Skip to the record
Accept no substitutions.

Council archive · source document

PART Response to Information Request · OPW11/0335

of 97

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

          The landscaping has been designed to maintain the unique natural context of the site,
          which abuts the Noosa National Park. An ecological analysis of the natural buffers to
          the wetlands adjacent to the national park has been conducted to protect the significant
          habitats of the national park and to ensure that stormwater runoff is properly managed to
          protect the ecological function of the wetland. Approximately one quarter of the
          development site has been allocated for environmental buffering (between 16 and 60 m
          in width), and weeds that presently exist in the buffer zone will be removed.

           The intensity of stormwater flows will be mitigated by a water storage tanks for each
           beach shack, and two (2) large underground water storage tanks for the apartment
           accommodation buildings, and one (1) large underground water storage tank for the
           commercial building. The captured water will be reused for non-potable domestic
           purposes (laundry, toilets), or for irrigation of the gardens. Stormwater will also be
           directed through a treatment train of Bio-retention Trenches with a gabion wall diffuser
           adjacent to the existing wetland area abutting the Noosa National Park. This treatment
           train is designed to achieve the water quality objectives listed in and Table 3-1.




©2012 Simmonds & Bristow Pty Ltd                         Contrast Constructions                          J-1005-310 - 13 January 2012
I:\CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP
SCEMP_Scanlon Property Group_V3.0 ta_120113.doc                                                                           Page 4 of 24

Used in these records

About this file

File size
26.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PART Response to Information Request.pdf · 26.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.