
proposed development type is residential land use, with a scenario of residential development
greater than 2 lots up to 20 lots. The residential development scenario can include commercial
development of high-density, multiple dwelling buildings at a scale of s 12,500 m2. This
scenario applies to the "Essence of Peregian" development inclusive of the 6,970 m2
commercial node.

The site details of the Essence of Peregian Development are presented on the annotated site
details plan (Appendix C), and summarized in Table 10-1.

                   Table 10-1: Site Details of the Essence of Perealan Development
             Site Detail                                                        Description
                                           The average grade is 3.6%, with a preferred flow pathway from
Existing Topography
                                           east to west across the development.
Existing Drainage                          There are no significant existing drainages in the proposed
Characteristics                            development area.
Proposed Discharge Points                  A proposed stormwater drainage has been designed for this
and Invert Levels                          development (refer to plan drawings in Appendix A).
                                           The surface and sub-surface soils of the proposed development
                                           area include imported fill, silty-clay, silty-sand, and fine sand.
                                           The surface soils are acidic, with low nitrogen concentration and
Soils
                                           very low salinity. Acid sulphate soils may occur in the sub-
                                           surface, but these soils will not be excavated or disturbed
                                           because additional fill will be placed over them.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
1:1CLIENTFILES\Contrast Constructions11108-155c - Essence of Peregian SCEP Stage 1 Update109_Output Documents\1 108-155C_SWMP
SCEMP_Scanlon Property Group V3.0 ta_120113.doc                                                                           Page 16 of 24

Page 25

Development details (site layout, sub-catchments, conceptual earthworks and conceptual
drainage) are provided as plan drawings in Appendix A (drawing numbers 1108-155C-01-01 to
1108-155C-01-06). Specifications of the site layout (roof area, balance area) are given in
Appendix B. There are south, mid, and north sub-catchments (drawing J-1005-310-06), each
with a design treatment train that flows toward the terminal wetland and the receiving node of
the receiving waters next to the Noosa National Park.

The Solutions state minimum sizes of Rainwater Tanks, Bio-retention systems and Constructed
Wetlands that are required to meet the Queensland Development Code Mandatory Part 4.2 and
4.3, and the stormwater quality objectives outlined in the Best Practice Environmental
Guidelines - Urban Stormwater. The stated dimensions proposed for the Essence of Peregian
development are listed in Table 10-2.

    Table 10-2: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions
      Deemed to Comply                         Deemed to Comply
                                                                                              Development size
          Solution                               Requirement
                                          3 kL.

  Rainwater tank for                      QId Development Code
                                                                                  3 kL. per beach shack
  attached dwellings in the               MP 4.3 requiresl.5 kL per
                                          required pedestal in                    2 x 100 kL = 200 kL (apartment
  Sunshine Coast Regional
                                          commercial buildings with               buildings)
  Council (North Coast)
  region:                                 a class 3 code (i.e. motels             1 x 100kL = commercial building
                                          or boarding houses that
                                          unrelated people co-habit).
                                                                                  Bio-retention Al (north) = 1.5 %
 Bio-retention System Filter                                                      Bio-retention B1 (Mid) = 1.5 %
 Media Area (% of                                        1.1 %                    Bio-retention C1A (south) = 1.5 %
 catchment area):                                                                 Bioretention C1B (south) = 1.5%
                                                                                  Total Bio-retention Area = 1 5%

The Rainwater Tanks are sized appropriately for the accommodation units (3 kL per beach
shack). The surface areas represented by the Bio-retention Trenches (1.5% of the catchment
area) complies the WSUD Deemed to Comply Solutions (1.1 %).

It is possible to design a stormwater treatment train outside the prescribed parameters,
provided that the Best Practice Environmental Management Guidelines - Urban Stormwater
(DERM 2009) and the planning requirements of the assessment authority are followed. A
carefully designed stormwater treatment train has been proposed by the Stormwater
Management Plan, and has been supported by detailed MUSIC modelling (section 6.0).

In summary, the Environmental Impact Assessment indicated that the proposed Essence of
Peregian development will have negligible consequences resulting from total suspended solids,
total nitrogen and total phosphorus entering Noosa National Park. The treatment train for the
SWP has been designed to minimise the effects of rainfall and stormwater erosion of the
landscape, retain rainwater collected on roofs and hard surfaces for irrigation and domestic use,
and direct remaining overflow through Bio-retention Trenches and the Constructed Wetland
System.

Detailed MUSIC modelling identified that the proposed development will achieve the required
water quality objectives (Appendix B). Suspended solids and total nutrients will be removed
early in the treatment sequence (Appendix B). It is predicted that the maximum concentrations
of pollutants in stormwater during extreme events (Appendix B) will be substantially less than
concentrations presently measured in stormwater entering the terminal wetland from the
existing caravan park site (Table 4-1).

©2012 Simmonds & Bristow Pty Ltd                        Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c- Essence of Peregian SCEP Stage I Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3 0 ta_120113.doc                                                                         Page 17 of 24

Page 26

11.0        MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS

A draft water quality monitoring program has been developed to measure the performance of
the proposed stormwater treatment. The objective of the monitoring program is to quantitatively
show whether or not the nominated water quality targets are being met.

The key water quality indicators are total suspended solids, total nitrogen, total phosphorus and
pH.    Other relevant water quality parameters include microbiological parameters (faecal
coliforms, Escherichia coli), chemical and physical parameters (dissolved oxygen, turbidity), and
herbicides if they are used within the development site. The following water quality indicators
are recommended (Table 11-1):

       •      Microbiological: Faecal coliforms, Escherichia coli
       •      Physical: Biological Oxygen demand, dissolved oxygen, suspended solids, turbidity,
              pH;
       •      Chemical: Total suspended solids, total nitrogen, total phosphorus; and
       •      Herbicides: If herbicides are used to control weeds on the development site, then
              they should be included in the suite of water quality indicators.

                       Table 11-1: Summary of Test Methods for Ambient Surface Waters
                                                 Sample Preparation
              Parameter                                                                      Sample Analysis Method
                                                      Method
                                                  Heated persulphate
  Nutrients - total                                                                        SEAL AQ2 discrete analyser
                                                      digestion
  E coli                                          Membrane filtration                     EC Broth or EC-MUG medium
  Faecal coliforms                                Membrane filtration                                  M-FC Agar
                                                                                        Membrane electrode in Wheaton
  BOD5                                                   Incubation
                                                                                                   Bottles
  Suspended solids                                Membrane filtration                                  Gravimetric
  Dissolved oxygen                                          None                                Membrane electrode
  pH                                                        None                                Membrane electrode
  Turbidity                                                 None                                       Photometer
LHerbicides                                        Solvent extraction                                   #GC/MS
#GCMS - Gas Chromotograph/Mass Spectrometer


The existing spatial variation of key water quality indicators in the wetland adjacent to the
Noosa National Park, measured on the 10th July 2009 after a stormwater flow, was used to
identify the replication needed to represent water quality in the Constructed Wetland System
and the receiving node.

It is recommended that the water quality of the terminal wetland is represented by 9 sampling
points per sampling event (i.e. 9 spatial replicates): six from the Constructed Wetland System
and 3 more from the heath on the west of the terminal wetland (adjacent to Noosa National
Park). This sampling frequency will accommodate the spatial variation of water quality
measurements expected in the Constructed Wetland System, and in the heath that connects
with Noosa National Park, and will quantitatively show the difference between the average
measured concentrations in the Constructed Wetland System and the receiving waters,
compared with the required target or guideline values.

The recommended sample points are indicated in Table 11-2, which lists the location of sample
points during the construction phase and the operational phase.



©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3.0_ta_120113.doc                                                                           Page 18 of 24

Page 27

Table 11-2: Location of Water Quality Monitoring at the Essence of Peregian Site

               Site                  Site No.                                       Description

  Wetland A2                              1         Monitor quality of stormwater entering wetland A2
  Wetland A2                              2         Replicate monitoring of stormwater quality entering
                                                    wetland A2
  Wetland B2                              3         Monitor quality of stormwater entering wetland B2
  Wetland B2                              4         Replicate monitoring of stormwater quality entering
                                                    wetland B2
  Wetland C2                              5         Monitor quality of stormwater entering wetland C2
  Wetland C2                              6         Replicate monitoring of stormwater quality entering
                                                    wetland C2
  Heath                                   7         Monitor quality of stormwater entering the receiving
                                                    waters
  Heath                                   8         Replicate monitoring of stormwater quality entering the
                                                    receiving waters
  Heath                                   9         Replicate monitoring of stormwater quality entering the
                                                    receiving waters
  Construction Site                      10         Monitor rainfall onto construction site
  Inflow onto                            11         Monitor quality of stormwater entering construction site
  construction site
  Inflow onto                            12         Monitor quality of stormwater entering construction site
  construction site
  Outflow from                           13         Monitor quality of stormwater exiting construction site
  construction site
  Outflow from                           14         Monitor quality of stormwater exiting construction site
  construction site

Locations are as per the sampling map, included as Appendix F.

Monitoring needs to commence during the construction phase, and continue during the
operational phase.

11.1       Water Quality Monitoring During Construction

          During construction, monthly monitoring for the parameters described in Table 11-1 is
          recommended from sites 7 to 9 (Table 11-2). Additionally, it is recommended that the
          suspended solids concentration of stormwater is measured at sites 10 to 14 during
          stormwater events, with collection of four (4) stormwater samples flowing onto the
          construction site, four (4) more stormwater samples flowing from the construction site
          into the terminal wetland, and a rain-gauge is installed on site to indicate the intensity of
          rainfall during a stormwater event (Table 11-2).

          Inflow and outflow water needs to be collected as paired samples within a short time
          frame, with each pair representing the same phase of stormwater activity. The volume
          of stormwater generated in the catchment can be calculated by the area of catchment
          and the intensity of rainfall during the event.    The proportionate change in the
          suspended solids loads in stormwater flowing over the construction site will provide a
          measure of the sediment being generated from the construction site.



©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                           J-1005-310 - 13 January 2012
I.\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3.0 ta_120113.doc                                                                           Page 19 of 24

Page 28

           Herbicide monitoring in stormwater entering and leaving the construction site should be
           performed when applications are known to occur, rather than routinely.           Some
           herbicides have a short residence time, so arrangements may need to be made with the
           laboratory for rapid courier service and turnaround time. The monitoring schedule is
           listed in Table 11-3

11.2         Water Quality Monitoring During Routine Operation of the Essence of Peregian

           Sampling should be performed at sites 1 to 9. The temporal sampling frequency is
           recommended at monthly intervals for the first 12 months, with quarterly sampling
           thereafter (Table 11-3). This temporal frequency is intended to show the proportional
           improvement from the existing water quality condition in response to improved
           stormwater management associated with the new development. Seasonal variations
           can be identified from the quarterly samples. Herbicide monitoring is as described for
           the construction phase.

     Table 11-3: Monitorina Schedule for the Construction and Operational Develooment
                      Site     Site    Site    Site     Site    Site    Site    Site    Site     Site    Site    Site    Site    Site
  Parameter
                      1        2       3       4        5       6       7       8       9        10      11      12      13      14

  Rainfall                                                                                      S
  pH                   M       M       M       M       M        M       M       M       M
  Dissolved            M       M       M*      M       M        M       M       M       M
  oxygen
  BOD,                 M,      M*      M*      M,      M        M*      M*      M       M
  Suspended            M       M       M       M       M        M       M       M       M*               S       S       S       S
  Solids
  Total                M       M       M'      M       M        M       M*      M       M
  Nitrogen
  Total                M       M       M       M       M        M       M       M       M
  Phosphorus
  Herbicides          M        M       M       M       M        M       M       M       M               S        S       S       S
  Faecal              M        M       M       M       M'       M       M       M       M
  coliforms
  Enterococci         M        M       M       M       M       M        M       M       M
  Turbidity        M      M     M       M    M      M       M , I M* I M,
M = monthly monitoring during construction and during the first two years of operation; quarterly monitoring during
the second year and thereafter.
S = Monitoring during stormwater flow events




02012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group V3.0 ta_120113 doc                                                                           Page 20 of 24

Page 29

12.0       CONDITIONS AND LIMITATIONS

The data contained in this volume has been commissioned by Scanlon Property Group, Limited
on behalf of Thomco Limited, to support a Development Application for Operational Works
associated with the development known as 'Essence of Peregian' located at 215-219 David
Low Way, Peregian Beach.

In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level
data, calculations and previous reports prepared by Council and external consultants to support
the original development application, and the preparation of Joint Experts Reports for the court
ordered mediation process associated with the preparation of the negotiated approval
conditions.

While reasonable precautions have been taken to validate the data provided before its
incorporation into modelling and design procedures, the absolute accuracy of such data cannot
be guaranteed with certainty and may vary over time as site conditions change. As such, it is
anticipated that minor changes may be required on site to allow the recommendations of this
plan to be implemented effectively.

Minor or temporary changes to accommodate on-site conditions during the construction phase
should be made in consultation with a suitably qualified and experienced professional engineer
or qualified sediment and erosion control specialist.

Any proposed permanent changes required to the layout, geometry, depth and/or volume of bio-
filtration basins and/or wetland elements as a result of any site conditions that are different to
those assumed and modelled during design, should be referred back to the designer, or to a
suitably experienced and qualified stormwater management consultant, and resubmitted to
Council for compliance re-certification and approval.

The Stormwater Management Report contained within this report comprises of all constituent
parts of the report in full, including the text, calculation summary and appended drawings. If
additional copies of this report are required, separate sections or individual pages must not be
copied in isolation.

Except for archival and record keeping purposes, this report should not be copied and stored in
any electronic media or passed onto other parties without the express written permission of
Simmonds & Bristow.

No part of this report may be copied or used for any other purposes other than the purpose
stated in this report.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I \CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update 09_Output Documents\1108-155C_SWMP
SCEMP_Scanton Property Group V3.0 ta_120113 doc                                                                          Page 21 of 24

Page 30

 13.0       COMPLIANCE CERTIFICATE

Simmonds & Bristow hereby certifies that the Stormwater Management Plan, as detailed within
this report, "Essence of Peregian, Stormwater Management Plan & Sediment & Erosion Plan,
Simmonds & Bristow, December 2011," (including the associated drawings listed and attached
herein - 1108-155C-01-01 to 1108-155C-01-08), if implemented and maintained on site in
accordance with the detailed instructions set out for both the Operational and Construction
Phase of the development contained within the report, will result in compliance with the relevant
conditions of development consent, in particular:

Condition 61 - " All stormwater drainage (including roof water overflow from the rainwater
storage system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site.

