Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
EP-SECP-04: Down slope sediment controls
5) Inform relevant authorities;
6) Implement corrective actions.
10. Corrective actions 1) Improve ground cover if rills are evident;
2) Repair sediment fences;
3) Remove sediment from sediment fences and stockpile (refer to EP-SECP-03) for
later use as topsoil; and
5) Install temporary downpipes promptly.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.