Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
OFFSITE CATCHMENT
HOTEUCOMMERCIAL
AREA
SOUTH CATCHMENT
(STAGE 1)
CLIENT DETAILS JOB NAME REVISION SCHEDULE DfLM General notes,
DRAWING TITLE
CONTRAST CONSTRUCTIONS ESSENCE OF PEREGIAN
I Copyryhl in all do(MMla. O'arogs and in
any works eeeculed from them shall nman
TIe property of S & B or on creation vast
Simmonds & Bristow Pty. Ltd. PROPOSED PIPE
2 nthSL8
WATER & ENVIRONMENTAL ANALYSTS & ROUTING AND
STORMWATER MANAGEMENT CES PFY 3 20 NOT SALE
CONSULTANTS CATCHMENT AREAS
C 13101/12 GENERAL UPDATE TA JrAws TA Ouoensions, levels, dr to be etrfied on
LAN 05/01/12 GENERAL UPDATE T / CHECKED D:B
L Lte prior In the e<mmenoeese nl of V rh
My discrepmms to be reported to S L 8 40 AEGRAL0 START, AOCIIIEA 410
for resolut on before carrying ONt the Po BOA 3100 YEAOIIGA 010 LIN AUSTAAUA
19/1211 INITIAL VERSL; N T Al SIGNED FA 1071 37v 1110
E DATE COMMENT! 1 EB1L CA'E
FAA 1071311q,1Ilping you make good dean water
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.