Condition 62 - " A detailed Stormwater Management Plan and a Sediment and Erosion Control
Plan shall be prepared that refines the MUSIC modelling prepared for the concept report.

Condition 63 - "Grease and Oil arrestors and/or stormwater quality improvement devices must
be incorporated into the design to treat all run-off prior to run-off exiting the premises.

Condition 64 - "A detailed maintenance plan shall be prepared for the proposed stormwater
management system - refer specifically to Section 7.4 and Appendix D.

This report and the certification included within it has been prepared for a specific location and a
specific development proposal, as described in this report. Any changes to the development
layout, sequencing, or the relative areas of pervious, impervious or roof areas made
subsequent to this certification shall render this certification void and an amended certification is
to be obtained.




Signed:                                                           Date:

David Bristow MIEAust, CPENG, RPEQ




©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1 005-310 - 13 January 2012
I.\CLIENTFILES\Contrast Constructions\1 108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113 doc                                                                            Page 22 of 24

Page 31

 14.0       REFERENCES

Australian and New Zealand Environment and Conservation Council (2000). Australian and
New Zealand Guidelines for fresh and marine water quality. Australian and New Zealand
Environment and Conservation Council, Agriculture and Resource Management Council of
Australia and New Zealand.

 Brown Consulting (2007). Concept Stormwater Management Plan for Essence of Peregian at
 David Low Way, Peregian Beach. Technical Report. 17pp.

 Butler Partners (2007). Acid Sulfate Soils Assessment Residential Development 215-219 David
 Low Way Peregian Beach. Technical Report 1Opp.

Department of Environment and Resource Management (2009). Queensland Best Practice
Environmental Management Guidelines 2009. Queensland Department of Environment and
Resource Management Technical Report. 304pp.

Environmental Protection Agency (2007).       Noosa River Environmental Values and Water
Quality Objectives. Basin No. 140 (part) Including Kin Kin Creek, Teewah coastal creeks, Lakes
Cooroibah, Cootharaba, Doonella and Weyba. Queensland Environmental Protection Agency
Technical Report. 35pp.

Grant Witheridge. Erosion and Sediment Control - A decade of lessons learnt. Catchments and
Creeks Pty Ltd unpublished seminar material.

Healthy Waterways. Controlling stormwater pollution on your building site. Information booklet
with factsheets.

Local Government Association of Queensland (2006). Introductory Erosion and Sediment
Control Guidelines for Queensland Councils. Technical Report.. 64pp.

Natural Solutions (2007). Ecological Assessment- 215-219 David Low Way, Peregian Beach.
Technical Report. 41 pp.

SEQ Healthy Waterways Partnership (2009).       Water Sensitive Urban Design Deemed to
Comply Solutions for South East Queensland. Technical Manual 74pp.




©2012 Simmonds & Bristow Pty Ltd                          Contrast Constructions                          J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1 108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0_ta_120113.doc                                                                           Page 23 of 24

Page 32

                                   APPENDIX A:

                                    SITE PLANS
List of Certified Plans Included:
1105-155C-01-01, Rev A, Dec 2011 - Site Layout
1105-155C-01-02, Rev C, Dec 2011 - Proposed Stormwater Treatment Device Details &
                                    Layout
1105-155C-01-03, Rev C, Dec 2011 - Proposed Pipe Routing & Catchment Areas
1105-155C-01-04, Rev C, Dec 2011 - Bioretention Basin and Wetland Layout
1105-155C-01-05, Rev C, Dec 2011 - Bioretnetion basin and Wetland Cross-Section and
                                    Construction Details (Biobasin C1 B & Wetland C2 as
                                    example)
1105-155C-01-06, Rev A, Dec 2011 - Stormwater Management and Control Areas

Page 33

                   BEACH SHACKS (EXAMPLE) - FOR ALL SHACKS
                          100% OF ROOF AREA CONNECTED TO
                       3kL STORAGE TANKS WITH APPROPRIATE
                                      INLET ARRANGEMENTS

                                                                                                                                                                                                                                    BUILDING A
                                                                                                                                                                                                                                    100% OF ROOF AREA CONNECTED TO
                                                                                                                                                                                                                                    lOOkL STORAGE TANK WITH APPROPRIATE
                                  NORTHERN BIORETENTION Al                                                                                                                                                                          INLET ARRANGEMENTS
                                         95m2 SURFACE AREA
                                     SEE DWG 1108-155C-01-04
                                          AND 1108.155C-01-05
                                         FOR DESIGN DETAILS


                                    APPROXIMATE
                                  DEDICATION LINE




                                                                                                                                                                                                                                 BUILDING B
                                                                                                                                                                                                                                 100% OF ROOF AREA CONNECTED TO
                                                                                                                                                                                                                                 lOOkL STORAGE TANK WITH APPROPRIATE
                                                                                                                                                                                                                                 INLET ARRANGEMENTS




                                         MID BIORETENTION B1
                                          Blm° SURFACE AREA
                                      SEE DWG 1108.155C-01-04                                                                                                                                                                                   HOTEL/COMMERCIAL AREA
                                           AND 1108.155C-01-05                                                                                                                                                                                  100% OF ROOF AREA CONNECTED TO
                                 FOR GENERAL DESIGN DETAILS                                                                                                                                                                                     1 OOkL STORAGE TANK WITH APPROPRIATE
                                                                                                                                                                                                                                                INLET ARRANGEMENTS




                                           CATCH-DRAIN TO 61
                  APPROXIMATE
                  BOUNDARY TO
                 NATIONAL PARK




                                 SOUTHERN BIORETENTION C1b
                                          74m2 SURFACE AREA
                                                                                                                                                                                                                                                                  FLOW FROM OFFSITE
                                     SEE DWG 1108-155C-01-04
                                                                                                                                                                                                                                                                  AREA DIRECTED TO
                                          AND 1108-155C-01-05
                                         FOR DESIGN DETAILS                                                                                                                                                                                                       C1A BIORETENTION BASIN


                                                                                                                                                                                                                                                               SOUTHERN BIORETENTION Cta
                                                                                                                                                                                                                                                               VARIABLE WIDTH
                                                                                                                                                                                                                                                               63m° SURFACE AREA
                                                                                                                                                                                                                                                               4.0-4.5mRL




CLIENT DETAILS                                                    REVISION SMIDULE                  [lA                                                                                                                                 I DRAWING TITLE                     S( ALE

CONTRAST CONSTRUCTIONS                 ESSENCE OF PEREGIAN
                                                                                                          'M
                                                                                                                                                                    Simmonds & Bristow Pty. Ltd.                                         PROPOSED STORMWATER
                                                                                                                                                                                                                                                                                AS SHOWN
                                                                                                                          any.orhs erlouleo Pro4lMn shall 1"Oon
                                                                                                                          IM properly of S S 0 or on a radon rest
                                                                                                                       2 vitlS60
                                                                                                                                                                    WATER & ENVIRONMENTAL ANALYSTS &                                     TREATMENT DEVICE
                                       STORMWATER MANAGEMENT                                        [! SIhNf 1         3 00 WT SCALE
                                                                                                                          Oleexsons, Inels, etc to be -.fed on      CONSULTANTS                                                          DETAILS & LAYOUT                   JOB/PROPOSAL No.
                                                                 C 13/01/12 GENERAL UPDATE    TA ,RAWN            TA
                                       PLAN                      B 05/01/12 GENERAL UPDATE    TA [ HE[NEC        DJB
                                                                                                                       4. she prior to the roenenowenl of or1
                                                                                                                          My durepaMMs to 6. reported P. S 6 8      40 REfiMALO STREET. ROUQEA 4IM
                                                                                                                                                                                                                                                                              1108-155C
                                                                                                                          for rerolulgn before carry" "I tpw        Pb 500 3150 YERONGA OLD LI04 AUSTRALIA                                                                  DWG No           'Ei
                                                                 A 19/12/11 INITIAL VERSION   TA rirNro                   .A,                                       PH 10713110 8166
                                                                                                                                                                                                                                                          FOR INFORMATION
                                                                 REW   DATE      il:rwN'S     NIL ( DATE                                                            PAR N71 f+!?.+Nklping you make good dean water   A.C.N. 010 252 418 D[OTNUNBER           DATE 13/01/12 1108-155C-01-02

Page 34

                                                                                                                                                                                                                          OFFSITE CATCHMENT




                                                                                                                                                                                                               HOTEUCOMMERCIAL
                                                                                                                                                                                                                     AREA




             SOUTH CATCHMENT
                 (STAGE 1)




CLIENT DETAILS                 JOB NAME                REVISION SCHEDULE                       DfLM             General notes,
                                                                                                                                                                                                                DRAWING TITLE

CONTRAST CONSTRUCTIONS         ESSENCE OF PEREGIAN
                                                                                                            I   Copyryhl in all do(MMla. O'arogs and in
                                                                                                                any works eeeculed from them shall nman
                                                                                                                TIe property of S & B or on creation vast
                                                                                                                                                            Simmonds & Bristow Pty. Ltd.                        PROPOSED PIPE
                                                                                                            2   nthSL8
                                                                                                                                                            WATER & ENVIRONMENTAL ANALYSTS &                    ROUTING AND
                               STORMWATER MANAGEMENT                                      CES PFY           3   20 NOT SALE
                                                                                                                                                            CONSULTANTS                                         CATCHMENT AREAS
                                                       C 13101/12 GENERAL UPDATE       TA JrAws       TA        Ouoensions, levels, dr to be etrfied on
                                LAN                        05/01/12 GENERAL UPDATE     T / CHECKED    D:B
                                                                                                            L   Lte prior In the e<mmenoeese nl of V rh
                                                                                                                My discrepmms to be reported to S L 8       40 AEGRAL0 START, AOCIIIEA 410
                                                                                                                for resolut on before carrying ONt the      Po BOA 3100 YEAOIIGA 010 LIN AUSTAAUA
                                                           19/1211 INITIAL VERSL; N    T Al SIGNED                                                          FA 1071 37v 1110

                                                       E    DATE       COMMENT!       1 EB1L   CA'E
                                                                                                                                                            FAA 1071311q,1Ilping    you make good dean water

Page 35

      .Lkf
             05.         70^n         41.
                                                                                                                                                                                                                                                        SCALE (mm)
      nn           Ian          Lan         5


                                                                                                                                                                                                                                                               50                  10
                                                                                                                                                                                                                                                        0                100                200



                                                                                                                                                                                                  4




                                                                                                                                                                       DETAIL A - ANTI SCOUR DEVICE GENERAL ARRANGEMENT
                                                                                                                                                NOTES:
                                                                                                                                                1    WETLAND BUFFER TO NATIONAL PARK
                                                                                                                                                     ROCK ARMOURED SPILLWAY, 1m BASE WIDTH, 1:3 GRADE WALLS IN GRASSED
                                                                                                                                                     BATTER AT 1:4 SLOPE WITH ROCK APRON - SUBJECT TO DETAIL DESIGN
                                                                                                                                                    BIORETENTION BASIN
                                                                                                                                                     SANDY LOAM FILTER MEDIA, 60% 0.45mmES, 150mm/hr HYDRAULIC
                                                                                                                                                    CONDUCTIVITY
                                                                                                                                                    <1000mg/kg TOTAL NITROGEN, <80mg/kg ORTHOPHOSPHATE, -3% ORGANIC
                                                                                                                                                    MATTER CONTENT
                                                                                                                                                    PERVIOUS GRAVEL BASE, 200mm DEPTH, 5-20mm ES GRAVEL
                                                                                                                                                    IMPERVIOUS GEOMEMBRANE SIDE-WALL LINER
                                                                                                                                                    SEE DRAWING 1108-155C-05 FOR MORE DETAIL
                                                                                                                                                    SUBJECT TO DETAIL DESIGN
                                                                                                                                                    PIPED INLET FROM STORMWATER DRAINS WITH ANTI-SCOUR DEVICE - SEE
                                                                                                                                                    DETAIL A
                                                                                                                                                    BIORETENTION BASIN EDGE SHEET-FOW ANTI-SCOUR DEVICE, 65mmES RIVER
                                                                                                                                                    ROCK IN GEOTEXTIE - SEE DRAWING 1108-155C-05 FOR MORE DETAIL
                                                                                                                                                    INTERCEPTOR DRAIN/SWALE INLET TO BIORETENTION BASIN
     BIORETENTION BASIN LAYOUT
                                                                                                                                                    SEE DRAWING 1108-155C-05 FOR MORE DETAI
     SEE DWG 1108-155C-05 FOR FURTHER DETAIL                                                                                                        BOLLARDS TO SUIT SITE AESTHETICS
                                                           %     II
                                                                                                                   6W irole.
CLIENT DETAILS                                  108 NAME                                                                                                                                                                              DRAWING TITLE
                                                                                                                t (p4I ell d.c.nts. dra           AndNpwAs
                                                                                                                                                               Simmonds & Bristow Pty. Ltd.                                           BIORETENTION BASIN
                                                                                                                                                                                                                                                                          S(ALE

CONTRAST CONSTRUCTIONS                          ESSENCE OF PERIGIAN                                                                                                                                                                                                            AS SHOWN
                                                                                                                    ceded fro. Ile shall rail ft pprhof S l8
                                                                                                                   mrSO   0f mf wi1511
                                                                                                                7 DO NOT S(Al(
                                                                                                                                                               WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS                           AND WETLAND LAYOUT
                                                STORMWATER TREATMENT                                            )8r xiae. had,. of, h It .er,N on W, grow to
                                                                                                                                                                                                                                      STAGE 1 (BASIN C1B)                 108/PROPOSAL No
                                                                       13/01/12 GENERAL UPDATE                     ft- t of.A

