Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
EXECUTIVE SUMMARY Simmonds and Bristow were commissioned by the Scanlon Property Group Pty Ltd to develop a Stormwater Management Plan (SWMP) and Sediment Erosion Control Plan (SECP) for the proposed Essence of Peregian development. The SECP assessed the erosion hazard and risk based on the soil and topography of the development site. The SECP provides information how to manage the erosion and off-site export of soil from the development site, and a statement of the personnel responsible for establishing and maintaining all erosion and sediment control measures. The SWMP described the management of stormwater from the developed site and upslope sources beyond the development area. The SWMP provided pre-development measurements of water quality and soil parameters from the proposed development area, and computer model outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with required guideline standards. These standards were agreed at the Joint Experts Conference, and are consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM 2009). Plans that describe the stormwater treatment train (Appendix A) and outputs from computer modelling used to support the stormwater design (Appendix B) are appended. These plans show the proposed site layout, the location of bioretention trenches, wetlands, building areas, plumbing layout, and the structure of bioretention trenches and wetlands within the development area. Procedures for maintaining stormwater treatment units (Appendix D) and implementing the Sediment And Erosion Control Plan (Appendix C; Appendix E) are enclosed with this plan. These procedures describe how to control erosion, and minimise off-site exports of sediment and nutrients from the proposed development area, during the construction and post- construction phases. A plan for monitoring water quality to demonstrate compliance with water quality objectives is included. ©2010 Simmonds & Bristow Pty Ltd Contrast Constructions 1108-155C - 13 January 2012 I1CLIENTFILES\Contrast Constructions\1108-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documents\1108-155C_SWMP SCEMP_Scanlon Property Group V3.0_ta_120113.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.