Council archive · source document
PART Response to Information Request · OPW11/0335
Very large file (26.7 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
E STABLE GRASSED SURFACE
SOIL STOCKPILE
TEMPORARY BACK-PUSH MOUND
SEDIEMNT FENCE
(SUPPORT POSTS AT 3m CENTRES MAX)
STORMWATER FLOW DIRECTION
x NO ACCESS AREA (STRIP TURF AREA)
NOTES
• PLAN FOR STAGE 1 TEMPORARY SOIL
STOCKPILE ONLY AND DOES NOT INCLUDE
DETAILS FOR CONSTRUCTION PHASE SCEP
REFER TO DWG J-1005-310-09 FOR DETAILS
OF CONSTRUCTION PHASE
• STOCKPILE LOCATION IS INDICATIVE ONLY.
ALTERATION TO STOCPILE DIMENSIONS WILL
REQUIRE THE MOVEMENT OF THE GRASSED,-
RUN-OFF AREAS AND SEDIMENTATION
FENCES TO ACCOMODATE
aaTmAU AM EMSOMAE IMAIN Lew
a MA 1AIE Off
I =r ,144a1! Simmonds & Bristow Pty. Ltd.
CONTRAST CONSTRUCTIONS ESSENCE OF PERIGIAN ^^ei^f rlll PROPOSED SITE EROSION
AS SHOWN
STORMWATER TREATMENT ® ff/TA t Owm
l
WATER & ENVIRONMENTAL ANALYSTS & CONSULTANTS & SEDIMENT CONTROL
MAW TA PLAN, STAGE 1 SOIL AI OSKN1
DESIGN 0M Dis
L ^r^,Y^,l,l114
.Il.lre.^^r.l STOCKPILE 1108-155C
l •4lr^b=Wwd nrdrl
109/12/ 11INITIAL VERSION FA FA 0.
I-A SIM ""FOR WORMTO
o n DATE N Id1TE ... Helping you make good dean water A.C.N. 010252418 RQTN DAT609/12/11 1108-1550-01-08 a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
PART Response to Information RequestRelated documentApplication case desk ↗
About this file
- File size
- 26.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.