                                                DESIGN                 06/01/17 GENERAL UPDATE   (HEIXED   ii
                                                                                                                I AM duaep'.s 1. ha reported I. S I8 for
                                                                                                                   molofin dolor, lyryq e f fk M               uM115LLD5(AQT,N (A IN
                                                                                                                                                                                                                                                                               1108-15SC
                                                                                                                S Addi*no    or- viers dhrwn dlei                                                                                                                                                 Ti v
                                                                                                                                                               p01WS%*s9 91.0515 MN1WN                                               DRAW[T STATUS                       OWE No.
                                                                       19/12/11INITIAL VERSION                                                                 (0 NnUi1P0I
                                                                                                                                                                                                                                                      CONCEPT ONLY
                                                                                                                                                               (Ax Nn m pe+      Helping you make good dean water   AC.N.010252418   IPLOT NUMDER       DATE. 13/01/17    1108-155(-01-04

Page 36

                                                                                                                                                                                                                                                                     RL 4.00 DWELLING FFL MIN

                                                                                                                                                                                                                                    DWELLING PAD RL 3.50 M
                                                                                                                                                                                                                                                                          4




                                                                                                                                                                                                                                                                                   a
                                    RL 3.25
                          RL 3.20
                   4         _


                                                               0
        RL 2.50 (NGL)    O
       v
                                                    RL 2.30


                                                                                                         3m




  SECTION 'A-A' - BIORETENTION BASIN CROSS-SECTION

   NOTES:
   1   EXISTING WETLAND BUFFER TO NATIONAL PARK
   2   ROCK ARMOURED SPILL WAY (3 OF), 1m BASE WIDTH, 1:3 SLOPE SIDE WALLS - SUBJECT TO DETAIL
       DESIGN
   3      BIORETENTION BASIN
          500mm FILTER DEPTH
          SANDY LOAM FILTER MEDIA, 60% 0.45mmES,150mmlhr HYDRAULIC CONDUCTIVITY, <1000mg/kg TOTAL
          NITROGEN, <80mg/kg ORTHOPHOSPHATE, -3% ORGANIC MATTER CONTENT
          200mm EXTENDED DETENTION DEPTH
          SUBJECT TO DETAIL DESIGN
  4       IMPERMEABLE GEOMEMBRANE SIDE-WALL LINER
  5       PERMEABLE GRAVEL BASE LAYER, 200mm DEPTH, 5-20mmES NO-FINES COARSE GRAVEL
  6       BIORETENTION BASIN PLANTINGS. TURF SPECIES SUITABLE FOR INUNDATION. SOURCE SUITABLE
          PLANTS FROM APPENDIX A OF THE WATER SENSITIVE URBAN DESIGN MANUAL
  7       INLET ROCK DIFFUSER
  8      STORM DRAIN INLET ENERGY DIFFUSER. SEE DETAIL A
  9      STORM DRAIN INLET PIPE
         500mm DEPTH OF COVER TO BE MAINTAINED WHERE POSSIBLE
         WHERE HYDRAULICS REQUIRE LESS THAN 500mm DEPTH OF COVER, PIPE TO BE CONCRETE CASED
         WITH 200mm DEPTH OF COVER
  10     GRASSED CATCH DRAIN (SWALE), 200mm DEEP 1:130 FALL ALONG LENGTH TO SUIT 1:5 ARI STORM
         EVENT
         TRAILING EDGE TO BE FILLED TO PROVIDE 200mm DEPTH AND TO ACCOMODATE FALL TO
         BIORETENTION BASINS
  11     BOLLARDS TO SUIT SITE AESTEHTICS
  12     DWELLING PADS. 3.5mRL MINIMUM TO 6.OmRL.
         BIORETENTION BASIN C1A LOCATED AT 4.OmRL
  13     GRASSED BATTER AT 1:4 GRADE
  14     INLET ROCK DIFFUSER GEOTEXTILE WRAPPER                                                                                      DETAIL A - SCOUR PROTECTION DEVICE GENERAL ARRANGEMENT
  ALL RL'S IN mAHD. DIMENSIONS AS MARKED. FINISHED GROUND LEVELS ARE INDICATIVE ONLY AND
  SUBJECT TO FINAL ADJUSTMENT ON SITE
(LINT DETANS                                                              REVISION S(I(DUE                          DATUM                    feel Wn,
                                     um

CONTRAST CONSTRUCTIONS               ESSENCE OF PERIGIAN
                                                                                                                                         S   ('r'    Aa wwrt, aaq a.rq+ti,
                                                                                                                                                  'dt . ttw U. rt^r tk~y . s&a    Simmonds & Bristow Pty. Ltd.                                                    DRAWING TITLE
                                                                                                                                                                                                                                                                  BIORETENTION BASIN
                                                                                                                                                                                                                                                                                                 SCALE


                                                                                                                                                                                                                                                                                                    AS SHOWN
                                                                                                                                             ..
                                                                                                                                            -.4- -f ths 6
                                                                                                                                         L pp Not SW
                                                                                                                                                                                  WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS                                    AND WETLAND
                                     STORMWATER TREATMENT                                                           DESIGNED    TA       I Oif     k U.. etc tok .ifw Mlle inrk
                                                                                                                                                                                                                                                                  SHORT CROSS-SECTION            JOB/PROPOSAL No.
                                                                         C 13/01/12 GENERAL UPDATE            TA DRAWN         TA           tk,.S010 k d W

                                     DESIGN                              E3 06/01/12 GENERAL UPDATE           TA (NECKED       DJB
                                                                                                                                             Aq 6-p- to b -We' t1 S S 8 f.
                                                                                                                                             rmmm kto<e"" mt tk M                 uRO WO SIIHT. NuaOFA ANr
                                                                                                                                                                                                                                                                  SECTION A-A                      1108-155C
                                                                                                                                         S   W 6k*kms n -WasOI       ftftd        0 box 3" yumu aC4 4 usm"                                                                                                             REV
                                                                               19/12/11INITIAL VERSION        T. sl(^N^o                                                          Al NmmM
                                                                                                                                                                                                                                                                                  CONCEPT ONLY
                                                                                                                                                                                                                                                                                    DATE 13/01/12 1108- 155( -01 -05
                                                                                                                                                                                  FAX0m""             ... Helping you make good dean water
                                                                         REN    DATE   I (OMM(NIS             NTL   OATS                                                                                                                     A.C.N. 010 252 418               R

Page 37

          NOOSA
         NATIONAL
           PARK




                                                                             SPHACK ROOF
                                                                                SCU^II
                                                                               I I t Sr,^kt

                                                            SHACK
                                                            TAWS
                                                            SOUTH
                                                          11 sNCAso
                                                            711. AA                   iN
                                                                               GARDEN
                                                                                REUSE
                                  810-RETENTION
                                    BASIN CIO
                                       74M




                                                    STORM WA                   MEET
                                                         DRAINS                FLOW
                                                                               SOUTH




                                                  CATC       N5 ALE




                                                    BASIN CIA              COFAAIERCL
                                                      63r                   BUL01NG5




                    STAGE 1 TREATMENT TRAIN                                                                                                FULL DEVELOPMENT TREATMENT TRAIN

(LENT DETALS                                                      REVIS N S(KOLLE                      DAiL"               Gnerof bit,,.
                             a"                                                                                                                                                                                                                DRAWING TITLE                        SCALE
                                                                                                                         I (pyrrtl     all 1oc .ot. le.ugo W n
                                                                                                                                                                   Simmonds & Bristow Pty. Ltd.
CONTRAST CONSTRUCTIONS       ESSENCE OF PEREGIAN                                                                                                                                                                                               PROPOSED STORMWATER
                                                                                                                                                                                                                                                                                       AS SHOWN
                                                                                                                           ry works...twin f,- fM obit rwe
                                                                                                                           t.e W.Wty of Si l r on ant-, W
                                                                                                                         2 MA SiB
                                                                                                                                                                   WATER & ENVIRONMENTAL ANALYSTS &                                            TREATMENT TRAIN
                             STORMWATER MANAGEMENT                                                     GLS(..I!D         3 DO tpT SALE
                                                                                                                           Datensnns,Intls, etc to It. n,,t.d on   CONSULTANTS                                                                 DETAILS                              J08/PROPOSAL No.
                                                                                                       DRAWN       TA
                              PLAN                                                                     CHE(A(O     DJ8
                                                                                                                         6 10. rnr to tM ewerrmeeenl of work
                                                                                                                           Any 6rrepao(leo In 6. rprted to Si B    40 REGINALD SIREEI, ROCXLEA AIN
                                                                                                                                                                                                                                                                                       1108-155C
                                                                                                                           for resolution bite,, c rryng out tA.   PO BOX 3160 YERONGA OLD 6101 AUSTRALIA                  oil                 DRAWING STATUS                       DWG No.           REV.
                                                                      05/01/12 NITIAL VERSION   TA SIGNED                                                          PH 10713710 9100                                                                             FOR INFORMA I ION
                                                                                                                                                                   FAX 107) 3716. 9
                                                                                                MIL.   DAIE
                                                                                                                                                                                      Pklping you make good dean water   A. C.N. 010 252 418 'PLOT NUMBER          DAIS 05/01/1     1108-1550-01-06    A

Page 38

  APPENDIX B:

MUSIC MODELLING


[OCR of page images]
 

APPENDIX B:

MUSIC MODELLING

 

Page 39

         STAGE 1 MUSIC MODEL SUMMARY




EV   n




                                           0'

                                           i

                             IW4
                                               C:
                                               0,
     Figure B-2: MUSIC Model Diagram - Stage 1 Only


[OCR of page images]
 

STAGE 1 MUSIC MODEL SUMMARY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure B-2: MUSIC Model Diagram — Stage 1 Only

 

Page 40

                                             STAGE 1 ONLY MUSIC MODEL INPUT PARAMETERS

                                        Table B-1: Stage 1 MUSIC Model InDUt Parameters - Sources (A
MUSIC Model Inputs for the Essence of Peregian:                                   Commercial
                                                                                                    North          Mid          South
Stage 1                                                     Commercial (hotel)   Podium (rest.,
                                                                                                   balance       balance       balance

Size (ha)                                                         0.254             0.0915          0.5345        0.7057        0.296
% Impervious                                                        40                 40             11             0            0
Rainfall threshold (mm/day)                                          1                  1              1             1             1
Soil storage capacity (mm)                                         120                120            400           400           400
Initial storage (% of capacity)                                     25                 25             10            10            10
field capacity (mm)                                                 80                 80            200           200           200
infiltration capacity coefficient - a                              200                200             50            50            50
infiltration capacity exponent - b                                   1                  1              1             1             1
initial depth (mm)                                                  50                 50             50            50            50
daily recharge rate %                                               25                 25             25            25            25
daily baseflow rate %                                               5                  5               5             5             5
daily deep seepage rate %                                           0                  0               0             0            0
TSS Base flow conc. Params (Mean, Std Dev) (Log mL/L)           0.78, 0.39         0.78, 0.39       1, 0.34       1, 0.34       1 ,0.34
TSS Storm flow conc. Params (Mean, Std Dev) (Log mUL            2.16, 0.38         2.16, 0.38     2.18, 0.39    2.18, 0.39    2.18, 0.39
TP Base flow conc. Params (Mean, Std Dev) (Log mUL               -0.6, 0.5          -0.6, 0.5     -0.97, 0.31   -0.97, 0.31   -0.97, 0.31
TP Storm flow conc. Params (Mean, Std Dev) (Log mUL)            -0.39, 0.34        -0.39, 0.34    -0.47, 0.31   -0.47, 0.31   -0.47.0.31
TN Base flow conc. Params (Mean, Std Dev) (Log mUL)              0.32, 0.3          0.32, 0.3      0.2, 0.2      0.2, 0.2      0.2, 0.2
TN Storm flow conc Params (Mean, Std Dev) (Log mUL)              0.37, 0.4          0.37, 0.4     0.26, 0.23    0.26, 0.23    0.26, 0.23

Page 41

      Table B-2: Stage I MUSIC Model Input Parameters - Sources (B
     MUSIC Model Inputs for the Essence of Pereglan:
                                                                    Roof Restaurant
     Stage 1

     Size (ha)                                                           0.111
     % Impervious                                                         100
     Rainfall threshold (mm/day)                                           1
     Soil storage capacity (mm)                                           400
     Initial storage (% of capacity)                                       10
     field capacity (mm)                                                  200
     infiltration capacity coefficient - a                                50
     infiltration capacity exponent - b                                    1
     initial depth (mm)                                                   50
     daily recharge rate %                                                25
     daily baseflow rate %                                                 5
     daily deep seepage rate %                                             0
     TSS Base flow conc. Params (Mean, Std Dev (Log mUL                 1, 0.34
     TSS Storm flow conc. Params (Mean, Std Dev (L og mUL)             2.18, 0.39
     TP Base flow conc. Params (Mean, Std Dev) (Log mUL)              -0.97, 0.31
     TP Storm flow conc. Params (Mean, Std Dev (Log mUL)              -0.47, 0.31
     TN Base flow conc. Params (Mean, Std Dev) (Log mUL)                0.2, 0.2
     TN Storm flow conc. Params Mean, Std Dev) (Log mUL)              0.26, 0.23


Table B-3: Stage I MUSIC Model Input Parameters - Treatment Devices (A)
     Treatment devices and parameters                            Rain tank Restaurant
     Low flow by-pass m3/sec                                               0
     High flow by-pass m3/sec                                             100
     Volume below overflow pipe kL                                        100
     Depth above overflow (m)                                             0.2
     Surface area m2                                                       5
     Overflow pipe diameter (mm)                                          150
     Anunal demand 9kU r scaled by daily PET                               0
     Daily demand (kUday)                                                7.633
     Monthly distribution of annual demand kU r                            0



Table B-4: Stage I MUSIC Model Input Parameters - Treatment Devices (B)
                                                    Bio-retention         Blo-retention
        Treatment devices and parameters
                                                        CIA                   C1B
  Low flow by-pass m3/sec                                   0                       0
  High flow by-pass m3/sec                                 100                     100
  Surface area m2                                          52                      37
  Extended detention depth (m)                             0.2                     0.2
  Seepage loss mm/hr                                        0                       0
  Filter area m2                                           63                      74
  Filter depth (m)                                         0.5                     0.5
  Filter median particle diameter (mm)                  0.45                     0.45
  Saturated hydraulic conductivity mm/hr                   150                     150
  Depth below underdrain pipe.(% of filter depth)           0                      0
  Overflow weir width (m)                                   3                      3

Page 42

  Table B-5: Stage 1 MUSIC Model Input Parameters - Treatment Devices (C)
                    Treatment devices and parameters      Swale North

              Low flow by-pass m3/sec                             0
              High flow by-pass m3/sec                           100
              Length (m)                                         25
              Bed Slope                                          1.0
              Base Width (m)                                     0.1
              Top Width (m)                                      5.0
              Depth (m)                                          0.5
              Vegetation Height (m)                          0.25
              Exfiltration Rate mm/hr                            75



                       STAGE I ONLY MUSIC MODEL OUTPUTS

        Table B-6: Stage I MUSIC Model - Treatment Train Effectiveness
    Treatment Train Effectiveness           Sources    Residual Load    % Reduction
Flow MU r                                       13          11              15
Total Suspended Solids k / r                  2420         567              77
Total Phosphorus k / r                         5.9          1.8             69
Total Nitrogen k / r                           33           18              46
Gross Pollutants (kg/yr)                       214           0              100

Page 43

        FULL DEVELOPMENT MUSIC MODEL SUMMARY



                                                         0'                    Pool Bu&kbry A




                                                                              Ob


                                                       51rack Tarks' O fl           R;w+s Ytx;rt




                                                              0'
                                                          ^ra,k TJ1kg t.t 1
                                                                                    rc^
Racer. nq Node
                                       5;^
                                   Btu-Petenbon 81
                                                                              F16
                                                                         Mwote Ground




                                                         Rain Tank BId B       Pool Budmnq B




                                                               0     4



                                  e-iv-Retertfcr C1e




                                       1-01                    a D
                                                       Pair. Tark Ccmmgrci     Restaurart - R„.t


                                  B^o-Rytrri^^r CiA




        Figure B-2: Full Development MUSIC Model diagram

Page 44

                                              FULL DEVELOPMENT MUSIC MODEL INPUT PARAMETERS

                                        Table B-7: Full Development MUSIC Model Input Parameters - Sources (A
                                                                                    Commercial
        MUSIC Model Inputs for the Essence of Pereglan: Full       Commercial
                                                                                  Podium (carpark,   North balance   Mid balance   South balance
                         Development                                (Offsits)
                                                                                      sho
Size (ha)                                                             0.278            0.205             0.389          0.335          0.146
% Impervious                                                            80               80               11             11              11
Rainfall threshold (mm/day)                                              1               1                 1              1               1
Soil storage capacity (mm)                                             120              120               400           400             400
Initial storage (% of capacity)                                         25               25               10             10              10
field capacity (mm)                                                     80               80               200            200            200
infiltration capacity coefficient - a                                  200              200               50             50              50
infiltration capacity exponent - b                                       1               1                 1              1               1
initial depth (mm)                                                      50               50               50             50              50
daily recharge rate (%)                                                 25               25               25             25              25
daily baseflow rate (%)                                                 5                5                 5              5              5
daily deep seepage rate (%)                                             0                0                 0              0              0
TSS Base flow conc. Params (Mean, Std Dev) (Log mUL                 0.78, 0.39       0.78, 0.39         1, 0.34        1, 0.34         1, 0.34
TSS Storm flow conc. Params (Mean, Std Dev) (Log mUL)               2.16, 0.38       2.16, 0.38        2.18, 0.39     2.18, 0,39     2.18, 0.39
TP Base flow conc. Params (Mean, Std Dev) (Log mUL)                  -0.6, 0.5        -0.6, 0.5       -0,97, 0.31    -0.97, 0.31     -0.97, 0.31
TP Storm flow conc. Params (Mean, Std Dev) (Log mUL)                -0.39, 0.34      -0.39, 0.34      -0.47, 0.31    -0.47, 0.31     -0.47, 0.31
TN Base flow conc. Params (Mean, Std Dev) (Log mUL                  0.32, 0.3         0.32. 0.3         0.2, 0.2       0.2. 0.2       0.2, 0.2
TN Storm flow conc. Params (Mean, Std Dev) (Log mUL)                 0.37, 0.4        0.37. 0.4        0.26, 0.23     0 26, 0.23     0.26, 0.23

Page 45

                                        Table B-8: Full Development MUSIC Model Input Parameters - Sources (B
    MUSIC Model Inputs for the Essence of Pereglan                                    Shack roofs    Shack roofs   Shack roofs      Roof
                                                         Roof Bldg A    Roof Bldg B
                 Full Dove
                      Development                                                        North           Mid         South        Restaurant
Size ha                                                     0.155          0.155         0.077          0.037         0077           019
% Impervious                                                 100            100           100            100           100           100
Rainfall threshold (mm/day)                                    1             1              1             1              1             1
Soil storage capacity (mm)                                   400            400           400            400           400           400
Initial storage (% of capacity)                               10            10             10            10             10            10
field capacity (mm)                                          200            200           200            200           200           200
infiltration capacity coefficient - a                         50            50             50            50             50            50
infiltration capacity exponent - b                             1             1              1             1              1             1
initial depth (mm)                                            50            50             50            50             50            50
daily recharge rate %                                         25            25             25            25             25            25
daily baseflow rate %                                          5             5             5              5             5              5
daily deep seepage rate %                                      0             0             0              0             0              0
TSS Base flow conc. Params (Mean, Std Dev) (Log mUL         1, 0.34       1, 0.34        1, 0.34       1, 0.34        1, 0.34       1, 0.34
TSS Storm flow conc. Params (Mean, Std Dev (Log mL/L)     2.18, 0.39     2.18, 0.39    2.18, 0.39     2.18, 0.39    2.18, 0.39    2.18, 0.39
TP Base flow conc. Params (Mean, Std Dev (Log mUL         -0.97, 0.31   -0.97, 0.31    -0.97, 0.31   -0.97,0.31     -0.97, 0.31   -0.97, 0.31
TP Storm flow conc. Params (Mean, Std Dev) (Log mUL       -0.47, 0.31   -0.47, 0.31    -0.47, 0.31   -0.47, 0.31    -0.47, 0.31   -0.47,0.31
TN Base flow conc. Params (Mean, Std Dev) (Log mUL         0.2, 0.2       0.2, 0.2      0.2, 0.2       0.2, 0.2      0.2 0.2       0.2, 0.2
TN Storm flow conc. Params Mean, Std Dev) (Log mUL        0.26, 0.23     0.26, 0.23    0.26, 0.23     0.26, 0.23    0.26, 0.23    0.26, 0.23

Page 46

         Table B-9: Full Development MUSIC Model Input Parameters - Treatment Units
       Treatment devices and parameters           BloretenUon   Bloretentlon    Bloretentlon    Bloretention
              Full Development                        CIA           CIB              81             Al

Low flow by-pass (m3/sec)                             0              0               0               1
High flow by-pass m3/sec                             100            100             100             100
Extended detention depth (m)                          0.2           0.2             0.2             0.2
Seepage loss (mm/hr)                                   0             0               0               0
Filter area mz                                        63            74              81              95
Filter de pth ( m )                                   0.5           0.5             0.5             0.5
Filter median particle diameter (mm)                 0.45          0.45            0.45            0.45
Saturated hydraulic conductivity (mm/hr)             150            150             150             150
Depth below underdrain pipe (% of filter depth)        0             0               0               0
Overflow weir width (m)                                2             3               3               3


                            FULL DEVELOPMENT MUSIC MODEL OUTPUTS

           Table B-10: Full Development MUSIC Model - Treatment Train Effectiveness
             Treatment Train Effectiveness          Source      Residual Load       % Reduction
          Flow ML/ r                                  19                  13              30
          Total Suspended Solids k / r               3790                451              88
          Total Phosphorus k / r                      8.5                1.8              79
          Total Nitrogen k / r                        46              20.3                56
          Gross Pollutants k / r                      387              0                  100

Page 47

 

APPENDIX C:

SEDIMENT AND EROSION CONTROL PLAN DAILY
CHECKLIST

Page 48

                 EROSION AND SEDIMENT CONTROL DAILY SITE CHECK LIST
                                   on your b u ilding site

I                                                                                                                                             TIMING
                                                                                                                                 v+       f c- S R1         z         r1
                                                                                                                                          0 c d             0         0
                                           ITEM AND/OR LOCATION TO CHECK                                                         0
                                                                                                                                             °
                                                                                                                                             D l^ 0-
                                                                                                                                                     T                3
                                                                                                                                                 0 `<       tl        ^
                                                                                                                                 0                                    0

                                                                                                                                 N               D
                                                                                                                                                 A




                   g. Is the road clean of sand, silt and mud?
                       NOIF:
                       • Do the tradespeople have the capacity to clean-up the sediment
                          before they leave the site?

                   h. Is there a contained area for building waste on site?
                        NOTE:
                        • Use a skip bin and/or mesh trap.
                        • Cover the waste cage/bin at the end of each work day.
                        • Place food packaging into-waste cage/bin after each meal break.
                        •    Skip or waste cage should not be allowed to overflow.

                        • Cover loads of waste when delivering to waste facility.

                   i.   Are filter socks/sand bags in place?

                   j.   Are the stormwater gully traps in front of the site protected from sediment
                        run-off, well maintained, safe for the public and approved by council?

                   k. Are the 'wet trades' setting/washing up behind a sediment fence
                        and on grassed areas that will hold the volume of waste?

                   1.   Are the stockpiles/sand/soil adequately protected?
                        NOT[:
                        •    Covered by a plastic sheet.
                        •    Located behind a sediment fence.
                        •    Sand bags around base.

                   m. At the end of each working day do the temporary stockpiles on hard surfaces have:
                      • a bund wall of sandbags, fibre or geotextile sausage on the downslope of the stockpile?
                      • a waterproof / windproof covering?
                      • an up-slope diversion of sandbags, fibre or geofabric sausage for on-site stockpiles?
                      • sandbags or geotextile bags filled with gravel surrounding the stockpile (if on road reserves)?

                   n. Are the grass/turf strips on the footpath cleared of sediment, sand and mud?

                   o. Are the service trenches backfilled?

                   p. Are the temporary downpipes correctly connected?

                   q. Is there an exposed aggregate driveway? If so, does the concretor
                        know/practice the correct control measures?

                   r.   Has the client been advised about erosion and sediment control requirements?
                        NOTF:
                        • The site must have adequate control measures on-site at all times,
                          even after hand over.



    For `urther,n!orrra:ron about the I lea thy Waterways Ca'np&yn ana I re Farr ersn,p Telephone 1071 3403 4206 or v.s r the HeaI:hy Waterways webs :e n www.healthywaterways.'




        rq-,            1111111iiiiIIIN
                        CSC                      4a
                                                1 OGAN
                                                             ar
                                                                TL                                                                                       lisp 4.ar•fa E•a.r' 3   q,t.

Page 49

1
    1
I
I       EROSION AND SEDIMENT CONTROL
        DAILY SITE CHECK LIST
                                                        on your building site


        Location of site

        Site Supervisor



        It is suggested that the site supervisor completes the following checklist daily while site work occurs.

                                                                                                             TIMING
                                                                                                                           r'
                                                                                                       o      S 0      o   o
                                ITEM AND/OR LOCATION TO CHECK                                              » to. S         v
                                                                                                   0          = 9M0.   a   o.
                                                                                                           0C
                                                                                                   N          S




           a.   Have the tradespeople and suppliers been made aware of the
                requirements for erosion and sediment control, and the consequences
                involved if there is a breach?

           b. If required, has an Erosion and Sediment Control Management Plan been
               prepared and approved?
               • Are all contractors and subcontractors aware of the contents of this plan?

           c. Is the builder's sign displayed?

           d. Are the sediment fences erected adequately/correctly?
                NOTE:

                •   Geotextile sediment fence buried at least 200 mm below ground.
                •   Posts installed at minimum 2m spacing.
                •   Built up sediment should not exceed 1/3 of the height of the sediment fence.
                •   No tears or rips.
                •   Not laying down or covered over by materials.
                •   Is there an advisory/attention sign on the sediment fence?

           e. Is the stabilised entry/exit point (rumble pad) in the correct location?
                NOTE:
                • Are all tradespeople/suppliers using this entry point?

           f.   Does the entry/exit point (rumble pad) require maintenance?
                NOTE:
                • Has the entry/exit pad got excessive sediment in it?
                • Turn over with a machine to expose the coarse aggregate again.
                • Aggregate must be 40 mm or greater.
                • Is there a bunding/diversion drain above the stabilised entry/exit point
                  (rumble pad) to divert sediment behind the sediment fence?
                • Are the tradespeople using an adjacent lot to gain entry to the site?
                  If so, has permission been sought from the land owner(s) and are there
                  control measures in place to prevent the movement of sediment off the
                  lot and into the gutter?

Page 50

            APPENDIX D:

LONG TERM MAINTENANCE OF STORMWATER
        MANAGEMENT FACILITIES


[OCR of page images]
APPENDIX D:

LONG TERM MAINTENANCE OF STORMWATER
MANAGEMENT FACILITIES

 

 

Page 51

EP-SECP-01: Up-slope stormwater flow diversion
1. Objectives/Targets       To reduce the transport capacity of stormwater crossing the building site
2. Management Strategy      1) Divert up-slope stormwater around the building site;
                            2) Divert stormwater around areas of soil disturbance; and
                            3) Divert stormwater onto stable ground or areas where suspended sediment can
                            settle.
3. Tasks/Actions            Building site
                            1) Construct a perimeter bank along the upslope (eastern) edge of the development
                            to divert flow around the building site, and onto grassed or stabilised surfaces on the
                            edge of the building site;
                            2) Stabilise the perimeter bank with erosion mats (e.g. jute mesh mat anchored by
                            cold anionic bitumen emulsion); and
                            Erosion prone hot-spots
                            3) Place geo-logs/straw wattles within the building site, upslope of areas of high
                            disturbance or high erosion hazard. Direct flow onto grassed or stabilised ground.
                            Ensure secure pegging of geo-logs to prevent flow under the log. The edge of the
                            geo-log needs to overlap the stable or grassed surface.
4. Performance Indicators   1) Effective diversion of stormwater away from the building site, and in particular
                            away from areas of high erosion hazard;
                            2) No evidence of soil erosion on site, such as rills or sheet erosion.
5. Monitoring               1) Inspect the structural integrity of the perimeter bank and geo-logs;
                            2) Inspect the ground surface for erosion;
                            3) Inspect performance of the geo-log during a stormwater event (low turbidity of
                            diverted water, no erosion under the geo-log;
                            4) Effective direction of diverted water onto grassed or stable ground).
6. Frequency/Deadlines      1) Structural integrity & evidence of erosion: daily
                            2) Performance during stormwater event: During significant stormwater events.
7. Responsibilities         Building contractor.
8. Reporting and Review     Exception reporting to the site manager and senior management.
9. Contingency              When loss of control of the upslope flow diversion occurs:


                            1) Inspect existing structure for points of failure;
                            2) Report situation to site manager immediately, and request support;
                            3) If feasible redirect flow away from the point of failure onto stable ground;
                            5) Bridge points of failure with stable material (e.g. sandbags);
                            6) Collect water quality samples at inflow and outflow points (section 11)
10. Corrective actions      1) If necessary remove sediment mobilised on road surfaces with a spade and
                            broom. Do not use water.
                            2) Repair perimeter bank: reinstall berm, secure the jute mat.
                            3) Repair or replace geo-logs if damaged. Securely peg to the ground to ensure no
                            flow under log.
                            4) Add a second geo-log 1 to 4m upslope if necessary;
                            5) Improve the stability of ground surface that receives diverted water. Refer to EP-
                            SECP-05.

Page 52

EP-SECP-02: Site entry and exit points
1. Objectives/Targets        To avoid sediment being transported off the site by vehicles
2. Management Strategy       1) Dislodge loosely bound sediment attached to vehicles by vibration;
                             2) Trap dislodged sediment in the interstices of a metal grid or gravel bed; and
                             3) High pressure water hose to remove mud stuck to truck tyres during wet weather.
3. Tasks/Actions             1) Install an access path of crushed rock leading into the site, and directly to the
                             stockpile area. Rock pads should be at least 15 m long and 200 mm thick, with an
                             underlying layer of geo-fabric. Use cattle ramps as part of the structure to allow 2
                             complete rotations of the largest tyre leaving the site.
                             2) Install a high pressure water hose that can reach the rock pad, to remove
                             cohesive mud.
4. Performance Indicators    Spillage of sediment from the site through the exit, and onto the public road.
5. Monitoring                Inspection of the road surface beside the exit for sediment movement off the site.
6. Frequency/Deadlines       Inspect the exit: daily.
7. Responsibilities          Building contractor.
8. Reporting and Review      Exception reporting to the site manager and senior management.
9. Contingency               When sediment transport from the site access point is occurring:


                             1) Place sandbags at stormwater drain entry to prevent spilt sediment from being
                             washed into stormwater drains;
                             2) Report situation to site manager immediately, and request support;
                             3) Halt traffic until situation is under control;
                             4) Initiate corrective actions;
                             5) Remove sandbags when the spill has been cleared.
10. Corrective actions       1) Remove sediment from road surface using a spade an broom. Do not use a hose;
                             2) Building contractor to advise staff about responsibilities inherent with hosing off
                             mud;
                             3) Install extra length of pock pad or grid if necessary;
                            4) Improve delivery of high pressure water hose if possible;
                             5) Avoid work under muddy conditions.

Page 53

EP-SECP-03: Designated on-site stockpiles and waste receptacles
1. Objectives/Targets       To keep building materials and building waste on-site
2. Management Strategy      Containment of stockpiles and building waste wholly on the building site.
3. Tasks/Actions            1) Install skips or reo-cages in which to place waste, at multiple sites of convenience
                            across the site, so that winds cannot blow the waste off-site;
                            2) Have a designated site for stockpiling excavated earth, building sand, building
                            materials. Ensure that the stockpiles have designated covers with pegs to protect
                            them from wet weather, and are sufficiently distant from kerbside drains;
                            3) The designated area for cement and paint materials must be away from kerbside
                            drains;
                            4) Install a geo-log upslope to divert flow around the stockpile;
                            5) Install a sediment fence down-slope of stockpile area to collect sediment; and
                            6) At the end of each day, or before the onset of rain, cover and securely peg
                            stockpiles. Ensure that waste has been placed in the waste receptacle.
4. Performance Indicators   1) Sediment accumulation against the sediment fence;
                            2) Stockpile covered when required; and
                            3) Effective containment of waste.
5. Monitoring               1) Inspection of geo-log and sediment fence for structural integrity;
                            2) Inspect the sediment fence for sediment accumulation;
                            3) Inspection of stockpile for effective cover, or wetness and erosion if cover has
                            been removed; and
                            4) Inspection of the waste receptacle and building site for litter containment.
6. Frequency/Deadlines      Daily inspection.
7. Responsibilities         Building contractor.
8. Reporting and Review     Exception reporting to the site manager and senior management.
9. Contingency              When loss of materials from the stockpiles and waste receptacles is occurring:
                            Waste Receptacle
                            1) Report situation to site manager immediately, and request support;
                            2) Collect loose litter and place in bags,
                            3) Identify point of failure in waste receptacle and temporarily bridge the point of
                            failure;
                            4) Place bagged litter in waste receptacle;
                            5) Initiate corrective actions.


                            Stockpile
                            1) Report situation to site manager immediately, and request support;
                            2) Identify points of failure in upstream flow control or downstream sediment fence.
                            Place sandbags upslope to divert flow away from the points of failure;
                            3) Initiate corrective actions;
                            4) Collect water quality samples at inflow and outflow points (section 11).
10. Corrective actions      1) Repair geo-logs, perimeter stockpile covers, waste receptacles, and sediment
                            fences if required;
                            2) Address upslope controls if required (refer to EP-SECP-01);
                            3) Building contractor to reinforce the need to keep a tidy site and cover stockpiles.

Page 54

1. Objectives/Targets       To reduce the transport capacity of stormwater exiting the site, and remove
                            sediment from stormwater entering the site.
                            To prevent pollutants from the building site entering Noosa National Park
2. Management Strategy      1) Slow the velocity of stormwater flowing across the building site;
                            2) Use sediment fences to pond stormwater at strategic points in the building site, so
                            that suspended sediment can settle;
                            3) Direct stormwater from sediment fences over grass filter strips onto which
                            suspended sediment can settle.
                            4) Install filter socks in the sediment fence against the wetland to passively filter
                            sediment from stormwater entering the terminal wetland, and
                            5) Sediment curtain in the terminal wetland to contain sediment that may have
                            passed the upstream control measures.
3. Tasks/Actions            1) Install geo-textile sediment fences on the lower slopes of the building site. Posts
                            should be minimum of 2 m spacing, the base should be buried at least 200 mm
                            below ground. the fences should be concave upslope to bund stormwater. while
                            allowing lateral overflow down-slope;
                            3) Stabilise ground that accommodates overflow from the sediment fences to avoid
                            rill development. Refer to EP-SECP-05;
                            4) Direct overflow into down-slope sediment fence. Filter socks will be used as a
                            final barrier to contain suspended sediment. Overflow through the filter socks wi
                            into the terminal wetland. Use water from the terminal wetland to irrigate group,
                            cover (refer to EP-SECP-05);
                            5) Install a sediment curtain in the terminal wetland to contain any fine sediment
                            overtopped stormwater. This sediment will settle out in the wetland hohind th('
                            sediment screen.
                            6) Install temporary downpipes from newly constructed roof,.
4. Performance Indicators   1) No rill development;
                            2) Low turbidity of sediment in overflow from the sediment fence into the terminal
                            wetland;
                            3) Containment of stormwater behind the sediment curtain in the terminal wetland;
                            and
                            4) Prompt connection of temporary downpipes on the building site.
5. Monitoring               1) Rills are absent from the building site;
                            2) Build up of sediment behind sediment fences should be no more than 1/3 of the
                            fence height;
                            3) Sediment fences should be structurally sound;
                            4) Suspended solids in overtopped stormwater entering the terminal wetland are not
                            excessively high when compared with suspended solids entering the construction
                            site.
6. Frequency/Deadlines      1) Inspection for rills: immediately after rainfall events,
                            2) Inspection of sediment fences for structural integrity and sediment accumulation:
                            weekly and immediately after a rainfall event;
                            3) Suspended solids of stormwater flowing into and out of the building site: during
                            stormwater events.
                            4) Inspection of temporary downpipe connection: after roof installation.
7. Responsibilities         Building contractor.
8. Reporting and Review     Exception reporting to the site manager and senior management.
9. Contingency              When significant loss of sediment down-slope is occurring:


                            1) Report situation to site manager immediately, and request support;
                            2) Divert flow upstream away from point of failure;
                            3) Bridge the point of failure using sandbags;
                            4) Collect water quality samples at inflow and outflow points (section 11);

Page 55

EP-SECP-04: Down slope sediment controls
                           5) Inform relevant authorities;
                           6) Implement corrective actions.
10. Corrective actions     1) Improve ground cover if rills are evident;
                           2) Repair sediment fences;
                           3) Remove sediment from sediment fences and stockpile (refer to EP-SECP-03) for
                           later use as topsoil; and
                           5) Install temporary downpipes promptly.

Page 56

EP-SECP-05: Maintaining ground cover
1. Objectlves/Targets       To avoid erosion of soil from the building site.
2. Management Strategy       1) Minimise exposure of unstable soil in stockpiles and disturbed ground.
3. Tasks/Actions             1) Maintain existing grass cover as much as possible;
                            2) Cover disturbed ground under erosion blanket, secured with pegs and with the
                            edge buried below the soil surface.
                            3) Reseed disturbed soils that will be left bare, using hydromulch or equivalent
                            Irrigate reseeded area daily for four weeks to establish the grass surface.
                            4) Lay turf in areas where concentrated flow is expected (e.g. at the overflow of
                            sediment fences).
4. Performance Indicators   1) Lack of ground cover kept to a minimum;
                            2) Ground covered with remnant grass (undisturbed state), erosion blankets (short
                            term disturbance) or reseeded grass (longer term after disturbance); and
                            3) Lack of surface erosion.
6. Monitoring               1) Temporarily disturbed ground is covered with erosion ma!
                            2) Reseeding and irrigation of bare ground is occurring
                            3) 100% vegetation cover 4 weeks after establishment.
                            4) Rills are not present on the building site;
                            5) Suspended solids in water exiting the site are not excessively higher than water
                            entering the site.
6. Frequency/Deadlines      1) Cover with erosion mats: daily:
                            2) Cover with grass: daily;
                            3) Reseeding and irrigation schedule is being maintained: daily;
                            4) Rills on the building site: after stormwater events; and
                            5) Suspended solids in water entering and exiting the site: during stormwater
                            events.
7. Responsibilities         Building contractor.
8. Reporting and Review     Exception reporting to the site manager and senior management.
9. Contingency              When water is flowing over unstable ground:


                            1) Use sandbags to divert flow from upstream away from unstable ground onto
                            stable ground;
                            3) Cover the point of failure using erosion mats;
                            4) Collect water quality samples at inflow and outflow points (section 11);
                            5) Report situation to site manager,
                            6) Implement corrective actions.
10. Corrective actions      1) Building contractor to reinforce the need for managing off site movement of
                            disturbed soil because of the high environmental values associated with Noosa
                            National Park:
                            2) Ensure that erosion mats are intact and properly installed;
                            3) Ensure that re-seeding and irrigation is occurring. Install additional erosion mats,
                            grass cover, or turf if necessary.

Page 57

EP-SECP-06: Stabilizing soil stockpiled for Stage 2 development
1. Objectives/Targets       To avoid mobilising soil stockpiled in the Stage 2 development.
2. Management Strategy       1) Minimise exposure of unstable soil in stockpiles and disturbed ground.
3. Tasks/Actions             1) Install up-slope stormwater flow diversion (refer to EP-SECP-01);
                            2) Install down-slope sediment control (refer to EP-SECP-04
                            3) Use an erosion mat as a temporary measure to cover unconsolidated sediment
                            when building the stockpile. Cover if rain is imminent, or when the stockpile is left
                            overnight. Peg down the edges of the erosion blanket.
                            4) Reseed stockpiled soils using hydro-mulch or equivalent. Lightly irrigate
                            reseeded area daily for four weeks to establish the grass surface.
                            4) Lay turf in areas down-slope of the stockpile where concentrated flow is expected
                            (e.g. at the overflow of sediment fences).
4. Performance Indicators   1) Stockpile covered with erosion mat (short term disturbance) or reseeded grass
                            (longer term after disturbance); and
                            2) Lack of surface erosion.
5. Monitoring                1) Temporarily disturbed ground is covered with erosion mats;
                            2) Reseeding and irrigation of bare ground is occurring;
                            3) 100% vegetation cover 4 weeks after establishment;
                            4) Rills are not present on the building site:
                            5) Suspended solids in water exiting the site are not excessively higher than water
                            entering the site.
6. Frequency/Deadlines       1) Cover with erosion mats: daily;
                            2) Cover with grass: weekly;
                            3) Reseeding and irrigation schedule is being maintained: daily;
                            4) Rills on the building site: after stormwater events; and
                            5) Suspended solids in water entering and exiting the site: during stormwater
                            events.
7. Responsibilities         Building contractor.
8. Reporting and Review     Exception reporting to the site manager and senior management.
9. Contingency              When water is flowing over unstable ground:


                            1) Use sandbags to divert flow from upstream away from unstable ground onto
                            stable ground;
                            3) Cover the point of failure using erosion mats;
                            4) Collect water quality samples at inflow and outflow points (section 11);
                            5) Report situation to site manager;
                            6) Implement corrective actions.
10. Corrective actions      1) Building contractor to reinforce the need for managing off site movement of
                            disturbed soil because of the high environmental values associated with Noosa
                            National Park,
                            2) Ensure that erosion mats are intact and properly installed;
                            3) Ensure that re-seeding and irrigation is occurring. Install additional erosion mats,
                            grass cover, or turf if necessary.

Page 58

                                  APPENDIX E:

         SEDIMENT AND EROSION MANAGEMENT PLAN
List of Certified Plans Included:
1105-155C-01-07, Rev A, Dec 2011 - Erosion and Sediment Control Plan - Full Development
1105-155C-01-08, Rev A, Dec 2011 - Erosion and Sediment Control Plan - Stage 1

Page 59

                                                                                                                                                                                                          ENTRY ROCK PAD & GRID
                                                                                                                                                                                                          STABLE GRASSED SURFACE
                                                                                                                                                                                                          TEMPORARY BACK-PUSH MOUND
                                                                                                                                                                                                          SEDIEMNT FENCE
                                                                                                                                                                                                          (SUPPORT POSTS AT 3m CENTRES MAX)
                                                                                                                                                                                                          STORMWATER FLOW DIRECTION
                                                                                                                                                                                                   ® NO ACCESS AREA (STRIP TURF AREA)




                                                                                                   Jl




                                                                                                                                                  fl
TENT DETAILS            0 NAME                                                                          fi.rl meet.
                                                                                                                                                                                                                     DRAWMKi TITLE

ONTRAST CONSTRUCTIONS   ESSENCE OF PERIGIAN
                                                                                                   t    ["rot n N X t1. *0..p r1 - my wit
                                                                                                        moha rr.. res iS retn rot p'xr77 N S tl   Simmonds & Bristow Pty. Ltd.                                       PROPOSED SITE EROSION
                                                                                                                                                                                                                                                        SCALE



                        STORMWATER TREATMENT                                    DESGNED   GE /AR   7
                                                                                                        •.enNm ro+.ro S t!
                                                                                                        DINT S(ALJ
                                                                                                        pt.e..n. k.tls. ¢c ^tkmleln Mepn t.
                                                                                                                                                  WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS                       & SEDIMENT CONTROL                    AS SHOWN
                                                                                ;PAWN      TA           rotmerrcnen!el..i.                                                                                           PLAN ((ONSTRU(TION PHASE)          JOB/PROPOSAL No
                        DESIGN                                                  (HE[NED
                                                                                                   1    A.,out xe rt be1=147t S 18N
                                                                                                        rttWt.ONre(a,"yl rk V                                                                                        FULL DEVELOPMENT                     1108-155C

                                               A 09/12/11 INITIAL VERSION
                                                                                                   S.   MMSSrne. dettehrru petm
                                                                                                                                                                                                                      -        A'us                     DWG No             REY
                                                                            TA SIQEO                                                                                                                                                  FOR INFORMATION
                                               PEI   DATE   I LOnP:NTS          DATE
                                                                                                                                                                Helping you make good dean water     AC.N010252418   PLOT NUMBER         DATE 09/12/1   1108- 155E-01-Q7     4I

Page 60

                                                                                                                                                                        E STABLE GRASSED SURFACE
                                                                                                                                                                                  SOIL STOCKPILE
                                                                                                                                                                                  TEMPORARY BACK-PUSH MOUND
                                                                                                                                                                                  SEDIEMNT FENCE
                                                                                                                                                                                  (SUPPORT POSTS AT 3m CENTRES MAX)
                                                                                                                                                                                  STORMWATER FLOW DIRECTION
                                                                                                                                                                        x         NO ACCESS AREA (STRIP TURF AREA)

                                                                                                                                                                    NOTES
                                                                                                                                                                   •  PLAN FOR STAGE 1 TEMPORARY SOIL
                                                                                                                                                                       STOCKPILE ONLY AND DOES NOT INCLUDE
                                                                                                                                                                      DETAILS FOR CONSTRUCTION PHASE SCEP
                                                                                                                                                                      REFER TO DWG J-1005-310-09 FOR DETAILS
                                                                                                                                                                       OF CONSTRUCTION PHASE
                                                                                                                                                                   •   STOCKPILE LOCATION IS INDICATIVE ONLY.
                                                                                                                                                                      ALTERATION TO STOCPILE DIMENSIONS WILL
                                                                                                                                                                      REQUIRE THE MOVEMENT OF THE GRASSED,-
                                                                                                                                                                      RUN-OFF AREAS AND SEDIMENTATION
                                                                                                                                                                      FENCES TO ACCOMODATE




aaTmAU                   AM                     EMSOMAE                          IMAIN             Lew
                                                                                                   a                                                                                           MA   1AIE           Off
                                                                                               I   =r ,144a1!       Simmonds & Bristow Pty. Ltd.
CONTRAST CONSTRUCTIONS   ESSENCE OF PERIGIAN                                                     ^^ei^f rlll                                                                                   PROPOSED SITE EROSION
                                                                                                                                                                                                                     AS SHOWN
                         STORMWATER TREATMENT                                    ® ff/TA       t Owm
                                                                                               l
                                                                                                                    WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS                               & SEDIMENT CONTROL
                                                                                 MAW     TA                                                                                                    PLAN, STAGE 1 SOIL AI OSKN1
                         DESIGN                                                  0M      Dis
                                                                                               L ^r^,Y^,l,l114
                                                                                                   .Il.lre.^^r.l                                                                               STOCKPILE 1108-155C
                                                                                               l •4lr^b=Wwd nrdrl
                                                 109/12/ 11INITIAL VERSION                                                                                                                                         FA FA        0.
                                                                             I-A SIM                                                                                                           ""FOR WORMTO
                                                o n DATE                     N Id1TE                                             ... Helping you make good dean water       A.C.N. 010252418   RQTN DAT609/12/11   1108-1550-01-08 a

Page 61

            APPENDIX F

WATER AND SOIL QUALITY SAMPLING MAP


[OCR of page images]
APPENDIX F

WATER AND SOIL QUALITY SAMPLING MAP

 

 

Page 62

                                                                                 I   1. 1 11
                                                                                J_1.




    Water Sample Point




0    I S011 Sample PL, -                                                                       EVEL - COMMEPCI PREC




                           Figure F-1: Sample Location Map of Surface Water and Soil Samples

Page 63

            GENERAL NOTES:
            1. ALL WORK ON THIS CONTRACT IS TO BE CARRIED OUT W ACCORDANCE WITH THE JOB SPECFKA71N AND TO THE SATISFACTION
                                                                                                                                                                                                                                                                                                                       DRAWING SCHEDULE
            OF THE LOCAL AUTHORITY AND THE ENGINEER,                                                                                            ASPHALT TYPE DGIO
                                                                                                                                                MINIMUM COMPACTED DEPTH
            2. THE CONTRACTOR IS TO CONTACT ENERGEX. TELSiRA. COUNCIL AND OTHER SERVICE AUTHORITIES AND LOCATE EXISTING                         30" ON HOT BITUMEN                                                                                                                                              10525 -C1      CIVIL WORKS NOTES AND
            UNDERGROUND SERVICES PRIOR TO CONSTRUCTION.                                                                                         PRIMER 0 1.0 I /mN.                                                                                                                                                            DRAWING SCHEDULE

            3. CONOUT LOCATIONS N SHOWN ON THE PLANS ARE PROVISIONAL ONLY AND THE CONTRACTOR IS TO LIAISE WITH THE ENGINKER,                                                                                                                                                                                    1052541        SITE FRONTAGE WORKS
            TELSTRA AND THE ELECTRICAL CONSULTANT FOR THEIR FINAL PLANS IMMEDIATELY PRIOR TO LAYING ROAD AND FOOTPATH
            (OMWIiS.
                                                                                                                                                                                                                                                                                                                               PLAN
            4. THE ENGIEERNG DESIGN IS BASED PARTLY ON A DATA TERRAIN MODEL COMPUTER GENERATED FROM THE SITE SURVEY AND SOME                                                                                                                                                                                    10525-(3       FRONTAGE WORKS
            ELEMENTS OF THE SURVEY DATA ARE INTERPOLATED AND MAY VARY FROM THE ACTUAL SITE CONDITIONS. THE CONTRACTOR                                                                                                                                                                                                          DETAILS
            SMALL LIAISE WITH THE ENGINEER AND SURVEYOR AND SET OUT TNF WORKS OILY FROM APPROVED REFERENCE PEGS AN LEVEL
            BENCH MARKS.
                                                                                                                                                                                                                                                                                                                10525-(4       BULK EARTHWORKS
            S. THE CONTRACTOR IS TO ORGANISE HIS WORKS SO THAT EROSION. DEPOSITION OF T. AND STORMNATER RUNOFF FROM IHE NOB                                                                                  COMPACTED SUBGRADE TO                                                                                             PLAN SHEET 1
            SITE DOES NOT EXCEED THE PRE (OISTRU(TDN RATES AT ANY PONT AS A RESULT OF HIS ACTIONS.                                              LEAN MIX PAVEMENT
                                                                                                                                                                                                             95% RELATIVE DENSITY
            6. (LEAR All VEGETATION FROM HOSE AREAS TO BE EXCAVATED OR FILLED. N OTHER AREAS WHERE CLEARING IS SPECIFIED.                       COPACTED N 200.0 LAYERS                                                                      s EXISTING PAVEMENT TO BE
            SELECTED (LLARING ONLY 5 TO BE CARRIED OUT BY RETANNG THOSE TREES MARKED BY THE ENGINEER AND LEAVING THE AREA                       TO 1N% RELATIVE DENSITY                                                                      CUT BACK UNTL FULL DEPTH
                                                                                                                                                                                                                                                                                                                10525-CS       BULK EARTHWORKS
            N A CONDITION SUITABLE FOR SLASHING                                                                                                                                                                                             PAVEMENT EXPDSED                                                                   PLAN SHEET 2
            7. THE CONTRACTOR IS TO PRESENT DP THE ANI FOR ON- MAINTENANCE AND OFF-MAT NTENANCE INSPECTIONS WHEN DIRECTED BY
                                                                                                                                                                                                                                                                                                                10525-(6       BULK EARTHWORKS
            THE ENGINEER WITH ALL PIPES. ROADS AND ALLOTMENTS FREE OF RUBBISH OR SILT AND WITH FOOTPATHS AND PARK AREA
            SLASHED OR MOWN. AND UIDERGROUA2 SERVICES OPENED FOR INSPECTION.
                                                                                                                                                                                  PAVEMENT JOINT DETAIL                                                                                                                        DETAILS
                                                                                                                                                                               ROAD WIDENING - DAVID LOW WAY
            0. NO WORK IS TO COMMENCE ON THE SITE UNTIL THE APPROVAL OF THE COUNCIL HAS BEEN RECEIVED N WRITING AND AN OFFICIAL                                                                                                                                                                                 1052547        LINEMARKING AND SIGNAGE
            PRE-START MEETING WITH A REPRESENTATIVE OF COUNCIL, AND THE ENGINEER HAVE BEEN HELD. THE CONTRACTOR IS TO OBTAIN                                                                                                                                                                                                       1T 3-VV ^i V1/^^
            A COPY OF THE MINUTES OF THE PRE-START MEETING AND SHALL COMPLY WITH ALL REQUIREMENTS THEREOF.

            9. ALL CONSIRUTION IS TO BE SET OUT BY THE CONTRACTOR FROM PEGGING OF ROAD CENTERlIE, MANHOLE POSITIONS, LOT                                                                                                                                                                                        10525-18       (ROSS SECTIONS AND ROAD
            STAKING AND TBMS PROVIDED BY THE PRINCIPALS LICENSED SURVEYOR.
                                                                                                                                                                                                                                                                                                                               LONGITUDINAL SECTION
            EARTHWORKS NOTES
                                                                                                                                                                                      E
                                                                                                                                                                                      E
            L CLEAR All. VEGETATION FROM THOSE AREAS TD BE EXCAVATED OR FLIED. ALL RUBBISH INCLUDING DEBRIS FROM CLEARING IS TO
            BE DISPOSED IN   ACCORDANCE WITH THE STANDARDS OF THE LOCAL AUTHORITY. BURNING WILL NOT BE ALLOWED                                                                            ASPHALT TYPE DG10 MINIMUM COMPACTED DEPTH
                                                                                                                                                                                                                                                                                                                     THESE DRAWINGS ARE TO BE READ N CONJUNCTION
                                                                                                                                                                                          30mm ON HOT BITUMEN PRIMER 0 1.0 I /m2.
            2. ALL ORGANIC MATERIAL. TOPSOIL, AND UNSUITABLE SUBGRADES ARE TO BE STRIPPED FROM THE AREA TO BE FILLED AND                                                                                                                                                                                             WITH CfOTECHNI(AL REPORT No. 001-16DA
            REMOVED FROM THE SITE      EXCEPT THAT SUFFICIENT TOPSOIL IS TO BE RETAINED FOR RESPREADING TO A MINIMUM DEPTH Of 100mm                                                                                                                                                                                  BY    BUTLER PARTNERS PTY. LTD.
            ALL OVER THE SITE AFTER FILLING TO LEVEL     WITH IMPORTED FILL. AFTER STRIPPING AS ABOVE THE WHOLE SITE IS TO BE                                                                                                                                                                                        DATED APRIL 2010
            COMPACTED AND PROOF ROLLED TO THE SATISFACTION Of THE                                                                                                                         BASE COURSE UNBOUND PAVEMENT TYPE 2.3. ICBR LSI
                                                                         GEOTECHNICAL CONSULTANT PRIOR TO PLACING OF IMPORTED FILL.
                                                                                                                                                                                          MIN. COMPACTED THICKNESS: 125mm. MIN. COMPACTION: 100% ROD.
            3. FILLING IS TO BE CARRIED OUT IN CONTROLLED LAYERS NOT TO EXCEED 200" DEPTH BY 2500 m'. EACH LAYER IS TO BE
            COMPLETELY COMPACTED TO
            A MINIMUM OF 95% RELATIVE DRY DENSITY FOR COHESIVE SOILS OR A MINIMUM DENSITY INDEX OF 70% FOR NON-COHESIVE SOILS AND                                                         SUB BASE (OURSE: UNBOUND PAVEMENT TYPE 2.3. ICBR 45)
            TESTED AND       APPROVEO BY THE GEOTECHNICAL CONSULTANT PRIOR TO THE PLACEMENT OF THE NEXT LAYER. THE TOP 300mm Of                                                           MIN. -COMPACTED THICKNESS: 12Smm. AN. COMPACTION: 100% ROD).
            THE ROAD SUOGRADE I5 TO BE      COMPACTED 10 A MINIMUM OF 98% RELATIVE DRY DENSITY.
                                                                                                                                                                                          LOWER StH BASE COURSE: INBOUND PAVEMENT TYPE 1.5. ICBR 15)
            4. THE WHOLE OF THE MATERIAL IN ANY PARTICULAR LAYER SHOULD BE HOMOGENOUS, AND IF NECESSARY SMALL QUANTITIES OF                                                               THICKNESS AS INSTRUCTED. MN. COMPACTION 100% ROD.
            FILL DIFFERING FROM THE     REST SHOULD BE SPREAD AS A THIN LAYER OVER THE WHOLE SITE AND INCORPORATED INTO A FULL                                                            !PRDVSIO.SAL                                       .-- -.,
            LAYER. IN A NT/FILL SITUATION THE     GEOTECHMCAL CONSULTANT MAY DIRECT THAT ANY EXISTING SOIL WITHIN 600mm OF THE
            FINISHED SURFACE LEVEL BE REMOVED AND REPLACED WITH       FILL EQUIVALENT TO THE GENERAL FILL MATERIAL. THE MATERIAL SO
            REMOVED MAY, F IT OTHERWISE MEETS THE SPECIFICATION, BE USED AS GENERAL                                                                                                       NATURAL SUBGRAU MN. 95% ROD FOR FILL PLACED TO WITHIN 300" OF LEVEL AND 97% R00 FOR THE TOP 300" BELOW THE
                                                                                          FILL AS ABOVE.
                                                                                                                                                                                          FINISHED SUBGRADE LEVEL.
            S. IMPORTED FILL IN ALLOTMENTS IS TO CONSIST OF IDFDGENOUS MATERIAL CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SIZE
            OF 100", A      MAXIMUM LINEAR STNN(AGE OF 8%, AND A MOISTURE CONTENT BETWEEN -2% TO r2% OF OPTIMUM MOISTURE
            CONTENT AT THE TIME OF COMPACTION.      IMPORTED FILL IN ROADWAYS IS TO CONSIST OF HOMOGENOUS MATERIAL CONTINUOUSLY
            GRADED WITH A MAXIMUM PARTICLE SIZE OF 100nm, A MINIMUM      (BR OF B. AND A MOISTURE CONTENT BETWEEN -2% TO e2% OF                                                      o       M             K.N. DEPTH TO BE DETERPIALD 3° LID ENGINEER AFTER 115111NG OF THE INSITU SUB-GRADE.
            OPTIMUM MOISTURE CONTENT AT THE TIME Of COMPACTION.

            6. THE CONTRACTOR SHALL ENSURE THAT ALL WORK IS CARRIED OUT, TESTED AND CERTIFIED AS CONTROLLED FILL IN COMPLIANCE
            WITH 45.3790     'MIN ON EARTHWORKS FOR COMMERCIAL AND RESIDENTIAL DEVELOPMENTS'. ALL TESTING AND INSPECTIONS
            ARE TO BE CARRIED OUT BY A NATA      CERTIFIED LABORATORY APPOINTED BY THE GEOTECN(AL CONSULTANT N ACCORDANCE
                                                                                                                                                                   TOPSOIL:
            WITH LEVEL ONE TESTING AS SET OUT N APPENDIX 8 OF AS.3790. THE CONTRACTOR SHALL PROVEN CERTIFICATION TO Tit ENGINEER
                                                                                                                                                                   TOPSOIL IS TO BE REMOVED. STOC PLED. AND REUSED TO COVER ALL DISTURBED EARTHWORKS TO A MINIMUM COMPACTED DEPTH Of
            ON COMPLETION OF THE EARTHWORKS.
                                                                                                                                                                   75a AND GRASSED.
                                                                                                                                                                   NOTE
            7. ALL `UNCONTROLLED FLL- IDENTIFIED ON SITE 10 BE REMOVED TO NATURAL SURFACE LEVEL AND. IF SUITABLE. REUSED AND
                                                                                                                                                                   ALL PAVEMENT WORK IS TO BE MARRED OUT N ACCORDANCE WITH SUNSHINE COAST REGIONAL COUNCIL TAOOFLKS AND
            PLACED AS SPECIFIED   ABOVE.
                                                                                                                                                                   SPECIFICATIONS.



                                                                                                                                                                                   PAVEMENT DETAIL
                                                                                                                                                                               ROAD EXTENSION - LANEWAY




                                                                                                                                                                                                                                                                                                                                                 TOD CONSULTING PTY. LTD.

                       PROPOSED ACCOMODATION AND                                                                                      CIVIL WORKS NOTES                                                                                                                                                                                                    AAA 71 PI MS 9m
                                                                                                                                                                                                                                                                                                                                                       20 Mary Slred, N.,sanllr


                       COMMERCIAL DEVELOPMENT                                                                                         AND DRAWING                                                                                                                                                      TOD                                           PD. Bow 61, Noo,o,lIIr 010 1566
                                                                                                                                                                                                                                                                                                                                                 Phone 1091 5119 9600 Fns 1011 5449 9494
                                                                                                                                                                                                                                                                                                                                                    (Mall   rnquiriesOlodronsuIIlnq.rom
                                                                                                                                                                                                                                                                                                                                                       Wrh    wv IakonsuIti-9 n

                       'ESSENCE OF PEREGIAN'                                                                                          SCHEDULE
                       DAVID LOW WAY                                                                (11                               STAGE I AND 2
                                                                                                                                                                                     21.11.11 AMEHDEO AS CLOUDED
                                                                                                                                                                                     11.10.11 AMENDED AS CLOUDED
                                                                                                                                                                                                                                                                                                             ENGINEERS

                                                                                                                                                                                                                                                                                                         STRUCTURAL CIVIL
                                                                                                                                                                                                                                                                                                                                        0n1'S. PRYSIUPA m,.m A. VENESS
                                                                                                                                                                                                                                                                                                                                        4mnm               [IrtSa
                                                                                                                                                                                                                                                                                                                                                                              Om+ MAY 2010


 ,IN MN


..,J w nr
                       PEREGIAN BEACH for                                                  essence                                                                                   2108.11 CONSTRUCTION STAGING ISSUE
                                                                                                                                                                                     30.11.10 OPERATIONAL WORKS ISSUE
                                                                                                                                                                                     10.06.10 OPERATIONAL WORKS ISSUE
                                                                                                                                                                                                                                                                                                                                               B. GEORGE
                                                                                                                                                                                                                                                                                                                                                           AW..d
                                                                                                                                                                                                                                                                                                                                                                    H. GRAY         N/A


                                                                                                                                                                                                                                                                                                                                                                                    A911

Nhtit, r               SCANLON PROPERTY GROUP                                                                                                                                        20.05.10 PRELIMINARY ISSUE
                                                                                                                                                                                                                                                                                                                                               10525
                                                                                                                                                                                                                                                                                                                                                           m,+n9 w
                                                                                                                                                                                                                                                                                                                                                                    Cl

Page 64

                                                                                                                                           KERI                                                                                                fns:-1
                                                                                                                                           HYD                                                                                                 ^! 2
                                                                                                             GRATED DRAIN T                F6cI
                                 KERB ^N11I PIT TO                                                           HYDRAULIC                                                 SEMI-MOUNTABLE
                                 HYDRAULIC                                                                   ENGINEERS DETA
                                 ENGINEERS DETAILS.

                                 NEW BARRIER
                                 KERB AND
                                                                                                                               ^^D--, - -•^ ....'---'ate-               ';                                                                          SIMI-MC1:41 A0 I                                              ^uLL-1,   i^r'       T .t.             q          r
                                                                                                                                                                             r-._
                                 IHANNEL                                                                                                               NEW R.C. DRWFWAY

                                 EXTEND EXISTING                                                                                                                                            -r ,
                                 DRAINAGE WORKS TO                                                                                                                     p°dD
                                 HYDRAULIC                                                                                                                                                  O^
                                                                                                                                                                MI M NTABLV             l
                                 ENGINEERS DETAILS.
                                                                                                                                                                 KER SM2
                                                                                                                                                                                                                                                                                       M d       -^,a      _^^                         I^   ^                  2              t ^                   ^i
                                                                                                                                                                                                                                                                                                         ny
                                                                                                                                                                                                                                                                                                   ii   nq II
                                                                                                                                                                                                                                                                                                                                                                          J
                                                                                                                                                                                                                                                                                   R         I               II                    E        ^,^ ,1\ 1^
                                                                                                                                                                                                                                             KERB




                                                                                                                                                                                                                                                                                                                                                                                                  Jot-

                                                                                                                               LHYDRAUUC-us->_'. __,-.
                                                                                                                               aBN(IIDES 9EA        SEMI'MQRITABLf
                                 RELAYING OF EXISTING                                                                         sti          .                S1L2
                                 PIPEWORK TO SUIT NEW ROAD
                                 LEVELS 10 HYDRAULIC
                                 ENGINEERS DETAILS,



                                 EXISTING ASPHALT
                                 PAVEME-lOTTOlkAVE A
                                 30mm ASPHALT OVERLAY
                                 AFTER ALL CONSTRUCTION
                                 EQUIPMENT/MATERIAL
                                                                                                                                                                       --    -
                                 DELIVERY VEHICALS ARE NO                                                                                                                         ---
                                 LONGER REQUIRED ON SITE.
                                                                                                                                     maw
                                                                                                                                            x                                    rn




                                                                                                                                                                                 C-3! Frl'
                                                         EXISTING CONCRETE                                                           p
                                                                                                                              x      F'`           NEW      FOOTPATH         ^^ - -
                                                         DRIVEWAY CROSSING
                                                                                                                                           4v I MINIMUM UM WIDTH TO
                                                                                                                                                  EBE T.Om TYPICAL.

                                                                                                                                                 oI                    RUBBLE LINED DRAW
                                                                                                                                                                       TD HYDRAULIC                                                       APPROXIMATE PO I110N OF
                                                                                                                                             ADS-                A' JNUIIEERS DETAI.             ?1   GRATED DRAIN TO                     RELOCATED BUS HELTER.
                                                                                                                                                                                                      HS'DRAULIQ
                                                                                                                                \.               ^            \^ _'_         .ADD I "
                                                                                                                                                                                                      ENGINEERS DETAILS.                                     RUBBLE LINED DRAIN
                                                                                                                                                                                                                                                             TO HYDRAULIC
                                                                                                                                                                                                                                                             ENGINEERS, DETAILS.
                                                                                                                                                                                                                                                                             d

         ba<A a[ Ke.e
                                                                             _ _ -SAS^EIir E       ASPHALT: _^,
                                                                                LFDR NEW OVERLA AND
                                                                                pBLEND JP4XISTING\,
                                                                                             LEVELS



                                                                                RAISE WATER ACCESS
                                                                                POINT HATCH 10 SUIT                                                                                                                                                                                                 BLEND T       ING
                                                                                NEW FOOTPATH LEVEL                                                                                                                                                                                                  PAVEMENT LEVELS
                                        DENOTES EXISTING                        AS REQUIRED.
                                        TREES TO REMAIN.                                                                                                                                                                 EXISTING CO


                                                                                          DENOTES FINISHED
               10   8   6    4      2      0                                              SURFACE LEVELS

                                           SCALE I:2DO                                    DENOTES EXISTING
                                                                                          SPOT LEVELS


                                                                                                                                           f1RAWINh    HILL
                                                                                                                                                                                                                                                                                                                                                                        TOD CONSULTING PTY. LTD.

                            PROPOSED ACCOMODATION AND                                                                                                 SITE FRONTAGE                                                                                                                                                                                                               1.6A 19 m NO SM
                                                                                                                                                                                                                                                                                                                                                                              10 Mary surd, N--Ili,


.y..pw ww                   COMMERCIAL DEVELOPMENT                                                                                                    WORKS PLAN                                                                                                                                                                   TOD                                      PO Boo 61, Noosabillr OLD 4566
                                                                                                                                                                                                                                                                                                                                                                        Phone 1071 5149 9600 Foe ID11 5149 9491
                                                                                                                                                                                                                                                                                                                                                                           EMad    enquiriesOtodnsatling(on
                                                                                                                                                                                                                                                                                                                                                                              Web    woo Iadronsulhngcon,
o«rs e..a nn                'ESSENCE OF PEREGIAN                                                                                                      STAGE 1                                            G    11.11.11    REVISED TO SUIT COUNCIL RA
                                                                                                                                                                                                                                                                                                                                            ENGINEERS
                                                                                                                                                                                                                                                                                                                                                                                                          del.
                                                                                                                                                                                                         F    14.08.11    CONSTRUCTION STAGING LSSIi1                                                                                                        U.n. PRYSTUPA I nar A. VENESS                       MAY 2010
                            DAVID LOW WAY                                                                                                                                                                E    30.11.10    OPERATIONAL WORKS ISSUE
                                                                                                                                                                                                                                                                                                                                        STRUCTURAL CIVIL                            (6x6'
                                                                                                                                                                                                                                                                                                                                                                   B. GEORGE                   H. GRAY             1x00
^n"np 9wrM.^                PEREGIAN BEACH for                                                essence                                                                                                    D
                                                                                                                                                                                                         C
                                                                                                                                                                                                         8
                                                                                                                                                                                                              6.07.10
                                                                                                                                                                                                              15.06.10
                                                                                                                                                                                                              10.06.10
                                                                                                                                                                                                                          SITE PLAN UPDATED
                                                                                                                                                                                                                          ASPHALT OVERLAY ADDED
                                                                                                                                                                                                                          OPERATIONAL WORKS ISSUE
                                                                                                                                                                                                                                                                                                                                                             91.er b.
                                                                                                                                                                                                                                                                                                                                                                      2   8
                                                                                                                                                                                                                                                                                                                                                                                    Avs.e..d              Darr
                                                                                                                                                                                                                                                                                                                                                                                                                   AID

aaxu-0                      SCANLON PROPERTY GROUP                                                                                                                                                     br
                                                                                                                                                                                                         A    28.05.10
                                                                                                                                                                                                               W.
                                                                                                                                                                                                                          PRELIMINARY ISSUE
                                                                                                                                                                                                                              bewq rnrr
                                                                                                                                                                                                                                                                                                                                                             bo w
                                                                                                                                                                                                                                                                                                                                                                   10525
                                                                                                                                                                                                                                                                                                                                                                                    Ororp w

                                                                                                                                                                                                                                                                                                                                                                                               C2        1,^ IiJ,/I1 G

Page 65

                                                                                                                                                                                   10mm COMPRESSIBLE              PROVIDE A PAREHFM 'OOWELFORM'
           PRAM RAMPS TO COMPLY WITH                                                                                                                                               MATERIAL WITH A   10mm         SLEEVE WITH A 016 INSERT TO                  APPROVED TOOL JOINT AT      R16-3OB GALVANISED OLWEL                                                          1 NR BAR
                                                                                                                                                                                                                                                                                           BARS. 400 LONG SUPPORTED ON              10mm COMPRESSIBLE
           IPWEAD SIANOARG DESIGN.                                                                                                                                                 SEALANT CAPPING                ALLOW FOR LATERAL MOVEMENT                   LOCATIONS ON PLAN
                                                                                                                                                                                                                                                                                         . DOWEL CRADLES OR FAR (HAIRS-             MATERIAL WITH A 10mm
           RIFER        IPWEAD SHEETS RIO                                                                                                                                                                         TO EVERY DOWEL.                                                I
                                                                                                                                                                                                                                                                                                                                    SEALANT CAPPING



                                                                                                                                                                                                                                                                                                                                    EXISTING SLAB
                                                                                                                                                                                                                                                                             STOP MESH 50mm EACH SIDE
                                                                                                                                                                                                                                                                                                                                                                         A16-300 GALVANISED DOWEL BARS. 300 LONG,
                                                                                                                                                                                                                                                                             OF JOINT AND PRIVIDE 1 N12
                                                                                                                                                                                                                                                                                                                                             REFER SLAB NOTE             DRILL AND EPOXY GROUT 100 INTO EXISTING
                                                                                                                                                                                                                                                                             BAR EACH SIDE OF JOINT,
                                                                                                                                                                                                                                                                                                                                                                         SLAB. PROVIDE A PAR(HEM 'DOWELFORM' SLEEVE
                                                                                                                                                               R16-300 GALVANISED DOWEL BARS, 400 LONG,                                                                                                                                                                  WITH A 016 INSERT TO ALLOW FOR LATERAL
                                                                                                                                                               SUPPORTED ON DOWEL CRADLES OR BAR (HAIRS.                                              CONSTRUCTION JOINT CJ2                                                                                             MOVEMENT TO EVERY DOWEL,

                                                                                                                                                                                CONSTRUCTION JOINT CJ1                                              (CONTRACTION JOINT - CONCRETE MAY BE                                             CONSTRUCTION JOINT CJ3
                                                                                                                                                                                                                                                     POURED CONTINUOUSLY THROUGH JOINT)
                                                                                                                                                                                            (EXPANSION JOINT)                                                                                                                                       30MPa CONCRETE
                                                                                                                                                                                                                                                                     30MPa CONCRETE
                                                                                                                                                                                             30MPa CONCRETE                                                                                                                                           APPROVED CUT JOINT
                                                                                                                                                                                                                                                                                                                                                      CUT ALTERNATE WIRE
                                                                                                                                                                                                                    14-                                                                                                                5L12 MESH      OF MESH ALONG LINE
                                                                                                                                                                                                                                                                                            01                                         SO COVER
                                                                                                                          (J1                                                                                                                                                              d(    i                                                    OF JOINT

                                            SEMI-MOUNTABLE
                                               KERB SM?


                                                                                                                                                                                                                                                                                                                                                SOmm SAND              ALL JOINTS MUST BE APPROVED
                                                                                                                  250                   a?                                                                                                                                                                                                      BEDDING                PRIOR TO CONSTRUCTION
                                            SEMI-MOUNTABLE
                                               KERB SM2                                              STORAGE TANK                                                                                                                                                                                                                             CRACK CONTROL
                                                                                                       EXTERNAL WAS R SLAB REFER

                                                PRA.1.
                                                      :
                                                          ,•^y,^,^

                                                    1 gAMPS TO COMPLY WITH
                                                                                                                             s 01,
                                                                                                     STRUCTURAL SHEETS 531 AND                                                                                                                                                                                                                 JOINT - CCJ
                                                                                                                                S32
                                                IPWEAd STANDARD DESIGN.                                                                                                                                                                                                                                                                          30MPa CONCRETE
                                                REfltR2 TO PWEAO SHEETS SEQ
                                                R,190 AND SED R-091. TYPICAL.
                                                                                                                                                                                                                                                                                                             KERB AND CHANNEL NOTES:
                                                                                                                                                                                                                                                                                                              1.REFER TO IPWEAQ STD DWG SEO R-0080 FOR FILL DETAILS OF KERB AND
                                                                                                                                                                                                                                                      DENOTES 200mm THICK CONCRETE SLAB ON
                                                                                                                                                                                                  DENOTES 100mm THICK CONCRETE SLAB ON                                                                          CHANNEL.
                                                                                                                                                                                                                                                      GROUND REINFORCED WITH SL92 MESH TOP.
                                                                                                                                                                                                  GROUND REINFORCED WITH SL72 MESH TOP.                                                                      2. SUBSOIL DRAINS ARE TO BE INSTALLED UNDER ALL KERB AND CHANNEL/KERB IN
                                                                                                                                                                                                                                                      30mm Cms, ON UNBOUND PAVEMENT TYPE
                                                                                                                                                                                                  JO= COVER N5t SAND BEDDING                                                                                 ACCORDANCE WITH PWEAD STD 1 WOSEI2 R=0140 TJNLISS OTHERWISE--DIRECTED
                                                                                                                                                                                                                                                      2.S (CBS 151 1SOmm MIN. TFO(K, COMPACTED TO
                                                                                                                                                                                                  TYPICAL U.N.O.                                                                                                BY THE ENGINEER.
                                                                                                                                                                                                                                                      100% ROD. TYPICAL U.N.O.
                                                                                                                                                                                                  DENOTES 1S0mm THICK CONCRETE SLAB ON                                                                       3. CAPPED CLEANING CONNECTIONS SHALL BE PROVIDE AT THE HEAD OF DRAINS
                                                                                                                                                                                                  GROUND REINFORCED WITH SL82 MESH TOP.               DENOTES 2S0mm THICK CONCRETE SLAB ON
                                                                                                                                                                                                                                                                                                                AND AT MAXIMUM 100m SPACES.
                                                                                                                                                                                                  30mm COVER, ON UNBOUND PAVEMENT TYPE                GROUND REINFORCED WITH SL92 MESH TOP. 30mm
                                                                                                                                                                                                                                                                                                             4. OUTLETS SHALL BE PROVIDED AT ALL PITS. HEADWALLS, ENDS OF KERB AND
                                                                                                                                                                                                  2.5 ICBS 1S) 150mm MIN. THICK, COMPACTED            COVER, AND N16-200 EACH WAY BOTTOM, SOmm
                                                                                                                                                                                                                                                      COVER, ON UNBOUND PAVEMENT TYPE LS ICBS 15)               CHANNEL/KERB OR OTHERWISE AT MAXIMUM 100m SPACES.
                                                                                                                                                                                                  TO 100% ROD. TYPICAL U.N.O.
                                                                                                                                                                                                                                                      150mm MIN. THICK. COMPACTED TO 100% ROD.               S. OUTLETS NOT AT DRAINAGE PITS OR HEADWALLS SHALL BE PROVIDED WITH A
                                                                                                                                                                                                                                                      TYPICAL U.N.O.                                            CONCRETE HEADWALL AND APRON WITH MARKER POST.


                                                           NEW R.C. FOOTPATH.
                                                                                                                                                                                                                                                  FULL DEPTH 10mm
                                                           MINIMUM WIDTH ID
                                                                                                                                                                                                                                                  COMPRESSIBLE MATERIAL                                                       150      150                 4SC
                                                           BE 2.Om TYPICAL.
                                                                                                                                                                                                                                                  WITH A 10mm SEALANT
                                                                                                                                                                                                                                                  CAPPING.
                                                                                                                                                                                                                                                                                                                                                           PROFILE TD
                                                                                                                                                                                                                                                                                                                                                           HATCH               SURFACING FALL
                                                                                                                                             SITION OF                                                                                                                                                                                                     EXISTING            TO INVERT AND
                                                                                                                                                                                                                                                                                                                          C
                                                                                                                                             SHELTER.                                                                                                                                                                                                                                PIT


                                                                                                                                                                                                                                                                                                                                                                                                 2004EAN MIX

                                                                                                                                                                                                                                                                                                                                                                                                 200mm LEAN MIX
                                                                                                                                                                                                                                                                                                     rr


                                                                                                                                                                                                                                                           SELECTED FILTER                                                                                              SELECTED FILTER MATERIAL
                                                                                                                                                                                                                                                           MATERIAL AS                                      SUBSOIL CLEANING                                            AS PER COUNCIL SPEC.
                                                                                                                                                                                                                                                           PER COUNCIL                                      POINT TO DETAILS ON
PRAM RAMPS TO COMPLY WITH                                                                                                                                                                                                                                  SPEC.                                            IPWEAD SID DWG No
IPWEAQ STANDARD DESIGN.                                                                                                                                                                                                                                                                                                                                                 TYPE A OR B CLEANING
                                                                                                                                                                                                                                                                                                            R 0146.
REFER TO IPWEAQ SHEETS SED                                                                                                                                                                                                                                                                                                                                              CONNECTION
                                                                                                         13.800
R-090 AND SEO R-091. TYPICAL-
                                                                                               EAISTNG CONCRETE ME                                                                                                                                                                                                                                                     100 0 SLOTTED
                                                                                EXISTING KERB AND                  '
                                                                                                                                                          RI                                                                                                                                                                                                           CORRUGATED P.P.C. PIPE
                                                                                CHANNEL TO BE REMOVED
                                                                                                                                                               EXISTING PEDESTRIAN
                                                                                                                                                               CROSSING
                                                                                                 LOW                                                     h m
                                                                                                                                                                                                                                      200 MN
                                                                                                                                                                                                                                                                                                                                                 225 MIN

                                                                                                                                 WAY
                                      1086420
                                      L1    I    I   I    I
                                                                                                                                                                                                            SEMI-MOUNTABLE KERB TYPE SM2                                                                           BARRIER KERB AND CHANNEL
                                                             SCALE 1:200



              PAO)t41                                                                                                   DRAWING TITLE                                                                                                  ASSOCIATED CONSULTANT
                                                                                                                                                                                                                                                                                                                                                                          TOD CONSULTING PTY. LTD.

                         PROPOSED ACCOMODATION AND                                                                              SITE FRONTAGE                                                                                                     GAG: 92UNS9I:I
                                                                                                                                                                                                                                                                 i
                                                                                                                                                                                                                                                                                                                                                                                   4Lx m01M100
                                                                                                                                                                                                                                                                                                                                                                                10 Mory Slred, it, OLlte


                         COMMERCIAL DEVELOPMENT                                                                                 WORKS DETAILS                                                                                                                                                             TOD                                                                P0. B.. 61, Noosarill    010 4566
                                                                                                                                                                                                                                                                                                                                                                          Phone 1071 5449 9600 Fo. (07) 5449 9494
                                                                                                                                                                                                                                                                                                                                                                             EMolt   enqulries0todconsuIting.rom
                                                                                                                                                                                                                                                                                                                                                                               Web     wow Iodconsull.ngcon

                         'ESSENCE OF PEREGIAN'
                         DAVID LOW WAY
                         PEREGIAN BEACH for
                                                                                     (A
                                                                                   essence
                                                                                                                                STAGE 1                         II
                                                                                                                                                                G
                                                                                                                                                                F
                                                                                                                                                                E
                                                                                                                                                                0
                                                                                                                                                                C
                                                                                                                                                                     21,11.11
                                                                                                                                                                     11.10.11
                                                                                                                                                                     24.09.11
                                                                                                                                                                     30.11.10
                                                                                                                                                                     6.07.10
                                                                                                                                                                     15.06.10
                                                                                                                                                                                REVISED TO SUIT COUNCIL All
                                                                                                                                                                                AMENDED AS CLOUDED
                                                                                                                                                                                CONSTRUCTION STAGING ISSUE
                                                                                                                                                                                OPERATIONAL WORKS ISSUE
                                                                                                                                                                                SITE PLAN UPDATED
                                                                                                                                                                                ASPHALT OVERLAY ADDED
                                                                                                                                                                                                                                                  CARL BRUNS.U
                                                                                                                                                                                                                                                                                                                    ENGINEERS

                                                                                                                                                                                                                                                                                                                   STRUCTURAL CIVIL
                                                                                                                                                                                                                                                                                                                                                                   "S. PRYSTUPA

                                                                                                                                                                                                                                                                                                                                                                 """B. GEORGE
                                                                                                                                                                                                                                                                                                                                                                 Sk.l W.3 .r B
                                                                                                                                                                                                                                                                                                                                                                                   or.on

                                                                                                                                                                                                                                                                                                                                                                                   [t«A.e

                                                                                                                                                                                                                                                                                                                                                                                   AM...6
                                                                                                                                                                                                                                                                                                                                                                                         A. VENESS

                                                                                                                                                                                                                                                                                                                                                                                          H. GRAY
                                                                                                                                                                                                                                                                                                                                                                                                      0.7.


                                                                                                                                                                                                                                                                                                                                                                                                      5004.
                                                                                                                                                                                                                                                                                                                                                                                                              MAY 2010



                                                                                                                                                                B    10.06.10   OPERATIONAL WORKS ISSUE                                                o,rGN! 0D 3011 C20

                         SCANLON PROPERTY GROUP                                                                                                                 A
                                                                                                                                                               Au
                                                                                                                                                                     28.05.10
                                                                                                                                                                      W.
                                                                                                                                                                                PRELIMINARY ISSUE
                                                                                                                                                                                   D,." .-d
                                                                                                                                                                                                                                                                                                                                                                 1.6

                                                                                                                                                                                                                                                                                                                                                                       10525
                                                                                                                                                                                                                                                                                                                                                                                   Or.oI g N.

                                                                                                                                                                                                                                                                                                                                                                                            C3

The text continues on page 66.

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.